Divisional Forecasting Report

Completed work vs. work in process, upcoming starts, and won bids — by division and builder.
Trailing 12 months: July 2025 – June 2026. Generated July 13, 2026 from TrackVia.
$67,948,064
Revenue, trailing 12 mo
1,950
Jobs completed, trailing 12 mo
516
Jobs in process now
$8,841,237
WIP projected revenue
493
Upcoming jobs (not started)
$16,910,854
Est. upcoming value*
$13,886,594
Builder plan top-up†
$39,638,685
Total forward forecast

Forecast by expected completion month

Short term is driven by scheduled work in TrackVia; long range by builder planning forecasts. In process $ = TrackVia projected revenue for active jobs, by Client End Date month. Upcoming est. $ = estimated value of not-yet-started TrackVia jobs. †Builder plan top-up = where a builder's planning forecast (DR Horton as of April 17, 2026, Lennar as of July 8, 2026, Destination Homes as of March 31, 2025 — stale, refresh requested) exceeds scheduled TrackVia work for that division-month, the difference is added so the forecast reflects the higher figure. Division columns include the top-up. Rows marked past due are active jobs whose scheduled end date has passed — kept in their scheduled month so slippage stays visible. Timing basis (Client End Date) to be reviewed monthly.
Expected completionOgdenOremSalt LakeSt. George In process $Upcoming est. $*Builder plan top-up $†Total $TrackVia jobs
May 2023 past due$0$0$01
Jan 2025 past due$132,223$132,223$0$132,2231
May 2025 past due$4,884$4,884$0$4,8841
Dec 2025 past due$79,946$79,946$0$79,9461
Jan 2026 past due$110,742$110,742$0$110,7422
Feb 2026 past due$61,276$61,276$0$61,27612
Mar 2026 past due$495,916$76,260$572,176$0$572,17634
Apr 2026 past due$25,363$338,672$316,551$47,483$364,03528
May 2026 past due$424,024$25,608$104,707$489,034$65,305$554,33949
Jun 2026 past due$156,041$798,163$205,860$195,071$1,260,602$94,532$1,355,13490
Jul 2026$1,692,177$3,028,560$1,189,118$1,035,750$4,355,587$1,154,121$1,435,897$6,945,605237
Aug 2026$2,758,096$4,230,190$1,579,504$1,050,313$1,155,418$6,434,064$2,028,620$9,618,102241
Sep 2026$2,645,871$4,990,408$1,441,571$1,120,651$118,513$5,183,972$4,896,017$10,198,502156
Oct 2026$1,500,265$2,680,845$614,438$677,323$0$1,650,591$3,822,280$5,472,87151
Nov 2026$191,956$477,575$659,843$0$640,772$688,602$1,329,37416
Dec 2026$161,310$206,408$313,308$0$244,643$436,383$681,0255
Jan 2027$123,074$47,923$539,294$131,495$0$578,796$710,2912
Mar 2027$88,230$0$88,230$88,2303
No end date scheduled$290,747$720,629$167,948$180,607$52,791$1,307,140$1,359,93179
Total$9,544,900$18,673,648$6,979,455$4,440,682$8,841,237$16,910,854$13,886,594$39,638,6851,009

Completed revenue by month

Booked by Client End Date where available, Cascade Final Date otherwise (80% of trailing-12-month jobs have a Client End Date).
$4.6MJul 2025$3.7MAug 2025$3.8MSep 2025$7.7MOct 2025$4.6MNov 2025$3.9MDec 2025$4.6MJan 2026$5.2MFeb 2026$8.4MMar 2026$6.9MApr 2026$7.9MMay 2026$6.6MJun 2026

Division & builder detail

Past = jobs completed in the trailing 12 months (by Client End Date, Cascade Final Date fallback). In process = active jobs (statuses 02–11). Upcoming = TrackVia jobs pending or needing a confirmed start. *Est. upcoming value = upcoming job count × that builder's average job revenue over the trailing 12 months (division or company average where fewer than 3 completed jobs). †Plan units / Plan top-up = the builder's planning forecast (DR Horton, Lennar) beyond what's scheduled in TrackVia — plan units are homes, not TrackVia jobs, so they don't move the job counts. Total forecast $ = WIP projected + upcoming est. + plan top-up. % of revenue = the builder's share of the division's trailing-12-month revenue (consolidated table: share of company revenue) — the builder's weight in the business.

