Completed work vs. work in process, upcoming starts, and won bids — by division and builder.
Trailing 12 months: July 2025 – June 2026.
Generated July 03, 2026 from TrackVia.
$66,843,456
Revenue, trailing 12 mo
1,916
Jobs completed, trailing 12 mo
513
Jobs in process now
$8,578,734
WIP projected revenue
490
Upcoming jobs (not started)
$16,738,538
Est. upcoming value*
$10,608,855
Builder plan top-up†
$35,926,128
Total forward forecast
Forecast by expected completion month
Short term is driven by scheduled work in TrackVia; long range by builder planning forecasts. In process $ = TrackVia
projected revenue for active jobs, by Client End Date month. Upcoming est. $ = estimated value of not-yet-started TrackVia jobs.
†Builder plan top-up = where a builder's planning forecast (currently DR Horton unit objectives, as of April 17, 2026) exceeds scheduled
TrackVia work for that division-month, the difference is added so the forecast reflects the higher figure. Division columns include the top-up.
Rows marked past due are active jobs whose scheduled end date has passed — kept in their scheduled month so slippage
stays visible. Timing basis (Client End Date) to be reviewed monthly.
Expected completion
Ogden
Orem
Salt Lake
St. George
In process $
Upcoming est. $*
Builder plan top-up $†
Total $
TrackVia jobs
May 2023 past due
$0
$0
—
$0
1
Jan 2025 past due
$132,223
$132,223
$0
—
$132,223
1
May 2025 past due
$4,884
$4,884
$0
—
$4,884
1
Dec 2025 past due
$79,946
$79,946
$0
—
$79,946
1
Jan 2026 past due
$110,742
$110,742
$0
—
$110,742
2
Feb 2026 past due
$61,276
$61,276
$0
—
$61,276
12
Mar 2026 past due
$495,916
$76,260
$572,176
$0
—
$572,176
34
Apr 2026 past due
$25,363
$338,355
$316,551
$47,166
—
$363,718
29
May 2026 past due
$17,143
$424,024
$84,887
$123,036
$583,677
$65,413
—
$649,090
56
Jun 2026 past due
$409,603
$1,121,874
$310,677
$302,862
$1,959,587
$185,429
—
$2,145,016
122
Jul 2026
$1,858,217
$3,222,569
$1,455,711
$1,000,534
$3,951,529
$2,338,099
$1,247,403
$7,537,031
252
Aug 2026
$2,553,141
$3,670,906
$1,712,636
$1,118,971
$582,178
$6,617,089
$1,856,387
$9,055,654
220
Sep 2026
$2,045,753
$4,110,827
$1,037,332
$1,016,962
$72,161
$4,240,973
$3,897,738
$8,210,872
129
Oct 2026
$1,338,020
$2,517,666
$374,821
$676,855
$0
$1,300,034
$3,607,327
$4,907,362
39
Nov 2026
$67,331
$240,404
$115,812
$0
$423,546
—
$423,546
10
Dec 2026
$36,409
$206,232
$0
$242,641
—
$242,641
5
Jan 2027
$101,249
$101,249
$0
—
$101,249
2
Mar 2027
$91,875
$0
$91,875
—
$91,875
3
No end date scheduled
$478,620
$331,240
$281,545
$145,420
$50,554
$1,186,271
—
$1,236,825
84
Total
$8,829,600
$17,019,243
$5,616,385
$4,460,899
$8,578,734
$16,738,538
$10,608,855
$35,926,128
1,003
Completed revenue by month
Booked by Client End Date where available, Cascade Final Date otherwise
(80% of trailing-12-month jobs have a Client End Date).
Division & builder detail
Past = jobs completed in the trailing 12 months (by Client End Date, Cascade Final Date fallback). In process = active jobs
(statuses 02–11). Upcoming = TrackVia jobs pending or needing a confirmed start. *Est. upcoming value = upcoming job count × that builder's
average job revenue over the trailing 12 months (division or company average where fewer than 3 completed jobs). †Plan units / Plan top-up =
the builder's planning forecast (currently DR Horton) beyond what's scheduled in TrackVia — plan units are homes, not TrackVia jobs, so they
don't move the job counts. Total forecast $ = WIP projected + upcoming est. + plan top-up.
