Last 3 months · Pulled June 24, 2026 · Click any name ↗ to open directly in TrackVia
| Created | Job | Name / Link | Type | Status | # Tasks | Tasks Assigned | Charge $ |
|---|---|---|---|---|---|---|---|
| June 24, 2026 | 2017-Wildflower-Toll Brothers | Fix scratch ↗ | Misc. Work | 04. In Progress | 2 | 602. ⏳ Misc. Work: Pending (Assigned 2026-06-24) - Jose Quinonez - 602. ⏳ Misc. Work: Pending (Assigned 2026-06-25) - Jose Quinonez - |
90 |
| June 23, 2026 | Jared Bingham Remodel-Custom Jobs (Pleasant Grove)-Owner Builder | Swap siding on stair ↗ | VPO | 04. In Progress | 2 | 651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Guillermo Mondragon - 651. ⭕ VPO Work: Unassigned - |
180 |
| June 22, 2026 | 111-Capitol Reef-Edge | Reparar andamio ↗ | VPO | 04. In Progress | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-22 651. ⏳ VPO Work: Pending (Assigned 2026-06-24) - Alan Gonzalez - |
150 |
| June 22, 2026 | 127-Capitol Reef-Edge | Reparar andamio ↗ | VPO | 04. In Progress | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-22 651. ⏳ VPO Work: Pending (Assigned 2026-06-24) - Alan Gonzalez - |
150 |
| June 22, 2026 | 116-Canyon Park-Tri Pointe Homes | Reset scaffold ↗ | VPO | 04. In Progress | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Hector Moreta - 2026-06-23 651. ⏳ VPO Work: Pending (Assigned 2026-06-22) - Ernesto Ramirez - |
270 |
| June 19, 2026 | Bldg 4-Inverness Townhomes-DR Horton | Remover soffit y siding ↗ | VPO | 05. Needs Field Work Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-20 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-22 |
240 |
| June 19, 2026 | Bldg 29-Mt. Rainier-Edge | Reparar andamio ↗ | VPO | 04. In Progress | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19 651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Alan Gonzalez - |
180 |
| June 19, 2026 | 108-Capitol Reef-Edge | Reparar andamio ↗ | VPO | 04. In Progress | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19 651. ⏳ VPO Work: Pending (Assigned 2026-06-23) - Alan Gonzalez - |
150 |
| June 18, 2026 | 903-Harmony Ridge-Edge | Add lath and brown ↗ | Misc. Work | 04. In Progress | 2 | 602. ⏳ Misc. Work: In Progress (Started 2026-06-22) - Oscar Ibarra - 602. ⏳ Misc. Work: Pending (Assigned 2026-06-19) - Jose Ceferino Benitez Urquilla - |
50 |
| June 18, 2026 | 905-Harmony Ridge-Edge | Trip charge ↗ | VPO | 04. In Progress | 2 | 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Jaime Genchi Vargas - 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Jaime Genchi Vargas - |
180 |
| June 18, 2026 | 905-Harmony Ridge-Edge | Trip charge ↗ | VPO | 04. In Progress | 2 | 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Joaquin Feresin - 651. ⏳ VPO Work: Pending (Assigned 2026-06-18) - Joaquin Feresin - |
180 |
| June 17, 2026 | 79-Elk Ridge-Toll Brothers | Repairs ↗ | Misc. Work | 04. In Progress | 2 | 602. ✅ Misc. Work: Complete - Euddy Enrique Rodriguez-Chima - 2026-06-23 602. ⭕ Misc. Work: Unassigned - |
100 |
| June 17, 2026 | 116-Canyon Park-Tri Pointe Homes | Plan error ↗ | Misc. Work | 04. In Progress | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Innacio Portio - 2026-06-19 602. ⏳ Misc. Work: Pending (Assigned 2026-06-23) - Jose Evangelista - |
0 |
| June 16, 2026 | 29-Lakeview Fields-Keystone Construction | Stucco touch ups ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Melissa Camacho - 2026-06-17 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Melissa Camacho - 2026-06-17 |
480 |
| June 16, 2026 | 4 (Larson Residence)-Springside Meadows-Owner Builder | gutter repair ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-06-18 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-06-18 |
270 |
| June 16, 2026 | 207-Stratton Acres-Meritage Homes | add lap siding under deck ledger ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Alex Salinas - 2026-06-16 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-17 |
170 |
| June 16, 2026 | 208-Stratton Acres-Meritage Homes | lap siding under deck ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Alex Salinas - 2026-06-16 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-17 |
260 |
| June 15, 2026 | Bldg 213-Mountain Ridge-Edge | Remover soffit ↗ | Misc. Work | 04. In Progress | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Francisco Dominguez Hernandez - 2026-06-15 602. ⭕ Misc. Work: Unassigned - |
180 |
