Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 1, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 13,849 task records pulled, 240 matched the filter · assignment dates Feb 25, 2026 to Oct 26, 2026

240
Ready for assignment
117
Past assignment date
5
Divisions affected
$219,782
Unassigned task pay
188d
Oldest overdue

Ready tasks by division

024487296Orem9633 odOgden8862 odSalt Lake3311 odSt. George2011 odCommercial3

past assignment date   due today or upcoming

Pivot — division × assignment age

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Orem342632191296
Ogden·1547179·88
Salt Lake·110461233
St. George35363·20
Commercial···3··3
All divisions62586623724 240

Pivot — division × task type

Which trades the backlog is sitting in. Scroll sideways for all 26 task types.

DivisionSet ScaffStucco ColorSidingPaper/WireScratch CoatGuttersRockHousewrapInsl AtticSoffit/FasciaBrickStucco BrownPaintWateringSet Brick ScaffRemove ScaffMisc. WorkSpecial CorbelsFix ScaffPenetration SealingWindow Pre WrapShuttersVPO WorkFaux ConcreteFoundation PlasterQC WalkTotal
Orem26106731864712241112···1111·96
Ogden318143101432·2642·411·1·······88
Salt Lake87·51·12711···············33
St. George24··2·22···121·1···11····120
Commercial···3······················3
All divisions393920181615141211108765532211111111 240

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Orem — 96 tasks ready for assignment · 33 overdue · $72,473
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
813-Heron Hills-RichmondVPO WorkJul 10, 202653d overdueUnassigned$60Necesitan cambiar dos hojas de sofito, el que instaló las cámaras dejó el agujero muy grande y lo quieren exacto para que no se vea el agujero. El supervisor Mike Bash lo está auto
708-Highridge-EdgeWateringJul 29, 202634d overdueUnassigned$94✅ 2026-07-23: 4 Days - Stucco delay - framers are gonna have to fix a porch column for being twisted - Jonathan 2026-07-29 ✅ 2026-07-14: Scaff Delay - Scaff delay - it hasn’t pass
Bldg 70-Ridgehorne-EdgeWateringAug 1, 202631d overdueUnassigned$50
37-Lakeview Fields-Keystone ConstructionWateringAug 5, 202627d overdueUnassigned$92
117-Vista at Harmony Place-WoodsideWateringAug 5, 202627d overdueUnassigned$59
240-Canton Ridge-RichmondSpecial CorbelsAug 7, 202625d overdueUnassigned$50
2014-Wildflower-Toll BrothersFaux ConcreteAug 10, 202622d overdueUnassigned$1,182⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-02 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l
47-Lakeview Fields-Keystone ConstructionMisc. WorkAug 25, 20267d overdueUnassigned$60Gutter was damaged during scaffolding removal and needs to be replaced.