Orem
Builder
Jobs done (12 mo)
Home equiv.
Revenue (12 mo)
Jobs in process
WIP projected rev.
Jobs upcoming
Est. upcoming value*
Plan units†
Plan top-up $†
Total forecast $
Edge
322
431.4
$11,335,213
50
$1,489,373
85
$2,992,215
—
—
$4,481,587
DR Horton
233
363.9
$10,655,890
36
$1,495,795
45
$2,058,004
239
$4,483,555
$8,037,355
Next Exteriors
12
6.0
$3,124,694
0
$0
0
$0
—
—
$0
Toll Brothers
41
52.3
$1,933,825
11
$648,882
7
$330,165
—
—
$979,048
Woodside
29
60.8
$1,426,327
3
$219,517
7
$344,286
—
—
$563,803
Element Homes
50
56.6
$1,225,551
1
$65,208
0
$0
—
—
$65,208
Ivory
34
37.1
$972,966
23
$534,574
17
$486,483
—
—
$1,021,056
Richmond
61
41.8
$964,230
9
$266,194
6
$94,842
—
—
$361,037
Century
16
31.0
$651,574
7
$0
1
$40,723
—
—
$40,723
Lennar
19
23.8
$587,000
3
$0
5
$154,474
—
—
$154,474
Battle Creek
1
6.3
$405,863
0
$0
0
$0
—
—
$0
Oakwood
19
3.0
$366,806
15
$73,541
0
$0
—
—
$73,541
Pulte Homes
6
8.6
$339,997
21
$0
8
$453,330
—
—
$453,330
Keystone Construction
7
8.2
$214,376
5
$0
12
$367,502
—
—
$367,502
E Builders
5
4.2
$188,949
3
$0
0
$0
—
—
$0
Owner Builder
10
4.5
$162,920
2
$0
0
$0
—
—
$0
Meritage Homes
9
6.6
$131,453
57
$0
10
$146,059
—
—
$146,059
Randy Danjanovich
1
1.6
$103,855
0
$0
0
$0
—
—
$0
In-Line Contracting
4
2.4
$98,125
2
$0
0
$0
—
—
$0
Mountainlands Community Housing Trust
2
3.2
$96,060
0
$0
0
$0
—
—
$0
Revere Homes
3
3.3
$75,128
1
$0
0
$0
—
—
$0
Joe Tucker
1
0.9
$69,245
0
$0
0
$0
—
—
$0
Evolve
1
0.7
$48,071
0
$0
0
$0
—
—
$0
Mahas
1
1.6
$47,232
0
$0
0
$0
—
—
$0
Tri Pointe Homes
1
1.4
$45,784
4
$0
4
$156,869
—
—
$156,869
Hamlet
1
1.3
$32,431
0
$0
0
$0
—
—
$0
Waterscape
1
0.1
$17,081
0
$0
0
$0
—
—
$0
VGI
6
9.2
$16,577
0
$0
0
$0
—
—
$0
Overhead
1
2.1
$15,448
0
$0
0
$0
—
—
$0
Steve Bell
1
0.2
$8,958
0
$0
0
$0
—
—
$0
Charisma Homes
1
0.2
$4,505
0
$0
0
$0
—
—
$0
Nate Stapley
1
0.0
$3,500
0
$0
0
$0
—
—
$0
Rasty Snow
1
0.0
$3,400
0
$0
0
$0
—
—
$0
Barry Decocq
1
0.0
$850
0
$0
0
$0
—
—
$0
Buffalo Construction
0
0.0
$0
0
$0
1
$39,217
—
—
$39,217
Candlelight
0
0.0
$0
1
$0
0
$0
—
—
$0
Destination Homes
0
0.0
$0
1
$0
1
$39,217
—
—
$39,217
One Wolf Construction
0
0.0
$0
0
$0
1
$39,217
—
—
$39,217
Spencer Edwards
0
0.0
$0
1
$0
0
$0
—
—
$0
Total — Orem
902
1,174.1
$35,373,885
256
$4,793,084
210
$7,742,603
239
$4,483,555
$17,019,243
Salt Lake
Builder
Jobs done (12 mo)
Home equiv.