Orem

Builder Jobs done (12 mo)Home equiv.Revenue (12 mo) Jobs in processWIP projected rev. Jobs upcomingEst. upcoming value* Plan units†Plan top-up $†Total forecast $ % of revenue
Edge323432.6$11,359,16253$1,544,30180$2,813,415$4,357,71531.9%
DR Horton235366.2$10,714,08045$1,804,11851$2,325,183239$4,122,743$8,252,04430.0%
Next Exteriors126.0$3,124,6940$00$0$08.8%
Toll Brothers4051.3$1,899,33111$648,8826$284,900$933,7825.3%
Woodside2960.8$1,426,3273$219,5177$344,286$563,8034.0%
Element Homes5056.6$1,225,5511$65,2080$0$65,2083.4%
Ivory3437.1$972,96623$534,57423$658,183$1,192,7562.7%
Richmond6141.8$964,7309$266,1946$94,891$361,0862.7%
Century1631.0$651,5747$01$40,723$40,7231.8%
Lennar1923.8$587,0003$05$154,47452$1,251,896$1,406,3691.6%
Battle Creek16.3$405,8630$00$0$01.1%
Oakwood193.0$366,80615$73,5410$0$73,5411.0%
Pulte Homes68.6$339,99722$07$396,664$396,6641.0%
Keystone Construction89.2$235,2794$011$323,509$323,5090.7%
Meritage Homes1310.8$218,16354$07$117,472$117,4720.6%
E Builders54.2$188,9493$00$0$00.5%
Tri Pointe Homes34.9$175,5832$04$234,110$234,1100.5%
Owner Builder104.5$162,9202$00$0$00.5%
Randy Danjanovich11.6$103,8550$00$0$00.3%
In-Line Contracting42.4$98,1253$00$0$00.3%
Mountainlands Community Housing Trust23.2$96,0600$00$0$00.3%
Revere Homes33.3$75,1281$00$0$00.2%
Joe Tucker10.9$69,2450$00$0$00.2%
Evolve10.7$48,0710$00$0$00.1%
Mahas11.6$47,2320$00$0$00.1%
Hamlet11.3$32,4310$00$0$00.1%
Waterscape10.1$17,0810$00$0$00.0%
VGI69.2$16,5770$00$0$00.0%
Overhead12.1$15,4480$00$0$00.0%
Steve Bell10.2$8,9580$00$0$00.0%
Charisma Homes10.2$4,5050$00$0$00.0%
Nate Stapley10.0$3,5000$00$0$00.0%
Rasty Snow10.0$3,4000$00$0$00.0%
Barry Decocq10.0$8500$00$0$00.0%
Buffalo Construction00.0$00$01$39,143$39,1430.0%
Candlelight00.0$01$00$0$00.0%
Destination Homes00.0$01$01$39,14310$237,435$276,5780.0%
One Wolf Construction00.0$00$01$39,143$39,1430.0%
Spencer Edwards00.0$01$00$0$00.0%
Total — Orem 9111,185.5$35,659,442 264$5,156,335 211$7,905,240 301$5,612,073 $18,673,648 100.0%