| June 15, 2026 | 3-Red Slate Estates-Richmond | Stucco Repair ↗ | VPO | 04. In Progress | 2 | 651. ⏳ VPO Work: Pending (Assigned 2026-06-16) - Francisco Juarez - 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Diego Martin - 2026-06-23 |
840 |
| June 15, 2026 | Units 12-15-Holladay Hills Townhomes-Tri Pointe Homes | Scaffolding ↗ | VPO | 05. Needs Field Work Complete | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-18 |
210 |
| June 15, 2026 | 121-Capitol Reef-Edge | Reparar andamio ↗ | VPO | 05. Needs Field Work Complete | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-15 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-06-19 |
150 |
| June 12, 2026 | 255-Viridian-DR Horton | basement door sideing ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Innacio Portio - 2026-06-12 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-15 |
230 |
| June 10, 2026 | Bldg 65-Harmony Ridge-Edge | Small repairs ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-10 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-10 |
140 |
| June 09, 2026 | 302-Legacy Park-Ivory | Re-do siding ↗ | VPO | 05. Needs Field Work Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Francisco Saavedra - 2026-06-10 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jaime Villa Rangel - 2026-06-14 |
1630 |
| June 09, 2026 | Bldg 29-Mt. Rainier-Edge | Complete housewrap after window installation ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-06-09 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-06-09 |
300 |
| June 09, 2026 | Units 457-458-Daybreak Duets-Destination Homes | Chimney cap ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10 |
300 |
| June 09, 2026 | Units 251-252-Paired Villas-Sego Homes | Chimney cap ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-10 |
360 |
| June 08, 2026 | 222-Bristol Farms-Regal Homes | Paper and wire ↗ | VPO | 04. In Progress | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-09 651. ⏳ VPO Work: Pending (Assigned 2026-06-10) - Jose Ceferino Benitez Urquilla - |
180 |
| June 08, 2026 | Bldg 5-Taylor Villas-Edge | Reset scaff from drywall ↗ | VPO | 05. Needs Field Work Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09 |
300 |
| June 08, 2026 | 2022-Wildflower-Toll Brothers | Install cap on column ↗ | Misc. Work | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-10 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-10 |
600 |
| June 08, 2026 | 901-Harmony Ridge-Edge | Trip charge to complete paper and wire around window installed after initial visit. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ricardo Anastacio Mejia - 2026-06-09 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-09 |
100 |
| June 08, 2026 | Bldg 30-Viridian Townhomes-DR Horton | soffit repair ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-08 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-08 |
90 |
| June 08, 2026 | 128-Montreux-DR Horton | Box around trusses with siding – add soffit to complete front porch ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Elias Prudente - 2026-06-09 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roger Guzman - 2026-06-09 |
300 |
| June 05, 2026 | Bldg K-Daybreak Downtown-Sego Homes | Paint ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-09 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-09 |
90 |
| June 04, 2026 | 5-Riley Park-DR Horton | Add gutter ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-06-14 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Anderson Benegas Guzman - 2026-06-05 |
180 |
| June 04, 2026 | 5-Riley Park-DR Horton | Fill in gaps with stucco color of RV garage ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Abel San Juan Bacilio - 2026-06-06 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Abel San Juan Bacilio - 2026-06-08 |
180 |
| June 04, 2026 | 903-Harmony Ridge-Edge | Reset scaff that was removed for drywall. ↗ | VPO | 09. Archive | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Javier Vazquez - 2026-06-04 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Javier Vazquez - 2026-06-04 |
100 |
| May 29, 2026 | Bldg 62-Harmony Ridge-Edge | Angle iron ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-05-30 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-06-01 |
270 |