103-Auburn Springs-EdgePaper/WireAug 26, 20266d overdueIn Progress2026-08-13$113✅ 2026-08-24: 2 Days - Waiting for Columns to be done.it’s been sense last Tuesday - Harrison 2026-08-26
532-River Point-EdgeRockAug 26, 20266d overdueUnassigned$509
532-River Point-EdgeScratch CoatAug 26, 20266d overdueUnassigned$74
2014-Wildflower-Toll BrothersFoundation PlasterAug 27, 20265d overdueUnassigned$450⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-02 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l
236-Stratton Acres-Meritage HomesSoffit/FasciaAug 27, 20265d overdueUnassigned$598
722-Highridge-EdgePaintAug 28, 20264d overdueUnassigned$101✅ 2026-08-13: 3 Days - Lath delay - window missing - Jonathan 2026-08-18
913-Harmony Ridge-EdgeRockAug 28, 20264d overdueUnassigned$791✅ 2026-08-21: Missing window also columns - Jorge 2026-08-25
434-Viridian-DR HortonRockAug 28, 20264d overdueUnassigned$388⭕
434-Viridian-DR HortonScratch CoatAug 28, 20264d overdueUnassigned$50⭕
131-Montreux-DR HortonSoffit/FasciaAug 28, 20264d overdueUnassigned$704
434-Viridian-DR HortonStucco BrownAug 28, 20264d overdueUnassigned2026-08-17$1,404⭕
346-Mountain Vista at Sunset Flats-Pulte HomesPaper/WireAug 29, 20263d overdueUnassigned2026-08-21$1,410⭕ 2026-08-31: We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor Est End: 2026-09-08
240-Canton Ridge-RichmondRemove ScaffAug 29, 20263d overdueUnassigned$497
1028-Harmony Ridge-EdgeRockAug 29, 20263d overdueUnassigned$542
240-Canton Ridge-RichmondShuttersAug 29, 20263d overdueUnassigned$200
2218-Wildflower-EdgeSoffit/FasciaAug 29, 20263d overdueUnassigned$694
1027-Harmony Ridge-EdgeHousewrapAug 31, 20261d overdueUnassigned2026-08-24$229
Bldg 50-Harmony Ridge-EdgeInsl AtticAug 31, 20261d overdueUnassigned$128
1027-Harmony Ridge-EdgePaper/WireAug 31, 20261d overdueUnassigned2026-08-24$1,010
232-Viridian Plus-DR HortonSet ScaffAug 31, 20261d overdueUnassigned$779
422-Viridian-DR HortonSet ScaffAug 31, 20261d overdueUnassigned$771
527-River Point-EdgeSet ScaffAug 31, 20261d overdueUnassigned$710
2126-Wildflower-EdgeSoffit/FasciaAug 31, 20261d overdueUnassigned$541
Units 136-140-Regency at Harmony Place-WoodsideStucco ColorAug 31, 20261d overdueUnassigned$2,545
Units 970-974-Anderson Farms Townhomes-IvoryStucco ColorAug 31, 20261d overdueUnassigned$1,760
231-Viridian Plus-DR HortonBrickSep 1, 2026todayUnassigned$651
Park Restroom 1-Viridian Townhomes-DR HortonGuttersSep 1, 2026todayUnassigned$108
16119-Harmony-Meritage HomesHousewrapSep 1, 2026todayUnassigned2026-09-03$489
Bldg 21-Silver Oaks-LennarHousewrapSep 1, 2026todayUnassigned2026-09-02$1,733
109-Vista at Harmony Place-WoodsideHousewrapSep 1, 2026todayUnassigned2026-08-28$680
Bldg 39-Highridge-EdgeHousewrapSep 1, 2026todayUnassigned2026-08-28$636
41-Lakeview Fields-Keystone ConstructionHousewrapSep 1, 2026todayUnassigned2026-08-28$124
Units 970-974-Anderson Farms Townhomes-IvoryPaintSep 1, 2026todayUnassigned$778
Bldg 21-Silver Oaks-LennarPaper/WireSep 1, 2026todayUnassigned2026-09-02$718
Bldg 39-Highridge-EdgePaper/WireSep 1, 2026todayUnassigned2026-08-28$1,343