Salt Lake

Builder Jobs done (12 mo)Home equiv.Revenue (12 mo) Jobs in processWIP projected rev. Jobs upcomingEst. upcoming value* Plan units†Plan top-up $†Total forecast $ % of revenue
Edge137198.8$5,311,14038$1,770,65448$1,860,837$3,631,49146.2%
Woodside6090.3$1,949,0979$268,3938$259,880$528,27317.0%
Destination Homes4055.6$1,583,48923$011$435,45977$1,757,699$2,193,15913.8%
Hamlet1724.0$1,030,5463$128,3241$60,620$188,9449.0%
Element Homes1011.8$374,2750$00$0$03.3%
McArthur1214.2$328,6246$06$164,312$164,3122.9%
Lennar1818.9$299,8592$02$33,3182$33,3182.6%
DR Horton56.8$155,3980$00$0$01.4%
Cottonwood Cove HOA72.5$119,9270$00$0$01.0%
Rainey Homes34.5$90,0725$00$0$00.8%
VGI36.9$89,9580$00$0$00.8%
Sego Homes23.2$88,7604$00$0$00.8%
Millbrook Properties10.0$45,5000$00$0$00.4%
Dave Stapley10.2$7,6000$00$0$00.1%
Richmond140.0$4,1900$00$0$00.0%
PDQ Builds10.2$3,6400$00$0$00.0%
Regal Homes20.0$1,7000$00$0$00.0%
Henry Walker Homes00.0$01$00$0$00.0%
Oakwood10.8$00$00$0$00.0%
Owner Builder10.0$02$01$34,280$34,2800.0%
Tri Pointe Homes00.0$03$06$205,680$205,6800.0%
Total — Salt Lake 335438.9$11,483,774 96$2,167,371 83$3,054,386 79$1,757,699 $6,979,455 100.0%

St. George

Builder Jobs done (12 mo)Home equiv.Revenue (12 mo) Jobs in processWIP projected rev. Jobs upcomingEst. upcoming value* Plan units†Plan top-up $†Total forecast $ % of revenue
DR Horton204244.7$5,335,18940$837,54724$627,669138$1,804,824$3,270,03947.0%
Visionary70104.0$2,470,62614$185,09013$458,831$643,92121.8%
Richmond4448.3$1,025,4023$72,7840$0$72,7849.0%
Lennar3640.9$808,3752$40,0176$134,729$174,7467.1%
Zwick Construction76.3$686,3051$00$0$06.0%
Brix Construction29.7$309,7762$00$0$02.7%
Campbell Construction20.0$222,4860$00$0$02.0%
Split Rock67.1$213,5321$02$71,177$71,1771.9%
Goodboro14.8$87,2480$00$0$00.8%
Rimrock11.6$65,8826$02$59,433$59,4330.6%
Boyd Martin Construction10.0$65,5410$00$0$00.6%