Revenue (12 mo)
Jobs in process
WIP projected rev.
Jobs upcoming
Est. upcoming value*
Plan units†
Plan top-up $†
Total forecast $
Edge
136
196.7
$5,250,136
35
$1,698,834
48
$1,852,989
—
—
$3,551,823
Woodside
58
88.4
$1,904,053
8
$247,435
10
$328,285
—
—
$575,720
Destination Homes
39
55.6
$1,580,359
21
$0
14
$567,308
—
—
$567,308
Hamlet
17
24.0
$1,030,546
3
$128,324
1
$60,620
—
—
$188,944
Element Homes
10
11.8
$374,275
0
$0
0
$0
—
—
$0
McArthur
12
14.2
$328,624
6
$0
7
$191,697
—
—
$191,697
Lennar
17
17.9
$283,834
3
$0
2
$33,392
—
—
$33,392
DR Horton
5
6.8
$155,398
0
$0
0
$0
—
—
$0
Cottonwood Cove HOA
7
2.5
$119,927
0
$0
0
$0
—
—
$0
Rainey Homes
3
4.5
$90,072
3
$0
2
$60,048
—
—
$60,048
VGI
3
6.9
$89,808
0
$0
0
$0
—
—
$0
Sego Homes
2
3.2
$88,760
4
$0
0
$0
—
—
$0
Millbrook Properties
1
0.0
$45,500
0
$0
0
$0
—
—
$0
Dave Stapley
1
0.2
$7,600
0
$0
0
$0
—
—
$0
Richmond
14
0.0
$4,190
0
$0
0
$0
—
—
$0
PDQ Builds
1
0.2
$3,640
0
$0
0
$0
—
—
$0
Regal Homes
2
0.0
$1,700
0
$0
0
$0
—
—
$0
Henry Walker Homes
0
0.0
$0
1
$0
0
$0
—
—
$0
Ivory
0
0.0
$0
0
$0
7
$240,936
—
—
$240,936
Oakwood
1
0.8
$0
0
$0
0
$0
—
—
$0
Owner Builder
1
0.0
$0
0
$0
2
$68,839
—
—
$68,839
Tri Pointe Homes
0
0.0
$0
3
$0
4
$137,678
—
—
$137,678
Total — Salt Lake
330
433.8
$11,358,421
87
$2,074,592
97
$3,541,793
—
—
$5,616,385
St. George
Builder
Jobs done (12 mo)
Home equiv.
Revenue (12 mo)
Jobs in process
WIP projected rev.