105 (FP)-Auburn Springs-EdgePaper/WireSep 1, 2026todayUnassigned2026-09-01$50
41-Lakeview Fields-Keystone ConstructionPaper/WireSep 1, 2026todayUnassigned2026-08-28$1,023
105 (FP)-Auburn Springs-EdgeRockSep 1, 2026todayUnassigned$130
103-Auburn Springs-EdgeRockSep 1, 2026todayUnassigned$970✅ 2026-08-24: 2 Days - Waiting for Columns to be done.it’s been sense last Tuesday - Harrison 2026-08-26
49-Tanner Flats-IvoryRockSep 1, 2026todayUnassigned$966
1029-Harmony Ridge-EdgeRockSep 1, 2026todayUnassigned$129
103-Auburn Springs-EdgeScratch CoatSep 1, 2026todayUnassigned$140✅ 2026-08-24: 2 Days - Waiting for Columns to be done.it’s been sense last Tuesday - Harrison 2026-08-26
Bldg 21-Silver Oaks-LennarSet Brick ScaffSep 1, 2026todayUnassigned$0
1018-Harmony Ridge-EdgeSet ScaffSep 1, 2026todayUnassigned2026-09-02$684
135-Auburn Springs-EdgeSet ScaffSep 1, 2026todayUnassigned2026-09-02$895
143-Montreux-DR HortonSidingSep 1, 2026todayUnassigned2026-08-27$4,764⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - Alex Est End: 2026-09-08
110-Vista at Harmony Place-WoodsideSidingSep 1, 2026todayUnassigned2026-08-24$1,290
130-Montreux-DR HortonSidingSep 1, 2026todayUnassigned2026-08-27$4,655⭕ 2026-08-28: Material Delay - Missing all the siding - Alex Est End: 2026-09-02
49-Tanner Flats-IvorySidingSep 1, 2026todayUnassigned2026-08-25$803
341-Viridian-DR HortonSidingSep 1, 2026todayUnassigned2026-08-24$1,070
45-Tanner Flats-IvorySidingSep 1, 2026todayUnassigned2026-08-24$1,329
143-Montreux-DR HortonSoffit/FasciaSep 1, 2026todayUnassigned$748⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - Alex Est End: 2026-09-08
423-Viridian-DR HortonSoffit/FasciaSep 1, 2026todayUnassigned$609
130-Montreux-DR HortonSoffit/FasciaSep 1, 2026todayUnassigned$608⭕ 2026-08-28: Material Delay - Missing all the siding - Alex Est End: 2026-09-02
102-Canton Ridge-RichmondSpecial CorbelsSep 1, 2026todayUnassigned$50
341-Viridian-DR HortonStucco BrownSep 1, 2026todayUnassigned2026-08-19$1,108
235-Canton Ridge-RichmondStucco ColorSep 1, 2026todayUnassigned2026-08-31$1,167✅ 2026-08-06: 6 Days - I talk the super about the sliding back door and the front post not be framed in the front porch I ask if he want to start the job and pay the vpo to come ba
247-Viridian Plus-DR HortonSet ScaffSep 2, 2026in 1dUnassigned$817
313-Viridian-DR HortonSet ScaffSep 2, 2026in 1dUnassigned$639
142-Auburn Springs-EdgeSet ScaffSep 2, 2026in 1dUnassigned2026-09-02$973
902-Harmony Ridge-EdgeStucco ColorSep 2, 2026in 1dUnassigned$1,452✅ 2026-08-05: 2 Days - Hold on exteriors besides scaff - Jorge 2026-08-07
333-Mountain Vista at Sunset Flats-Pulte HomesStucco ColorSep 2, 2026in 1dUnassigned$1,035✅ 2026-08-03: 9 Days - We can’t not lath to when we pass Housewrap inspections please don’t send any lath crews thanks - Victor 2026-08-14
2168-Wildflower-EdgeSet ScaffSep 3, 2026in 2dUnassigned$559
712-Highridge-EdgeSet ScaffSep 3, 2026in 2dUnassigned$740
Bldg 49-Viridian Townhomes-DR HortonSet ScaffSep 3, 2026in 2dUnassigned$1,312
107-Auburn Springs-EdgeSet ScaffSep 3, 2026in 2dUnassigned$840
423-Viridian-DR HortonStucco ColorSep 3, 2026in 2dUnassigned$981