Big D Construction20.3$32,2581$01$29,716$29,7160.3%
Grass Creek20.7$15,2713$03$89,149$89,1490.1%
VGI20.8$10,8341$00$0$00.1%
Toll Brothers20.0$2,9110$00$0$00.0%
Desert Sage00.0$01$00$0$00.0%
H2 Homes00.0$01$00$0$00.0%
Overhead00.0$01$00$0$00.0%
Watts Construction00.0$00$01$29,716$29,7160.0%
Total — St. George 382469.1$11,351,636 77$1,135,438 52$1,500,421 138$1,804,824 $4,440,682 100.0%

Ogden

Builder Jobs done (12 mo)Home equiv.Revenue (12 mo) Jobs in processWIP projected rev. Jobs upcomingEst. upcoming value* Plan units†Plan top-up $†Total forecast $ % of revenue
DR Horton63101.8$2,408,8107$181,52923$879,407210$4,116,582$5,177,51825.5%
Visionary4653.8$1,409,72812$035$1,072,619$1,072,61914.9%
Sierra Homes3113.3$976,0185$017$535,236$535,23610.3%
DAI Construction1111.1$915,6715$03$249,728$249,7289.7%
Ivory3032.4$673,0009$171,77622$493,533$665,3107.1%
Meritage Homes2224.6$501,3244$03$68,362$68,3625.3%
Henry Walker Homes78.8$415,1771$01$59,311$59,3114.4%
Fieldstone Homes1313.9$407,5040$05$156,732$156,7324.3%
Regal Homes1517.8$400,9720$05$133,657$133,6574.2%
Destination Homes715.1$370,9225$05$264,94433$554,865$819,8093.9%
McArthur88.6$199,3814$02$49,845$49,8452.1%
VGI2233.8$187,2071$00$0$02.0%
Hamlet56.4$180,2082$28,7889$324,374$353,1621.9%
Marquee Homes42.3$135,5490$00$0$01.4%
Bach33.1$67,5590$00$0$00.7%
Dixon Homes22.1$58,8400$00$0$00.6%
Owner Builder21.0$38,3670$01$29,358$29,3580.4%
Richmond270.0$36,6073$012$16,270$16,2700.4%
Sterling Homes11.3$31,9000$00$0$00.3%
Lennar10.9$19,52213$02$58,7164$40,551$99,2670.2%
Rainey Homes21.0$18,9490$00$0$00.2%
Affinity Construction00.0$01$00$0$00.0%
Jed Slama Construction Group00.0$02$00$0$00.0%
Premier Constructors00.0$03$00$0$00.0%
Stone Peak Construction00.0$01$01$29,358$29,3580.0%
Unknown00.0$01$00$0$00.0%
Vantage Builders00.0$00$01$29,358$29,3580.0%
Total — Ogden 322353.1$9,453,213 79$382,094 147$4,450,808 247$4,711,998 $9,544,900 100.0%

