2026 T2 Construction Manager Analysis

Jobs, inspection timeliness, QC, return fixes and misc work — per CM, for every job whose major tasks finished in the period.

Built September 9, 2026 from exports dated September 9, 2026 · Owner: Ed Marshall <ed@cascade.build>

2026 T2  ·  May 1 – August 31, 2026  ·  227 jobs

Per-CM scorecard

Construction ManagerJobsTask inspectionsQCReturn fixesMisc tasks
CreditedFullHalfRevenueTotalOn time %QC'dQC'd %On time %Median bus. days lateCountPer jobCountPer job$
Construction ManagerJobsInspectionsQC'dReturn fixes

Head to head

QC coverage and timeliness by completion month

For the jobs whose major tasks finished in each month: the dashed grey line is the share that have any QC record; the solid line is, of those, the share QC’d within 1 business day. Company-wide, all cohort jobs.

Jobs QC’dQC on time (of those QC’d)
Show every cohort job behind this chart

How these numbers are built

Read this before leaning on any QC figure.
127 of the 227 cohort jobs (56%) have no QC record in either system, and the gap is not random: all 30 jobs that finished major tasks in May or June have none — they are 40–90 business days old. The old system’s QC Walk field is blank on every cohort job, and none of the 1,847 old-system QC Walk task records match a cohort job. Either those jobs were never QC’d, or the old system’s records for them did not make it into these exports. Until that is settled, the QC on-time figures describe late-July-onward jobs only.

Two more things to know.
1. The cohort is heavily back-loaded: 174 of 227 jobs (77%) finished major tasks in August, ramping week by week through the month. 2026 T2 is effectively August plus a tail.
2. Inspections on cohort jobs run from December 2025 to September 2026, because work on a job starts well before its major tasks finish. All of them count — the cohort is defined by the job, not by the inspection date.