Job Extras — Multiple Tasks

Last 3 months  ·  Pulled June 24, 2026

93 Extras
By Type:
VPO56
Misc. Work37
Task Count:
2 tasks92 extras
5 tasks1 extras
Showing 93 extras
Created Job Name Type Status # Tasks Tasks Assigned Charge $
June 24, 2026 2017-Wildflower-Toll Brothers Fix scratch Misc. Work 04. In Progress 2 602. ⏳ Misc. Work: Pending (Assigned 2026-06-24) - Jose Quinonez -
602. ⏳ Misc. Work: Pending (Assigned 2026-06-25) - Jose Quinonez -
90
June 23, 2026 Jared Bingham Remodel-Custom Jobs (Pleasant Grove)-Owner Builder Swap siding on stair VPO 04. In Progress 2 651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Guillermo Mondragon -
651. ⭕ VPO Work: Unassigned -
180
June 22, 2026 111-Capitol Reef-Edge Reparar andamio VPO 04. In Progress 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-22
651. ⏳ VPO Work: Pending (Assigned 2026-06-24) - Alan Gonzalez -
150
June 22, 2026 127-Capitol Reef-Edge Reparar andamio VPO 04. In Progress 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-22
651. ⏳ VPO Work: Pending (Assigned 2026-06-24) - Alan Gonzalez -
150
June 22, 2026 116-Canyon Park-Tri Pointe Homes Reset scaffold VPO 04. In Progress 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Hector Moreta - 2026-06-23
651. ⏳ VPO Work: Pending (Assigned 2026-06-22) - Ernesto Ramirez -
270
June 19, 2026 Bldg 4-Inverness Townhomes-DR Horton Remover soffit y siding VPO 05. Needs Field Work Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-20
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-22
240
June 19, 2026 Bldg 29-Mt. Rainier-Edge Reparar andamio VPO 04. In Progress 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19
651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Alan Gonzalez -
180
June 19, 2026 108-Capitol Reef-Edge Reparar andamio VPO 04. In Progress 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19
651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Alan Gonzalez -
150
June 18, 2026 903-Harmony Ridge-Edge Add lath and brown Misc. Work 04. In Progress 2 602. ⏳ Misc. Work: In Progress (Started 2026-06-22) - Oscar Ibarra -
602. ⏳ Misc. Work: Pending (Assigned 2026-06-19) - Jose Ceferino Benitez Urquilla -
50
June 18, 2026 905-Harmony Ridge-Edge Trip charge VPO 04. In Progress 2 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Jaime Genchi Vargas -
651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Jaime Genchi Vargas -
180
June 18, 2026 905-Harmony Ridge-Edge Trip charge VPO 04. In Progress 2 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Joaquin Feresin -
651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Joaquin Feresin -
180
June 17, 2026 79-Elk Ridge-Toll Brothers Repairs Misc. Work 04. In Progress 2 602. ✅ Misc. Work: Complete - Euddy Enrique Rodriguez-Chima - 2026-06-23
602. ⭕ Misc. Work: Unassigned -
100
June 17, 2026 116-Canyon Park-Tri Pointe Homes Plan error Misc. Work 04. In Progress 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Innacio Portio - 2026-06-19
602. ⏳ Misc. Work: Pending (Assigned 2026-06-23) - Jose Evangelista -
0
June 16, 2026 29-Lakeview Fields-Keystone Construction Stucco touch ups Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Melissa Camacho - 2026-06-17
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Melissa Camacho - 2026-06-17
480
June 16, 2026 4 (Larson Residence)-Springside Meadows-Owner Builder gutter repair Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-06-18
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-06-18
270
June 16, 2026 207-Stratton Acres-Meritage Homes add lap siding under deck ledger Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Alex Salinas - 2026-06-16
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-17
170
June 16, 2026 208-Stratton Acres-Meritage Homes lap siding under deck Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Alex Salinas - 2026-06-16
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-17
260
June 15, 2026 Bldg 213-Mountain Ridge-Edge Remover soffit Misc. Work 04. In Progress 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Francisco Dominguez Hernandez - 2026-06-15
602. ⭕ Misc. Work: Unassigned -
180
June 15, 2026 3-Red Slate Estates-Richmond Stucco Repair VPO 04. In Progress 2 651. ⏳ VPO Work: Pending (Assigned 2026-06-16) - Francisco Juarez -
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Diego Martin - 2026-06-23
840
June 15, 2026 Units 12-15-Holladay Hills Townhomes-Tri Pointe Homes Scaffolding VPO 05. Needs Field Work Complete 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-18
210
June 15, 2026 121-Capitol Reef-Edge Reparar andamio VPO 05. Needs Field Work Complete 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-15
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19
150
June 12, 2026 255-Viridian-DR Horton basement door sideing Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Innacio Portio - 2026-06-12
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-15
230
June 10, 2026 Bldg 65-Harmony Ridge-Edge Small repairs Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-10
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-10
140