Jobs upcoming
Est. upcoming value*
Plan units†
Plan top-up $†
Total forecast $
DR Horton
205
245.8
$5,354,981
35
$757,493
25
$653,046
138
$1,856,183
$3,266,723
Visionary
66
99.7
$2,376,908
16
$158,882
13
$468,179
—
—
$627,061
Richmond
44
48.3
$1,025,402
2
$45,540
1
$23,305
—
—
$68,845
Lennar
33
37.8
$744,681
5
$88,690
6
$135,396
—
—
$224,086
Zwick Construction
7
6.3
$686,305
1
$0
0
$0
—
—
$0
Brix Construction
2
9.7
$309,776
2
$0
0
$0
—
—
$0
Campbell Construction
2
0.0
$222,486
0
$0
0
$0
—
—
$0
Split Rock
6
7.1
$213,532
1
$0
1
$35,589
—
—
$35,589
Goodboro
1
4.8
$87,248
0
$0
0
$0
—
—
$0
Rimrock
1
1.6
$65,882
6
$0
2
$59,649
—
—
$59,649
Boyd Martin Construction
1
0.0
$65,541
0
$0
0
$0
—
—
$0
Big D Construction
2
0.3
$32,258
1
$0
1
$29,825
—
—
$29,825
Grass Creek
2
0.7
$15,271
3
$0
3
$89,474
—
—
$89,474
VGI
2
0.8
$10,834
1
$0
0
$0
—
—
$0
Toll Brothers
2
0.0
$2,911
0
$0
0
$0
—
—
$0
Desert Sage
0
0.0
$0
1
$0
0
$0
—
—
$0
H2 Homes
0
0.0
$0
1
$0
0
$0
—
—
$0
Overhead
0
0.0
$0
1
$0
0
$0
—
—
$0
R&O Construction
0
0.0
$0
0
$0
1
$29,825
—
—
$29,825
Watts Construction
0
0.0
$0
0
$0
1
$29,825
—
—
$29,825
Total — St. George
376
462.8
$11,214,016
76
$1,050,605
54
$1,554,111
138
$1,856,183
$4,460,899
Ogden
Builder
Jobs done (12 mo)
Home equiv.
Revenue (12 mo)
Jobs in process
WIP projected rev.
Jobs upcoming
Est. upcoming value*
Plan units†
Plan top-up $†
Total forecast $
DR Horton
59
91.5
$2,148,115
12
$435,367
24
$873,809
210
$4,269,117
$5,578,293
Visionary
42
49.4
$1,298,721
16
$0
40
$1,236,877
—
—
$1,236,877
Sierra Homes
30
13.2
$955,134
10
$0
7
$222,865
—
—
$222,865
DAI Construction
11
11.1
$915,671
2
$0
4
$332,971
—
—
$332,971
Ivory
29
31.4
$647,747
8
$143,280
16
$357,378
—
—
$500,658
Meritage Homes
22
24.6
$501,324
4
$0
3
$68,362
—
—
$68,362
Fieldstone Homes
13
13.9
$407,504
0
$0
5
$156,732
—
—
$156,732
Regal Homes
14
16.6
$372,686
2
$0
5
$133,102
—
—
$133,102
Destination Homes
7
15.1
$370,922
6
$0
5
$264,944
—
—
$264,944
Henry Walker Homes
6
8.0
$365,687
2
$0
1
$60,948
—
—
$60,948
McArthur
8
8.6
$199,381
4
$0
2
$49,845
—
—
$49,845
VGI
22
33.8
$187,207
1
$0
0
$0
—
—
$0
Hamlet
4
5.2
$151,644
4
$81,805
1
$37,911
—
—
$119,716
Marquee Homes
4
2.3
$135,549
0
$0
0
$0
—
—
$0
Bach
3
3.1
$67,559
0
$0
0
$0
—
—
$0
Dixon Homes
2
2.1
$58,840
0
$0
0
$0
—
—
$0
Owner Builder
2
1.0
$38,367
0
$0
1
$28,887
—
—
$28,887
Richmond
27
0.0
$36,607
2
$0
13
$17,626
—
—
$17,626
Lennar
1
0.9
$19,522
13
$0
2
$57,774
—
—
$57,774
Rainey Homes
2
1.0
$18,949
0
$0
0
$0
—
—
$0
Affinity Construction
0
0.0
$0
1
$0
0
$0
—
—
$0
Jed Slama Construction Group
0
0.0
$0
2
$0
0
$0
—
—
$0
Premier Constructors
0
0.0
$0
3
$0
0
$0
—
—
$0
Stone Peak Construction
0
0.0
$0
1
$0
0
$0
—
—
$0
Unknown
0
0.0
$0
1
$0
0
$0
—
—
$0
Total — Ogden
308
332.7
$8,897,135
94
$660,452
129
$3,900,031
210
$4,269,117
$8,829,600
Long-range layer drill-down (builder plans vs scheduled)
Where the top-up in the forecast above comes from. Plan units = DR Horton 2026 Unit Objectives starts (as of April 17, 2026,
refreshed manually when Horton sends an update), shifted one month to expected completion and valued at that division's trailing-12-month
revenue per home equivalent. TrackVia scheduled = DR Horton work already in the system for that month. Driver shows which source sets the
forecast; the top-up is the amount added on top of scheduled work. Note the basis: this table is by completion month, so its
unit total includes current-month starts (e.g. June starts completing in July) and will read higher than the start-month table above.