233-Viridian Plus-DR HortonSet ScaffSep 4, 2026in 3dUnassigned$978
421-Viridian-DR HortonSet ScaffSep 4, 2026in 3dUnassigned$644
517-River Point-EdgeSet ScaffSep 4, 2026in 3dUnassigned$618
1028-Harmony Ridge-EdgeStucco ColorSep 5, 2026in 4dUnassigned$1,021
1029-Harmony Ridge-EdgeStucco ColorSep 5, 2026in 4dUnassigned$793
913-Harmony Ridge-EdgeStucco ColorSep 6, 2026in 5dUnassigned$1,336✅ 2026-08-21: Missing window also columns - Jorge 2026-08-25
36-Lakeview Fields-Keystone ConstructionStucco ColorSep 6, 2026in 5dUnassigned$1,256
Wellspring Park Restroom-Viridian Townhomes-DR HortonSet ScaffSep 7, 2026in 6dUnassigned$15
Bldg 70-Ridgehorne-EdgeInsl AtticSep 8, 2026in 7dUnassigned$65
234-Viridian Plus-DR HortonSet ScaffSep 9, 2026in 8dUnassigned$763
Bldg 72-Ridgehorne-EdgeInsl AtticSep 10, 2026in 9dUnassigned$96
2181-Wildflower-EdgeSet ScaffSep 10, 2026in 9dUnassigned$652
340-Viridian-DR HortonSet ScaffSep 10, 2026in 9dUnassigned$606
314-Viridian-DR HortonSet ScaffSep 11, 2026in 10dUnassigned$627
2227-Wildflower-EdgeSet ScaffSep 14, 2026in 13dUnassigned$744
711-Ridgehorne-EdgeSet ScaffSep 14, 2026in 13dUnassigned$740
1021-Harmony Ridge-EdgeSet ScaffSep 14, 2026in 13dUnassigned2026-09-14$777
718-Highridge-EdgeSet ScaffSep 14, 2026in 13dUnassigned$831
420-Viridian-DR HortonSet ScaffSep 15, 2026in 14dUnassigned$681
1031-Harmony Ridge-EdgeSet ScaffSep 17, 2026in 16dUnassigned$709
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 38dUnassigned$80
Ogden — 88 tasks ready for assignment · 62 overdue · $65,236
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
17-Sunset Ridges-Sierra HomesSidingAug 6, 202626d overdueUnassigned2026-07-30$261✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
17-Sunset Ridges-Sierra HomesSoffit/FasciaAug 11, 202621d overdueUnassigned$650✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
108-Red Hill-IvorySet Brick ScaffAug 12, 202620d overdueUnassigned$40
206-Fremont Meadows-Sterling HomesScratch CoatAug 13, 202619d overdueUnassigned$50
108-Palomino-DR HortonScratch CoatAug 15, 202617d overdueUnassigned$95✅ 2026-08-10: 8 Days - Due to drip edge not being installed correctly. - Erik 2026-08-20
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202615d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP
63-Brookfield-LennarPaintAug 18, 202614d overdueUnassigned$151
11-Heritage Parkway-Sierra HomesSidingAug 18, 202614d overdueUnassigned$1,260✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
7-Heritage Parkway-Sierra HomesSidingAug 18, 202614d overdueUnassigned$158✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-04
Units 35-40-Hess Farms-David Weekley HomesFix ScaffAug 20, 202612d overdueUnassigned$120⭕ 2026-08-24: Waiting for wrap inspection to get lath and wire started - Alexander Est End: 2026-08-31 | We need to take scaff down on parts of roofs that shingles weren’t install
55-Cardamine-Sierra HomesScratch CoatAug 21, 202611d overdueUnassigned$111⭕ 2026-08-12: Material Delay - We don’t have vinyl materials - Jose Est End: 2026-08-31
601-Vineyard-VisionaryScratch CoatAug 21, 202611d overdueUnassigned$86
71-Brookfield-LennarGuttersAug 24, 20268d overdueUnassigned$167