June 09, 2026 302-Legacy Park-Ivory Re-do siding VPO 05. Needs Field Work Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Francisco Saavedra - 2026-06-10
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jaime Villa Rangel - 2026-06-14
1630
June 09, 2026 Bldg 29-Mt. Rainier-Edge Complete housewrap after window installation VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-06-09
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-06-09
300
June 09, 2026 Units 457-458-Daybreak Duets-Destination Homes Chimney cap Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10
300
June 09, 2026 Units 251-252-Paired Villas-Sego Homes Chimney cap Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10
360
June 08, 2026 222-Bristol Farms-Regal Homes Paper and wire VPO 04. In Progress 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-09
651. ⏳ VPO Work: Pending (Assigned 2026-06-10) - Jose Ceferino Benitez Urquilla -
180
June 08, 2026 Bldg 5-Taylor Villas-Edge Reset scaff from drywall VPO 05. Needs Field Work Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09
300
June 08, 2026 2022-Wildflower-Toll Brothers Install cap on column Misc. Work 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-10
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-10
600
June 08, 2026 901-Harmony Ridge-Edge Trip charge to complete paper and wire around window installed after initial visit. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ricardo Anastacio Mejia - 2026-06-09
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09
100
June 08, 2026 Bldg 30-Viridian Townhomes-DR Horton soffit repair Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-08
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-08
90
June 08, 2026 128-Montreux-DR Horton Box around trusses with siding – add soffit to complete front porch VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Elias Prudente - 2026-06-09
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roger Guzman - 2026-06-09
300
June 05, 2026 Bldg K-Daybreak Downtown-Sego Homes Paint Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-09
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-09
90
June 04, 2026 5-Riley Park-DR Horton Add gutter VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-14
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Anderson Benegas Guzman - 2026-06-05
180
June 04, 2026 5-Riley Park-DR Horton Fill in gaps with stucco color of RV garage VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Abel San Juan Bacilio - 2026-06-06
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Abel San Juan Bacilio - 2026-06-08
180
June 04, 2026 903-Harmony Ridge-Edge Reset scaff that was removed for drywall. VPO 09. Archive 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Javier Vazquez - 2026-06-04
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Javier Vazquez - 2026-06-04
100
May 29, 2026 Bldg 62-Harmony Ridge-Edge Angle iron VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-05-30
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-06-01
270
May 29, 2026 724-Broadview Shores-Ivory Trip charge to return and finish housewrap, wrap around the drywall stock window and lath of front and back porche. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alfredo Chavarin Lopez - 2026-05-29
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Rodrigo Alcantar - 2026-06-01
280
May 28, 2026 Irva Tooele Retail Drive Through-Commercial-Affinity Construction House wrap repairs VPO 04. In Progress 2 651. ⏳ VPO Work: Pending (Assigned 2026-05-28) - Armando Adame -
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Armando Adame - 2026-06-04
230
May 28, 2026 TH 3-Flint Acres-Henry Walker Homes Paint touch ups Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Kevin Nehemias - 2026-05-29
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Kevin Nehemias - 2026-05-29
500
May 28, 2026 Bldg 47-Harmony Ridge-Edge Window repairs Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Crescencio Bernal Lopez - 2026-06-01
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-02
110
May 28, 2026 298-Viridian-DR Horton redo stucco Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Omar Perez Padilla - 2026-06-02
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Omar Perez Padilla - 2026-05-28
140
May 28, 2026 Bldg 7-Montreux Townhomes-DR Horton Install siding around first floor window that was replaced. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Gerardo Juarez - 2026-05-28
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Elias Prudente - 2026-06-04
200
May 27, 2026 4280-Long Valley-DR Horton Reset scaff on right side of house for the Gas pipeline installation VPO 09. Archive 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Marcos Mata - 2026-05-28
305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Marcos Mata - 2026-06-02
100
May 27, 2026 5-Riley Park-DR Horton Siding needed around garages. Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Armando Adame - 2026-05-28
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Juan Rivera - 2026-06-03
420