Won bids and other builders' plans will layer in the same way as those inputs come online.
Completion month
Division
Plan units
Plan value
TrackVia scheduled
Top-up applied
Driver
Jul 2026
Ogden
49
$1,150,747
$152,932
$997,814
plan
Jul 2026
Orem
44
$1,288,506
$1,143,374
$145,132
plan
Jul 2026
St. George
36
$784,207
$679,751
$104,456
plan
Aug 2026
Ogden
53
$1,244,685
$291,270
$953,415
plan
Aug 2026
Orem
57
$1,669,202
$1,189,069
$480,132
plan
Aug 2026
St. George
35
$762,424
$339,584
$422,840
plan
Sep 2026
Ogden
58
$1,362,108
$145,635
$1,216,473
plan
Sep 2026
Orem
74
$2,167,034
$182,934
$1,984,100
plan
Sep 2026
St. George
38
$827,774
$130,609
$697,165
plan
Oct 2026
Ogden
50
$1,174,231
$72,817
$1,101,414
plan
Oct 2026
Orem
64
$1,874,191
—
$1,874,191
plan
Oct 2026
St. George
29
$631,723
—
$631,723
plan
Nov 2026
Ogden
—
—
$36,409
—
scheduled
Dec 2026
Ogden
—
—
$36,409
—
scheduled
Dec 2026
Orem
—
—
$45,733
—
scheduled
Total
587
$14,936,832
$4,446,527
$10,608,855
Upcoming job starts by month
Per division: Jobs = not-yet-started TrackVia jobs by client start month. Units = builder plan
starts (currently DR Horton unit objectives, as of April 17, 2026). Fcst = the forecast count — non-Horton TrackVia jobs plus
the higher of Horton jobs or Horton plan units, the same rule the $ forecast uses. Jobs and units aren't directly summable (a townhome
building is one job but several units), so Fcst is the planning number.
Start month
Ogden
Orem
Salt Lake
St. George
Total
Jobs
Units
Fcst
Jobs
Units
Fcst
Jobs
Units
Fcst
Jobs
Units
Fcst
Jobs
Units
Fcst
Apr 2026
2
2
2
2
1
1
5
0
5
May 2026
2
2
3
3
1
1
6
0
6
Jun 2026
12
12
16
16
3
3
6
6
37
0
37
Jul 2026
63
53
105
95
57
127
36
36
32
35
50
226
145
318
Aug 2026
37
58
88
77
74
139
35
35
11
38
43
160
170
305
Sep 2026
11
50
58
15
64
78
17
17
3
29
31
46
143
184
Oct 2026
3
3
1
1
3
3
7
0
7
Nov 2026
1
1
2
2
3
0
3
Total
129
161
269
210
195
367
97
0
97
54
102
132
490
458
865
Won bids (sales pipeline)
⚠️ The bid data in TrackVia is pending a refresh — the most recent won bid was received 2026-05-04.
Treat these figures as indicative until the sales data is updated.