| May 29, 2026 | 724-Broadview Shores-Ivory | Trip charge to return and finish housewrap, wrap around the drywall stock window and lath of front and back porche. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alfredo Chavarin Lopez - 2026-05-29 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Rodrigo Alcantar - 2026-06-01 |
280 |
| May 28, 2026 | Irva Tooele Retail Drive Through-Commercial-Affinity Construction | House wrap repairs ↗ | VPO | 04. In Progress | 2 | 651. ⏳ VPO Work: Pending (Assigned 2026-05-28) - Armando Adame - 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Armando Adame - 2026-06-04 |
230 |
| May 28, 2026 | TH 3-Flint Acres-Henry Walker Homes | Paint touch ups ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Kevin Nehemias - 2026-05-29 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Kevin Nehemias - 2026-05-29 |
500 |
| May 28, 2026 | Bldg 47-Harmony Ridge-Edge | Window repairs ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Crescencio Bernal Lopez - 2026-06-01 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-06-02 |
110 |
| May 28, 2026 | 298-Viridian-DR Horton | redo stucco ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Omar Perez Padilla - 2026-06-02 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Omar Perez Padilla - 2026-05-28 |
140 |
| May 28, 2026 | Bldg 7-Montreux Townhomes-DR Horton | Install siding around first floor window that was replaced. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Gerardo Juarez - 2026-05-28 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Elias Prudente - 2026-06-04 |
200 |
| May 27, 2026 | 4280-Long Valley-DR Horton | Reset scaff on right side of house for the Gas pipeline installation ↗ | VPO | 09. Archive | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Marcos Mata - 2026-05-28 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Marcos Mata - 2026-06-02 |
100 |
| May 27, 2026 | 5-Riley Park-DR Horton | Siding needed around garages. ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Armando Adame - 2026-05-28 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Juan Rivera - 2026-06-03 |
420 |
| May 27, 2026 | 287-Daybreak-Rainey Homes | Brown and color. ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-01 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-06-01 |
1280 |
| May 27, 2026 | Bldg 64-Harmony Ridge-Edge | Stucco brown ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27 |
180 |
| May 27, 2026 | 223-Stratton Acres-Meritage Homes | Trip charge to repair siding damaged by other trade. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-06-02 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-06-02 |
150 |
| May 27, 2026 | 1029-Northstar Ranch-Destination Homes | Reset scaff that was removed for gas pipeline. ↗ | VPO | 06. Needs Billing Complete | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-11 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Antonio Castro - 2026-06-01 |
150 |
| May 27, 2026 | 38-Tanner Flats-Ivory | Vent repair ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-28 602. ⭕ Misc. Work: Unassigned (Pass (Aprobado)) - 2026-06-16 |
240 |
| May 27, 2026 | 62-Elk Ridge-Toll Brothers | Foundation plaster ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - William Portio - 2026-05-29 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Isaac Arellano - 2026-05-31 |
230 |
| May 26, 2026 | Bldg 63-Harmony Ridge-Edge | Angle iron ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-27 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-27 |
180 |
| May 26, 2026 | Bldg 11-Inverness Townhomes-DR Horton | Reinstall Housewrap and siding after drwall in installed. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Brayan Figueroa - 2026-05-28 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Keren Avila Herrera - 2026-06-03 |
1330 |
| May 26, 2026 | 207-Weston Field-Hamlet | Install soffit on back deck after team added electrical boxes. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-06-01 705. ✅ Scaff Pickup: Complete (Pass (Aprobado)) - Juan Pablo Moreno - 2026-06-01 |
275 |
| May 26, 2026 | Bldg 1-Dixon Creek-DR Horton | Remove and reset scaff for gas meter installation. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Luis Carlos Jordan Ibarra - 2026-05-29 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Miguel Adame Alvis - 2026-06-10 |
320 |
| May 22, 2026 | Bldg 64-Harmony Ridge-Edge | Angle iron ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23 |
180 |