All divisions — consolidated by builder

Builder Jobs done (12 mo)Home equiv.Revenue (12 mo) Jobs in processWIP projected rev. Jobs upcomingEst. upcoming value* Plan units†Plan top-up $†Total forecast $ % of revenue
DR Horton507719.4$18,613,47792$2,823,19398$3,832,259587$10,044,149$16,699,60127.4%
Edge460631.4$16,670,30291$3,314,955128$4,674,252$7,989,20724.5%
Visionary116157.7$3,880,35426$185,09048$1,531,450$1,716,5405.7%
Woodside89151.1$3,375,42312$487,91115$604,165$1,092,0765.0%
Next Exteriors126.0$3,124,6940$00$0$04.6%
Richmond14690.0$2,030,92815$338,97818$111,161$450,1403.0%
Destination Homes4770.7$1,954,41129$017$739,547120$2,549,999$3,289,5462.9%
Toll Brothers4251.3$1,902,24211$648,8826$284,900$933,7822.8%
Lennar7484.6$1,714,75620$40,01715$381,23658$1,292,446$1,713,7002.5%
Ivory6469.5$1,645,96632$706,35045$1,151,716$1,858,0662.4%
Element Homes6068.4$1,599,8261$65,2080$0$65,2082.4%
Hamlet2331.8$1,243,1855$157,11210$384,994$542,1061.8%
Sierra Homes3113.3$976,0185$017$535,236$535,2361.4%
DAI Construction1111.1$915,6715$03$249,728$249,7281.3%
Meritage Homes3535.4$719,48758$010$185,835$185,8351.1%
Zwick Construction76.3$686,3051$00$0$01.0%
Century1631.0$651,5747$01$40,723$40,7231.0%
McArthur2022.8$528,00510$08$214,157$214,1570.8%
Henry Walker Homes78.8$415,1772$01$59,311$59,3110.6%
Fieldstone Homes1313.9$407,5040$05$156,732$156,7320.6%
Battle Creek16.3$405,8630$00$0$00.6%
Regal Homes1717.8$402,6720$05$133,657$133,6570.6%
Oakwood203.9$366,80615$73,5410$0$73,5410.5%
Pulte Homes68.6$339,99722$07$396,664$396,6640.5%
Brix Construction29.7$309,7762$00$0$00.5%
VGI3350.8$304,5762$00$0$00.4%
Keystone Construction89.2$235,2794$011$323,509$323,5090.3%
Campbell Construction20.0$222,4860$00$0$00.3%
Split Rock67.1$213,5321$02$71,177$71,1770.3%
Owner Builder135.5$201,2874$02$63,638$63,6380.3%
E Builders54.2$188,9493$00$0$00.3%
Tri Pointe Homes34.9$175,5835$010$439,790$439,7900.3%
Marquee Homes42.3$135,5490$00$0$00.2%
Cottonwood Cove HOA72.5$119,9270$00$0$00.2%
Rainey Homes55.5$109,0215$00$0$00.2%
Randy Danjanovich11.6$103,8550$00$0$00.2%
In-Line Contracting42.4$98,1253$00$0$00.1%
Mountainlands Community Housing Trust23.2$96,0600$00$0$00.1%
Sego Homes23.2$88,7604$00$0$00.1%
Goodboro14.8$87,2480$00$0$00.1%
Revere Homes33.3$75,1281$00$0$00.1%
Joe Tucker10.9$69,2450$00$0$00.1%
Bach33.1$67,5590$00$0$00.1%
Rimrock11.6$65,8826$02$59,433$59,4330.1%
Boyd Martin Construction10.0$65,5410$00$0$00.1%
Dixon Homes22.1$58,8400$00$0$00.1%
Evolve10.7$48,0710$00$0$00.1%
Mahas11.6$47,2320$00$0$00.1%
Millbrook Properties10.0$45,5000$00$0$00.1%
Big D Construction20.3$32,2581$01$29,716$29,7160.0%
Sterling Homes11.3$31,9000$00$0$00.0%
Waterscape10.1$17,0810$00$0$00.0%
Overhead12.1$15,4481$00$0$00.0%
Grass Creek20.7$15,2713$03$89,149$89,1490.0%
Steve Bell10.2$8,9580$00$0$00.0%
Dave Stapley10.2$7,6000$00$0$00.0%
Charisma Homes10.2$4,5050$00$0$00.0%
PDQ Builds10.2$3,6400$00$0$00.0%
Nate Stapley10.0$3,5000$00$0$00.0%
Rasty Snow10.0$3,4000$00$0$00.0%
Barry Decocq10.0$8500$00$0$00.0%
Affinity Construction00.0$01$00$0$00.0%
Buffalo Construction00.0$00$01$39,143$39,1430.0%
Candlelight00.0$01$00$0$00.0%
Desert Sage00.0$01$00$0$00.0%
H2 Homes00.0$01$00$0$00.0%
Jed Slama Construction Group00.0$02$00$0$00.0%
One Wolf Construction00.0$00$01$39,143$39,1430.0%
Premier Constructors00.0$03$00$0$00.0%
Spencer Edwards00.0$01$00$0$00.0%
Stone Peak Construction00.0$01$01$29,358$29,3580.0%
Unknown00.0$01$00$0$00.0%
Vantage Builders00.0$00$01$29,358$29,3580.0%
Watts Construction00.0$00$01$29,716$29,7160.0%
Total — all divisions1,9502,446.6$67,948,064516$8,841,237493$16,910,854765$13,886,594$39,638,685100.0%