163
Bids won
$12,600,424
Sum of current bid amounts
$15,434,111
Sum of projected revenue
Client
# Won
Bid amounts
Projected revenue
Latest received
Zwick Construction
7
$770,532
$2,122,634
2026-03-10
Sego Homes
3
$0
$2,050,000
2025-11-19
DR Horton
21
$785,381
$1,607,567
2026-03-09
Grass Creek
12
$88,632
$1,102,494
2026-04-22
Henry Walker Homes
3
$0
$1,100,000
2026-05-04
David Weekley Homes
1
$0
$1,000,000
2026-01-23
Keystone Construction
1
$0
$1,000,000
2025-08-07
Century
1
$0
$1,000,000
2025-06-17
Kobalt Construction
1
$0
$800,000
—
CG Development
1
$0
$500,000
—
Element Homes
3
$44,842
$400,000
2025-04-08
Tri Pointe Homes
4
$265,546
$380,000
2026-04-14
H2 Homes
1
$0
$281,076
—
Brix Construction
3
$582,018
$249,532
2025-12-02
R&O Construction
1
$211,937
$244,226
2025-09-11
Campbell Construction
2
$78,214
$236,400
2025-08-07
Owner Builder
10
$64,341
$150,000
2026-02-02
Jed Slama Construction Group
2
$141,482
$130,000
2026-03-06
E Builders
10
$1,215,927
$116,465
2025-08-15
Affinity Construction
1
$114,715
$114,715
2026-01-17
Cottonwood Cove HOA
8
$119,428
$110,000
2025-05-02
Candlelight
1
$0
$100,000
2026-01-21
In-Line Contracting
3
$59,243
$87,882
2025-08-07
Watts Construction
1
$0
$78,323
2026-01-21
Randy Danjanovich
1
$0
$75,000
2025-06-20
Boyd Martin Construction
1
$0
$62,435
—
Joe Tucker
1
$67,615
$55,000
2025-05-05
Stone Peak Construction
1
$41,545
$50,000
2025-12-31
Millbrook Properties
1
$24,500
$44,280
2025-08-01
Ivory
1
$46,521
$40,000
2025-04-25
Rainey Homes
1
$52,532
$30,000
2026-03-26
Big D Construction
4
$11,290
$27,000
2026-03-21
Charisma Homes
1
$4,805
$25,582
2024-09-03
Ed Marshall
1
$16,692
$20,000
—
Split Rock
3
$234,390
$10,000
2026-03-16
Toll Brothers
5
$1,117,062
$10,000
2025-10-11
Steve Bell
1
$8,808
$10,000
2025-07-28
Waterscape
1
$0
$5,000
2025-11-18
Rasty Snow
1
$0
$5,000
2025-10-06
Battle Creek
2
$336,672
$3,000
2024-06-20
Greg Adamson
1
$500
$500
2025-05-05
Hamlet
2
$29,435
$0
2026-04-30
Buffalo Construction
1
$204,587
$0
2026-04-08
Rimrock
10
$2,071,846
$0
2026-04-07
Edge
2
$0
$0
2025-01-10
Evolve
1
$48,071
$0
2025-01-10
Spencer Edwards
1
$0
$0
2025-01-10
Chuck Staszkiewicz
1
$30,406
$0
2024-12-18
Torchlight
3
$202,754
$0
2024-12-06
Lennar
1
$0
$0
2024-11-21
Jeff Mendenhall
1
$2,833
$0
2024-11-11
Next Exteriors
1
$3,107,684
$0
2024-11-05
Tom Jones
1
$8,929
$0
2024-11-01
Dan Summerhays
1
$0
$0
2024-10-29
Regal Homes
1
$0
$0
2024-10-28
Goodboro
3
$222,647
$0
2024-10-21
Fieldstone Homes
1
$0
$0
2024-10-16
Anthem Homes
1
$59,762
$0
2024-04-17
Richmond
1
$0
$0
2024-03-28
Mahas
1
$47,232
$0
2024-02-28
Symphony Homes
1
$59,070
$0
2024-01-20
Won = bid status 12–16 (moved to pre-production/production, in production, final billing, needs collection).
Bid amounts/projected revenue are blank in TrackVia for some won bids, so sums understate the true total.
Sources: TrackVia — Job Revenue & Profitability (full export), Jobs General (full export), Bid Info (live).
Data as of July 03, 2026. Test records excluded.