May 27, 2026 287-Daybreak-Rainey Homes Brown and color. Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-01
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-01
1280
May 27, 2026 Bldg 64-Harmony Ridge-Edge Stucco brown VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27
180
May 27, 2026 223-Stratton Acres-Meritage Homes Trip charge to repair siding damaged by other trade. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-06-02
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-06-02
150
May 27, 2026 1029-Northstar Ranch-Destination Homes Reset scaff that was removed for gas pipeline. VPO 06. Needs Billing Complete 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-11
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-01
150
May 27, 2026 38-Tanner Flats-Ivory Vent repair Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-28
602. ⭕ Misc. Work: Unassigned (Pass (Aprobado)) - 2026-06-16
240
May 27, 2026 62-Elk Ridge-Toll Brothers Foundation plaster VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - William Portio - 2026-05-29
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Isaac Arellano - 2026-05-31
230
May 26, 2026 Bldg 63-Harmony Ridge-Edge Angle iron VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-27
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-27
180
May 26, 2026 Bldg 11-Inverness Townhomes-DR Horton Reinstall Housewrap and siding after drwall in installed. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Brayan Figueroa - 2026-05-28
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-03
1330
May 26, 2026 207-Weston Field-Hamlet Install soffit on back deck after team added electrical boxes. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-01
705. ✅ Scaff Pickup: Complete (Pass (Aprobado)) - Juan Pablo Moreno - 2026-06-01
275
May 26, 2026 Bldg 1-Dixon Creek-DR Horton Remove and reset scaff for gas meter installation. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Luis Carlos Jordan Ibarra - 2026-05-29
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Miguel Adame Alvis - 2026-06-10
320
May 22, 2026 Bldg 64-Harmony Ridge-Edge Angle iron VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23
180
May 22, 2026 Bldg 65-Harmony Ridge-Edge Angle iron VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23
180
May 21, 2026 62-Elk Ridge-Toll Brothers Paint the framing on the deck in black VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Angel E. Lopez-Corado - 2026-05-21
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-29
650
May 21, 2026 79-Elk Ridge-Toll Brothers Paint the framing on the back deck in black. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Angel E. Lopez-Corado - 2026-05-21
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-02
550
May 21, 2026 Units 141-146-Daybreak Urban Townhomes-Destination Homes Add paper and wire in between the 2x10 under the decks. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27
270
May 21, 2026 Bldg 31-Viridian Townhomes-DR Horton photo cell covered Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Marco Antonio Valderrama - 2026-05-21
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-28
180
May 20, 2026 610-Harmony Ridge-Edge Touch ups Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-20
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-20
210
May 20, 2026 495-Ridgeview Cottages-Ivory Finish. Siding Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Efrain Diaz-Lopez - 2026-05-21
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-11
230
May 20, 2026 Bldg 18-Silver Oaks-Lennar Housewrap repairs around first floor windows. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ronnie Moratalla - 2026-05-25
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-28
150
May 19, 2026 89-Elk Ridge-Toll Brothers Add plastic to front door at porch , both outside and inside. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Juan Fernando Evangelista Rodriguez - 2026-05-19
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Juan Fernando Evangelista Rodriguez - 2026-05-20
180
May 19, 2026 Bldg 60-Inverness Townhomes-DR Horton Instalar flashing en columna Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Fernando Abelino - 2026-05-21
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Fernando Abelino - 2026-05-21
50
May 19, 2026 Bldg 22-Inverness Townhomes-DR Horton Terminar columnas VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-20
180
May 19, 2026 109-Palomino-DR Horton House wrap VPO 04. In Progress 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19
651. ⏳ VPO Work: Pending (Assigned 2026-05-21) - Luis Aguillar -
180
May 19, 2026 809-Broadview Shores-Ivory Replace damaged downspout Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-05-19
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-05-19
90
May 18, 2026 208-Stratton Acres-Meritage Homes Trip charge to wrap Columns/beams, framing was not complete initially. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ismael Martinez - 2026-06-06
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ismael Martinez - 2026-06-06
150