| May 22, 2026 | Bldg 65-Harmony Ridge-Edge | Angle iron ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Lincoln Valencia - 2026-05-23 |
180 |
| May 21, 2026 | 62-Elk Ridge-Toll Brothers | Paint the framing on the deck in black ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Angel E. Lopez-Corado - 2026-05-21 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-29 |
650 |
| May 21, 2026 | 79-Elk Ridge-Toll Brothers | Paint the framing on the back deck in black. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Angel E. Lopez-Corado - 2026-05-21 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-02 |
550 |
| May 21, 2026 | Units 141-146-Daybreak Urban Townhomes-Destination Homes | Add paper and wire in between the 2x10 under the decks. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-27 |
270 |
| May 21, 2026 | Bldg 31-Viridian Townhomes-DR Horton | photo cell covered ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Marco Antonio Valderrama - 2026-05-21 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-28 |
180 |
| May 20, 2026 | 610-Harmony Ridge-Edge | Touch ups ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-20 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-20 |
210 |
| May 20, 2026 | 495-Ridgeview Cottages-Ivory | Finish. Siding ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Efrain Diaz-Lopez - 2026-05-21 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-11 |
230 |
| May 20, 2026 | Bldg 18-Silver Oaks-Lennar | Housewrap repairs around first floor windows. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ronnie Moratalla - 2026-05-25 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Jose Ceferino Benitez Urquilla - 2026-05-28 |
150 |
| May 19, 2026 | 89-Elk Ridge-Toll Brothers | Add plastic to front door at porch , both outside and inside. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Juan Fernando Evangelista Rodriguez - 2026-05-19 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Juan Fernando Evangelista Rodriguez - 2026-05-20 |
180 |
| May 19, 2026 | Bldg 60-Inverness Townhomes-DR Horton | Instalar flashing en columna ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Fernando Abelino - 2026-05-21 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Fernando Abelino - 2026-05-21 |
50 |
| May 19, 2026 | Bldg 22-Inverness Townhomes-DR Horton | Terminar columnas ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-20 |
180 |
| May 19, 2026 | 109-Palomino-DR Horton | House wrap ↗ | VPO | 04. In Progress | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19 651. ⏳ VPO Work: Pending (Assigned 2026-05-21) - Luis Aguillar - |
180 |
| May 19, 2026 | 809-Broadview Shores-Ivory | Replace damaged downspout ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-05-19 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Hugo Linares - 2026-05-19 |
90 |
| May 18, 2026 | 208-Stratton Acres-Meritage Homes | Trip charge to wrap Columns/beams, framing was not complete initially. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ismael Martinez - 2026-06-06 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ismael Martinez - 2026-06-06 |
150 |
| May 18, 2026 | 206-Stratton Acres-Meritage Homes | Columns/beam ↗ | Misc. Work | 04. In Progress | 2 | 602. ✅ Misc. Work: Complete (Fail (Fallado)) - Roberto Lamas-Arellano - 2026-05-20 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-06-02 |
270 |
| May 18, 2026 | Units 457-458-Daybreak Duets-Destination Homes | Trip charge to complete housewrap around drywall windows — could not be completed during initial visit as windows were not yet installed. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Daniel Rodriguez - 2026-05-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Ronnie Moratalla - 2026-05-20 |
150 |
| May 14, 2026 | Bldg 24-Mt. Rainier-Edge | Reinstall lath that was removed to install windows. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-15 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-15 |
200 |
| May 14, 2026 | 369-Daybreak Augustine 50's-Destination Homes | Remove material and change with Hardie Soffit and fasica. ↗ | VPO | 06. Needs Billing Complete | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Hilton Medina - 2026-05-21 |
1720 |
| May 14, 2026 | Bldg 60-Inverness Townhomes-DR Horton | Instalar house wrap ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Sergio Aguilar - 2026-05-19 |
180 |