Long-range layer drill-down (builder plans vs scheduled)

Where the top-up in the forecast above comes from. Plan units = builder planning forecasts (DR Horton as of April 17, 2026, Lennar as of July 8, 2026, Destination Homes as of March 31, 2025 — stale, refresh requested; DR Horton from its Unit Objectives workbook, Lennar from its SOPs and dig schedule, both refreshed manually and filtered to communities we service), shifted one month to expected completion and valued at that builder-division's trailing-12-month revenue per home equivalent. TrackVia scheduled = that builder's work already in the system for that month. Driver shows which source sets the forecast; the top-up is the amount added on top of scheduled work. Note the basis: this table is by completion month, so its unit total includes current-month starts (e.g. June starts completing in July) and will read higher than the start-month table above. Won bids and other builders' plans will layer in the same way as those inputs come online.
Completion monthBuilderDivisionPlan units Plan valueTrackVia scheduledTop-up appliedDriver
Jul 2026DR HortonOgden49$1,159,971$90,021$1,069,950plan
Jul 2026DR HortonOrem44$1,287,303$1,087,527$199,776plan
Jul 2026DR HortonSt. George36$785,064$618,895$166,170plan
Jul 2026LennarOrem$61,789scheduled
Jul 2026LennarSt. George$40,017scheduled
Aug 2026DR HortonOgden53$1,254,663$497,056$757,606plan
Aug 2026DR HortonOrem57$1,667,643$1,417,394$250,249plan
Aug 2026DR HortonSt. George35$763,257$428,778$334,479plan
Aug 2026Destination HomesOgden4$98,460$105,978scheduled
Aug 2026Destination HomesSalt Lake11$313,308$237,523$75,785plan
Aug 2026LennarOgden2$40,551$58,716scheduled
Aug 2026LennarOrem26$641,395$30,895$610,500plan
Aug 2026LennarSalt Lake2$31,731$33,318scheduled
Aug 2026LennarSt. George$44,910scheduled
Sep 2026DR HortonOgden58$1,373,027$152,940$1,220,087plan
Sep 2026DR HortonOrem74$2,165,010$319,143$1,845,867plan
Sep 2026DR HortonSt. George38$828,679$156,917$671,762plan
Sep 2026Destination HomesOgden8$196,919$105,978$90,941plan
Sep 2026Destination HomesOrem5$138,289$39,143$99,146plan
Sep 2026Destination HomesSalt Lake17$484,204$197,936$286,268plan
Sep 2026LennarOgden2$40,551$40,551plan
Sep 2026LennarOrem26$641,395$641,395plan
Sep 2026LennarSt. George$44,910scheduled
Oct 2026DR HortonOgden50$1,183,644$114,705$1,068,939plan
Oct 2026DR HortonOrem64$1,872,441$45,592$1,826,849plan
Oct 2026DR HortonSt. George29$632,413$632,413plan
Oct 2026Destination HomesOgden6$147,689$52,989$94,700plan
Oct 2026Destination HomesSalt Lake7$199,378$199,378plan
Oct 2026LennarOrem$30,895scheduled
Oct 2026LennarSt. George$44,910scheduled
Nov 2026DR HortonOgden$38,235scheduled
Nov 2026Destination HomesOgden5$123,074$123,074plan
Nov 2026Destination HomesOrem5$138,289$138,289plan
Nov 2026Destination HomesSalt Lake15$427,239$427,239plan
Dec 2026DR HortonOgden$38,235scheduled
Dec 2026DR HortonOrem$45,592scheduled
Dec 2026Destination HomesOgden5$123,074$123,074plan
Dec 2026Destination HomesSalt Lake11$313,308$313,308plan
Jan 2027Destination HomesOgden5$123,074$123,074plan
Jan 2027Destination HomesSalt Lake16$455,721$455,721plan
Total765$19,650,767$6,180,934$13,886,594

Historical starts by month

Actual TrackVia job starts by client start month, trailing 12 months, all statuses — the reality check for the forecast starts below. Job counts, so compare against the Jobs and Fcst columns (a townhome building is one job).
Start monthOgdenOremSalt LakeSt. GeorgeTotal
Jul 20258922139160
Aug 202511832236152
Sep 20254871828137
Oct 20255832544157
Nov 202527732326149
Dec 202537932734191
Jan 2026561174040253
Feb 2026391213625221
Mar 2026651465538304
Apr 2026721425941314
May 2026581265225261
Jun 2026631164838265
Total4451,2794264142,564
Monthly average371073634214

Upcoming job starts by month

Per division: Jobs = not-yet-started TrackVia jobs by client start month. Units = builder plan starts (DR Horton as of April 17, 2026, Lennar as of July 8, 2026, Destination Homes as of March 31, 2025 — stale, refresh requested). Fcst = the forecast count — TrackVia jobs, with each plan builder's contribution lifted to its plan units where those are higher, the same rule the $ forecast uses. Jobs and units aren't directly summable (a townhome building is one job but several units), so Fcst is the planning number.
Start monthOgdenOremSalt LakeSt. GeorgeTotal
JobsUnitsFcstJobsUnitsFcstJobsUnitsFcstJobsUnitsFcstJobsUnitsFcst
Jun 202511101
Mar 202611101
Apr 2026221111404
May 2026221111404
Jun 2026121210104426026
Jul 202662591077583133251333273547189190320
Aug 2026546811593105176311744163846194228381
Sep 2026135664246485197223293159156202
Oct 202635835861521122537
Nov 202615622111131619
Dec 202655161602121
Total1471983192112574188379149521021304936361,016