May 18, 2026 206-Stratton Acres-Meritage Homes Columns/beam Misc. Work 04. In Progress 2 602. ✅ Misc. Work: Complete (Fail (Fallado)) - Roberto Lamas-Arellano - 2026-05-20
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-02
270
May 18, 2026 Units 457-458-Daybreak Duets-Destination Homes Trip charge to complete housewrap around drywall windows — could not be completed during initial visit as windows were not yet installed. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Daniel Rodriguez - 2026-05-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ronnie Moratalla - 2026-05-20
150
May 14, 2026 Bldg 24-Mt. Rainier-Edge Reinstall lath that was removed to install windows. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-15
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-15
200
May 14, 2026 369-Daybreak Augustine 50's-Destination Homes Remove material and change with Hardie Soffit and fasica. VPO 06. Needs Billing Complete 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Hilton Medina - 2026-05-21
1720
May 14, 2026 Bldg 60-Inverness Townhomes-DR Horton Instalar house wrap VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19
180
May 14, 2026 Bldg 24-Mt. Rainier-Edge Reset scaff that was removed for drywall, it was done twice. VPO 09. Archive 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-15
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-21
200
May 14, 2026 123-Daybreak Providence 65's-Destination Homes Roofing team installed Pebblestone flashing under the roof where the color sheet directed cobblestone. We matched the pebblestone flashing, but had to reorder soffit fascia and flashing to do so. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Dery Briseno - 2026-05-15
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Dery Briseno - 2026-05-17
4696.51
May 14, 2026 Units 359-360-Daybreak Duets-Destination Homes Brown Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21
420
May 13, 2026 295-Viridian-DR Horton How's rap above garage is not long enough Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-05-14
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-05-20
90
May 12, 2026 605-Harmony Ridge-Edge Stucco repair Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Ludvin Noriega - 2026-05-13
602. ⭕ Misc. Work: Unassigned (Pass (Aprobado)) - 2026-05-16
80
May 12, 2026 203-Stratton Acres-Meritage Homes Fix trim box Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-13
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-13
50
May 08, 2026 Bldg 25-The Peaks-Pulte Homes Install Soffit and repair siding after framing rework. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Virgilio Cabrera - 2026-05-10
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Patricio Villanueva - 2026-05-11
480
May 08, 2026 8 (Vincent Residence)-Woodheaven Estates-Split Rock Landscape walls installed with stone VPO 04. In Progress 5 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18
651. ⏳ VPO Work: In Progress (Started 2026-06-18) - Fernando Plancarte -
10830
May 06, 2026 Bldg 218-Mountain Ridge-Edge Instalar panel Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Segundo Heriberto Torres - 2026-05-06
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-06
140
May 05, 2026 217 (FP)-Viridian-DR Horton grout fill Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-05-05
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Francisco Dominguez Hernandez - 2026-05-07
260
May 05, 2026 Bldg 28-Viridian Townhomes-DR Horton facia change unit 1204 bldg 28 Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Brian Guzman - 2026-05-05
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Brayan Figueroa - 2026-05-09
260
May 04, 2026 2709-Mountain Ridge-Edge Replace downsput damaged by other trades. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-05-04
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-05-06
100
May 4, 2026 123-Daybreak Providence 65's-Destination Homes Remove and reset scaff to move the drywall inside of the house. VPO 09. Archive 2 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-04
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-08
220
May 4, 2026 Bldg 8-Inverness Townhomes-DR Horton Cambiar pieza rota Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-04
602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Carlos Rodondo - 2026-05-07
140
May 4, 2026 Bldg 9-Midtown Village-DR Horton Remove scaff from north and west side VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Everardo Molina Diaz - 2026-05-04
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Luis Carlos Jordan Ibarra - 2026-06-03
150
May 4, 2026 149-Montreux-DR Horton Remove, reinstall and paint siding on the posts and corbels on the front porch so the framing could be adjusted. VPO 09. Archive 2 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-13
651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-13
970
May 1, 2026 206-Bristol Farms-Regal Homes Paint Misc. Work 09. Archive 2 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Virgilio Aguilar Sanchez - 2026-05-20
653. ✅ Warranty Work: Complete (Pass (Aprobado)) - Ramon Carrasco - 2026-06-17
160