| May 14, 2026 | Bldg 24-Mt. Rainier-Edge | Reset scaff that was removed for drywall, it was done twice. ↗ | VPO | 09. Archive | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-15 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-21 |
200 |
| May 14, 2026 | 123-Daybreak Providence 65's-Destination Homes | Roofing team installed Pebblestone flashing under the roof where the color sheet directed cobblestone. We matched the pebblestone flashing, but had to reorder soffit fascia and flashing to do so. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Dery Briseno - 2026-05-15 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Dery Briseno - 2026-05-17 |
4696.51 |
| May 14, 2026 | Units 359-360-Daybreak Duets-Destination Homes | Brown ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Oscar Ibarra - 2026-05-21 |
420 |
| May 13, 2026 | 295-Viridian-DR Horton | How's rap above garage is not long enough ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Cristian Arechiga - 2026-05-14 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Roberto Lamas-Arellano - 2026-05-20 |
90 |
| May 12, 2026 | 605-Harmony Ridge-Edge | Stucco repair ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Ludvin Noriega - 2026-05-13 602. ⭕ Misc. Work: Unassigned (Pass (Aprobado)) - 2026-05-16 |
80 |
| May 12, 2026 | 203-Stratton Acres-Meritage Homes | Fix trim box ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-13 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-13 |
50 |
| May 08, 2026 | Bldg 25-The Peaks-Pulte Homes | Install Soffit and repair siding after framing rework. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Virgilio Cabrera - 2026-05-10 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Patricio Villanueva - 2026-05-11 |
480 |
| May 08, 2026 | 8 (Vincent Residence)-Woodheaven Estates-Split Rock | Landscape walls installed with stone ↗ | VPO | 04. In Progress | 5 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Fernando Plancarte - 2026-06-18 651. ⏳ VPO Work: In Progress (Started 2026-06-18) - Fernando Plancarte - |
10830 |
| May 06, 2026 | Bldg 218-Mountain Ridge-Edge | Instalar panel ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Segundo Heriberto Torres - 2026-05-06 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-06 |
140 |
| May 05, 2026 | 217 (FP)-Viridian-DR Horton | grout fill ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Cristian Bermudes - 2026-05-05 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Francisco Dominguez Hernandez - 2026-05-07 |
260 |
| May 05, 2026 | Bldg 28-Viridian Townhomes-DR Horton | facia change unit 1204 bldg 28 ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Brian Guzman - 2026-05-05 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Brayan Figueroa - 2026-05-09 |
260 |
| May 04, 2026 | 2709-Mountain Ridge-Edge | Replace downsput damaged by other trades. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-05-04 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Manolo Najarro-Garcia - 2026-05-06 |
100 |
| May 4, 2026 | 123-Daybreak Providence 65's-Destination Homes | Remove and reset scaff to move the drywall inside of the house. ↗ | VPO | 09. Archive | 2 | 305. ✅ Fix Scaff: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-04 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Alan Gonzalez - 2026-05-08 |
220 |
| May 4, 2026 | Bldg 8-Inverness Townhomes-DR Horton | Cambiar pieza rota ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Euddy Enrique Rodriguez-Chima - 2026-05-04 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Carlos Rodondo - 2026-05-07 |
140 |
| May 4, 2026 | Bldg 9-Midtown Village-DR Horton | Remove scaff from north and west side ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Everardo Molina Diaz - 2026-05-04 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Luis Carlos Jordan Ibarra - 2026-06-03 |
150 |
| May 4, 2026 | 149-Montreux-DR Horton | Remove, reinstall and paint siding on the posts and corbels on the front porch so the framing could be adjusted. ↗ | VPO | 09. Archive | 2 | 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-13 651. ✅ VPO Work: Complete (Pass (Aprobado)) - Willson Garcia - 2026-05-13 |
970 |
| May 1, 2026 | 206-Bristol Farms-Regal Homes | Paint ↗ | Misc. Work | 09. Archive | 2 | 602. ✅ Misc. Work: Complete (Pass (Aprobado)) - Virgilio Aguilar Sanchez - 2026-05-20 653. ✅ Warranty Work: Complete (Pass (Aprobado)) - Ramon Carrasco - 2026-06-17 |
160 |