63-Brookfield-LennarGuttersAug 24, 20268d overdueUnassigned$236
106-Red Hill-IvorySet Brick ScaffAug 24, 20268d overdueUnassigned$36
108-Red Hill-IvoryBrickAug 25, 20267d overdueUnassigned$1,322
Bldg 25-Railrunner-DAI ConstructionGuttersAug 25, 20267d overdueUnassigned$806
56-Cardamine-Sierra HomesPaper/WireAug 25, 20267d overdueUnassigned2026-08-10$57
108-Red Hill-IvoryScratch CoatAug 25, 20267d overdueUnassigned$50
Bldg K-Sugar Creek Townhomes-VisionaryRemove ScaffAug 26, 20266d overdueUnassigned$408
105-Legends Crossing-VisionaryScratch CoatAug 26, 20266d overdueUnassigned$50✅ 2026-08-12: Material Delay - We still waiting for the vinyl materials - Jose 2026-08-28
Bldg 6-Midtown Village-DR HortonSet Brick ScaffAug 26, 20266d overdueUnassigned$0
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 20266d overdueUnassigned$134
102-Legends Crossing-VisionaryPaper/WireAug 27, 20265d overdueUnassigned2026-08-26$50
176-Mountain Gate-Sierra HomesSidingAug 27, 20265d overdueUnassigned2026-08-27$220
116-Meadows at Hyde Park-VisionarySidingAug 27, 20265d overdueUnassigned2026-08-21$1,704
521-Vineyard-VisionarySidingAug 27, 20265d overdueUnassigned2026-08-27$714
106-Red Hill-IvoryBrickAug 28, 20264d overdueUnassigned$1,042
TH 4-Flint Acres-Henry Walker HomesGuttersAug 28, 20264d overdueUnassigned$1,132
62-Brookfield-LennarHousewrapAug 28, 20264d overdueUnassigned2026-08-29$632
3-Brynlee Acres-HamletScratch CoatAug 28, 20264d overdueUnassigned$254
Bldg 2-Railrunner-DAI ConstructionSidingAug 28, 20264d overdueUnassigned2026-08-14$782✅ 2026-07-09: 21 Days - The superintendent said he was ready but I check the building and it’s not ready 100% still has a lot the superintendent apologized for this - George 2026-0
3-Brynlee Acres-HamletSidingAug 28, 20264d overdueUnassigned2026-08-19$961
821-Ridgeline Park-VisionarySidingAug 28, 20264d overdueUnassigned2026-08-13$941
313-Stagecoach Estates-McArthurSoffit/FasciaAug 28, 20264d overdueUnassigned$654
12-Mountainside Estates-DR HortonBrickAug 29, 20263d overdueUnassigned$1,128
11-Mountainside Estates-DR HortonBrickAug 29, 20263d overdueUnassigned2026-08-10$781
106-Three Farms Jenkins Fields-IvoryGuttersAug 29, 20263d overdueUnassigned$146
Bldg K-Sugar Creek Townhomes-VisionaryGuttersAug 29, 20263d overdueUnassigned$874
Units 41-46-Hess Farms-David Weekley HomesRockAug 29, 20263d overdueUnassigned$8,516✅ 2026-08-04: Scaff Delay - Building is not ready for Scafold. - Erik 2026-08-07
Units 41-46-Hess Farms-David Weekley HomesScratch CoatAug 29, 20263d overdueUnassigned$900✅ 2026-08-04: Scaff Delay - Building is not ready for Scafold. - Erik 2026-08-07
12-Mountainside Estates-DR HortonSidingAug 29, 20263d overdueUnassigned2026-08-24$1,408
11-Mountainside Estates-DR HortonSidingAug 29, 20263d overdueUnassigned2026-08-24$1,564
114-Meadows at Hyde Park-VisionaryStucco ColorAug 29, 20263d overdueUnassigned2026-08-26$838
1707-Cranefield Estates-IvoryStucco ColorAug 30, 20262d overdueUnassigned2026-09-02$1,168
54-Cardamine-Sierra HomesStucco ColorAug 30, 20262d overdueUnassigned2026-09-01$295✅ 2026-07-29: 12 Days - We don’t have vinyl materials - Jose 2026-08-15