Won bids (sales pipeline)

⚠️ The bid data in TrackVia is pending a refresh — the most recent won bid was received 2026-05-04. Treat these figures as indicative until the sales data is updated.
163
Bids won
$12,600,424
Sum of current bid amounts
$15,434,111
Sum of projected revenue
Client# WonBid amountsProjected revenueLatest received
Zwick Construction7$770,532$2,122,6342026-03-10
Sego Homes3$0$2,050,0002025-11-19
DR Horton21$785,381$1,607,5672026-03-09
Grass Creek12$88,632$1,102,4942026-04-22
Henry Walker Homes3$0$1,100,0002026-05-04
David Weekley Homes1$0$1,000,0002026-01-23
Keystone Construction1$0$1,000,0002025-08-07
Century1$0$1,000,0002025-06-17
Kobalt Construction1$0$800,000
CG Development1$0$500,000
Element Homes3$44,842$400,0002025-04-08
Tri Pointe Homes4$265,546$380,0002026-04-14
H2 Homes1$0$281,076
Brix Construction3$582,018$249,5322025-12-02
R&O Construction1$211,937$244,2262025-09-11
Campbell Construction2$78,214$236,4002025-08-07
Owner Builder10$64,341$150,0002026-02-02
Jed Slama Construction Group2$141,482$130,0002026-03-06
E Builders10$1,215,927$116,4652025-08-15
Affinity Construction1$114,715$114,7152026-01-17
Cottonwood Cove HOA8$119,428$110,0002025-05-02
Candlelight1$0$100,0002026-01-21
In-Line Contracting3$59,243$87,8822025-08-07
Watts Construction1$0$78,3232026-01-21
Randy Danjanovich1$0$75,0002025-06-20
Boyd Martin Construction1$0$62,435
Joe Tucker1$67,615$55,0002025-05-05
Stone Peak Construction1$41,545$50,0002025-12-31
Millbrook Properties1$24,500$44,2802025-08-01
Ivory1$46,521$40,0002025-04-25
Rainey Homes1$52,532$30,0002026-03-26
Big D Construction4$11,290$27,0002026-03-21
Charisma Homes1$4,805$25,5822024-09-03
Ed Marshall1$16,692$20,000
Split Rock3$234,390$10,0002026-03-16
Toll Brothers5$1,117,062$10,0002025-10-11
Steve Bell1$8,808$10,0002025-07-28
Waterscape1$0$5,0002025-11-18
Rasty Snow1$0$5,0002025-10-06
Battle Creek2$336,672$3,0002024-06-20
Greg Adamson1$500$5002025-05-05
Hamlet2$29,435$02026-04-30
Buffalo Construction1$204,587$02026-04-08
Rimrock10$2,071,846$02026-04-07
Edge2$0$02025-01-10
Evolve1$48,071$02025-01-10
Spencer Edwards1$0$02025-01-10
Chuck Staszkiewicz1$30,406$02024-12-18
Torchlight3$202,754$02024-12-06
Lennar1$0$02024-11-21
Jeff Mendenhall1$2,833$02024-11-11
Next Exteriors1$3,107,684$02024-11-05
Tom Jones1$8,929$02024-11-01
Dan Summerhays1$0$02024-10-29
Regal Homes1$0$02024-10-28
Goodboro3$222,647$02024-10-21
Fieldstone Homes1$0$02024-10-16
Anthem Homes1$59,762$02024-04-17
Richmond1$0$02024-03-28
Mahas1$47,232$02024-02-28
Symphony Homes1$59,070$02024-01-20
Won = bid status 12–16 (moved to pre-production/production, in production, final billing, needs collection). Bid amounts/projected revenue are blank in TrackVia for some won bids, so sums understate the true total.
Sources: TrackVia — Job Revenue & Profitability (full export), Jobs General (full export), Bid Info (live). Builder plans: DR Horton 2026 Unit Objectives (April 17, 2026); Lennar UTAH Jul/Aug SOPs + dig schedule (July 8, 2026), filtered to communities Cascade services. Data as of July 13, 2026. Test records excluded.