701-Ridgeline Park-VisionaryStucco ColorAug 30, 20262d overdueUnassigned2026-09-02$806
601-Vineyard-VisionaryStucco ColorAug 30, 20262d overdueUnassigned2026-09-03$925
55-Cardamine-Sierra HomesBrickAug 31, 20261d overdueUnassigned2026-08-05$1,066⭕ 2026-08-12: Material Delay - We don’t have vinyl materials - Jose Est End: 2026-08-31
6-Heritage Parkway-Sierra HomesPaintAug 31, 20261d overdueUnassigned$68
Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction GroupRockAug 31, 20261d overdueUnassigned$635⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-15
102-Meadows at Hyde Park-VisionarySet ScaffAug 31, 20261d overdueUnassigned2026-08-31$561
723-Ridgeline Park-VisionarySet ScaffAug 31, 20261d overdueUnassigned2026-08-31$334
102-Meadows at Hyde Park-VisionarySidingAug 31, 20261d overdueUnassigned$1,261
723-Ridgeline Park-VisionarySidingAug 31, 20261d overdueUnassigned2026-08-19$1,603
314-Stagecoach Estates-McArthurStucco ColorAug 31, 20261d overdueUnassigned$809
323-Stagecoach Estates-McArthurStucco ColorAug 31, 20261d overdueUnassigned$791
55-Cardamine-Sierra HomesStucco ColorAug 31, 20261d overdueUnassigned$331⭕ 2026-08-12: Material Delay - We don’t have vinyl materials - Jose Est End: 2026-08-31
501-Legacy Park-IvoryStucco ColorAug 31, 20261d overdueUnassigned$1,004
1708-Cranefield Estates-IvoryStucco ColorAug 31, 20261d overdueUnassigned2026-09-02$928
227-Bristol Farms-Regal HomesStucco ColorAug 31, 20261d overdueUnassigned$1,246
229-Bristol Farms-Regal HomesStucco ColorAug 31, 20261d overdueUnassigned$1,210
125-Palomino-DR HortonBrickSep 1, 2026todayUnassigned$905
229-Westwood Estates-Meritage HomesGuttersSep 1, 2026todayUnassigned$280
108-Palomino-DR HortonGuttersSep 1, 2026todayUnassigned$321✅ 2026-08-10: 8 Days - Due to drip edge not being installed correctly. - Erik 2026-08-20
206-Fremont Meadows-Sterling HomesGuttersSep 1, 2026todayUnassigned$318
Bldg 11-Midtown Village-DR HortonGuttersSep 1, 2026todayUnassigned$970
108-Meadows at Hyde Park-VisionaryGuttersSep 1, 2026todayUnassigned$461
113-Meadows at Hyde Park-VisionaryGuttersSep 1, 2026todayUnassigned$352✅ 2026-07-23: 11 Days - They missing the front porch cap - Jose 2026-08-07 ✅ 2026-07-22: Material Delay - We still don’t have material - Jose 2026-08-07
330-Riverside Estates-Fieldstone HomesGuttersSep 1, 2026todayUnassigned$321
103-Legends Crossing-VisionaryPaper/WireSep 1, 2026todayUnassigned2026-09-03$50
125-Palomino-DR HortonScratch CoatSep 1, 2026todayUnassigned$95
108-Stagecoach Estates-McArthurSet ScaffSep 1, 2026todayUnassigned2026-09-01$578
1709-Cranefield Estates-IvorySidingSep 1, 2026todayUnassigned2026-08-28$780
126-Palomino-DR HortonStucco BrownSep 1, 2026todayUnassigned2026-08-25$1,818
125-Palomino-DR HortonStucco BrownSep 1, 2026todayUnassigned2026-08-18$1,235
1709-Cranefield Estates-IvoryStucco BrownSep 1, 2026todayUnassigned2026-08-26$914
313-Stagecoach Estates-McArthurStucco ColorSep 1, 2026todayUnassigned$951
112-Three Farms Jenkins Fields-IvoryStucco ColorSep 1, 2026todayUnassigned$873
4-Heritage Parkway-Sierra HomesGuttersSep 2, 2026in 1dUnassigned$302✅ 2026-07-29: 4 Days - We still don’t have vinyl material - Jose 2026-08-04
108-Stagecoach Estates-McArthurHousewrapSep 2, 2026in 1dUnassigned2026-08-26$617
2-Brynlee Acres-HamletRockSep 2, 2026in 1dUnassigned$1,609
2-Brynlee Acres-HamletScratch CoatSep 2, 2026in 1dUnassigned$166
2-Brynlee Acres-HamletStucco BrownSep 2, 2026in 1dUnassigned2026-08-17$802
3-Brynlee Acres-HamletStucco ColorSep 2, 2026in 1dUnassigned$901
Bldg 12-Midtown Village-DR HortonStucco ColorSep 2, 2026in 1dUnassigned$1,751
17-Sunset Ridges-Sierra HomesStucco ColorSep 2, 2026in 1dUnassigned$301✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
12-Mountainside Estates-DR HortonStucco ColorSep 5, 2026in 4dUnassigned$1,034
Salt Lake — 33 tasks ready for assignment · 11 overdue · $27,551
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
10-Riley Park-DR HortonScratch CoatAug 22, 202610d overdueUnassigned$80✅ 2026-08-11: 3 Days - Waiting on scaffold no scaffold on site - Alexander 2026-08-14
Units 541-543-Daybreak Lexington Townhomes-Destination HomesPaper/WireAug 27, 20265d overdueUnassigned2026-08-28$1,150
11-Riley Park-DR HortonBrickAug 28, 20264d overdueUnassigned$754✅ 2026-08-19: 2 Days - Waiting on initial order - Alexander 2026-08-21
2919-Mountain Ridge-EdgeHousewrapAug 28, 20264d overdueUnassigned2026-08-28$788⭕ 2026-08-26: Don’t start paper and wire or housewrap until client CM gives us the go - Arturo Est End: 2026-08-31
2919-Mountain Ridge-EdgePaper/WireAug 28, 20264d overdueUnassigned2026-08-28$60⭕ 2026-08-26: Don’t start paper and wire or housewrap until client CM gives us the go - Arturo Est End: 2026-08-31
153-Pierson Farms-McArthurPaper/WireAug 29, 20263d overdueUnassigned2026-08-31$1,187
Bldg 20-Solari-EdgeRockAug 29, 20263d overdueUnassigned$1,183✅ 2026-08-19: 4 Days - Delayed for drywall windows and gas line - Dustin 2026-08-25
1005-Northstar Ranch-Destination HomesSoffit/FasciaAug 29, 20263d overdueUnassigned$587✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18
Bldg 1-Solari-EdgeStucco ColorAug 29, 20263d overdueUnassigned2026-08-31$1,870✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
10-Riley Park-DR HortonStucco ColorAug 30, 20262d overdueUnassigned2026-08-31$1,515✅ 2026-08-11: 3 Days - Waiting on scaffold no scaffold on site - Alexander 2026-08-14
103-Creek Ridge Cove-RichmondPaper/WireAug 31, 20261d overdueUnassigned2026-09-01$1,340
104-Creek Ridge Cove-RichmondHousewrapSep 1, 2026todayUnassigned2026-09-01$629
104-Creek Ridge Cove-RichmondPaper/WireSep 1, 2026todayUnassigned2026-09-01$855
1005-Northstar Ranch-Destination HomesStucco ColorSep 1, 2026todayUnassigned2026-08-31$867✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18
Units 440-445-Legacy at Sky Ranch-WoodsideStucco ColorSep 1, 2026todayUnassigned$1,754
2909-Mountain Ridge-EdgeSet ScaffSep 2, 2026in 1dUnassigned2026-09-02$494
122-Capitol Reef-EdgeSet ScaffSep 2, 2026in 1dUnassigned2026-09-02$638
11-Riley Park-DR HortonStucco ColorSep 2, 2026in 1dUnassigned$1,100✅ 2026-08-19: 2 Days - Waiting on initial order - Alexander 2026-08-21
442-Daybreak Cottage Courts-Destination HomesStucco ColorSep 5, 2026in 4dUnassigned2026-09-03$674
Bldg 20-Solari-EdgeStucco ColorSep 5, 2026in 4dUnassigned$2,876✅ 2026-08-19: 4 Days - Delayed for drywall windows and gas line - Dustin 2026-08-25
2912-Mountain Ridge-EdgeSet ScaffSep 8, 2026in 7dUnassigned2026-09-04$759
Bldg 21-Solari-EdgeSet ScaffSep 9, 2026in 8dUnassigned$1,778
120-Capitol Reef-EdgeSet ScaffSep 9, 2026in 8dUnassigned$671
Bldg 22-Solari-EdgeSet ScaffSep 10, 2026in 9dUnassigned$1,543
Bldg 211-Mountain Ridge-EdgeInsl AtticSep 14, 2026in 13dUnassigned$144
2929-Mountain Ridge-EdgeSet ScaffSep 15, 2026in 14dUnassigned$577
2916-Mountain Ridge-EdgeSet ScaffSep 17, 2026in 16dUnassigned$752
Bldg 22-Mt. Rainier-EdgeInsl AtticSep 23, 2026in 22dUnassigned$159✅ 2026-08-12: 3 Days - Don’t start stucco brown until drywall windows are installed correctly - Arturo 2026-08-17
Bldg 9-Taylor Villas-EdgeInsl AtticSep 29, 2026in 28dUnassigned$179✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
Bldg 1-Solari-EdgeInsl AtticOct 1, 2026in 30dUnassigned$143✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 43dUnassigned$144
Bldg 202-Mountain Ridge-EdgeInsl AtticOct 20, 2026in 49dUnassigned$143
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 55dUnassigned$160
St. George — 20 tasks ready for assignment · 11 overdue · $54,372
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
10-Black Desert North Village-VGIQC WalkFeb 25, 2026188d overdueUnassigned$0✅ 2025-12-08: 11 Days - Tendremos que posponer el papel y el alambre, porque el Super me habló que si lo podemos empezar hasta el siguiente lunes - Francisco 2025-12-23
Bldg C-Residence at Millcreek-RimrockRockJul 16, 202647d overdueUnassigned$15,704
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202647d overdueUnassigned$1,811
Bldg D-Residence at Millcreek-RimrockRemove ScaffAug 6, 202626d overdueUnassigned$2,133
Bldg Y-Sage Haven Townhomes-VisionaryStucco ColorAug 9, 202623d overdueUnassigned$3,502
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202617d overdueUnassigned$0
Bldg Y-Sage Haven Townhomes-VisionaryPaintAug 21, 202611d overdueUnassigned$1,551
Bldg C-Residence at Millcreek-RimrockPaintAug 24, 20268d overdueUnassigned$1,838
33-Black Desert North Village-H2 HomesRockAug 25, 20267d overdueUnassigned$13,606
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 20265d overdueUnassigned2026-08-27$57
75-Divario-VisionaryWindow Pre WrapAug 31, 20261d overdueUnassigned$100
52-Zion Shores-Split RockHousewrapSep 1, 2026todayUnassigned2026-09-02$50
4271-Long Valley-DR HortonHousewrapSep 1, 2026todayUnassigned2026-09-01$50
4272-Long Valley-DR HortonScratch CoatSep 1, 2026todayUnassigned$87
Garage 4-Residence at Millcreek-RimrockSet ScaffSep 1, 2026todayUnassigned2026-08-31$644
413-The Preserve at Alaia-VisionaryStucco BrownSep 1, 2026todayUnassigned2026-08-12$1,791
Bldg 133-Long Valley Townhomes-DR HortonWateringSep 1, 2026todayUnassigned$189
Bldg C-Residence at Millcreek-RimrockStucco ColorSep 2, 2026in 1dUnassigned$6,354
4164-Long Valley Rambler-DR HortonStucco ColorSep 5, 2026in 4dUnassigned$865
Bldg 133-Long Valley Townhomes-DR HortonStucco ColorSep 5, 2026in 4dUnassigned2026-08-28$4,040
Commercial — 3 tasks ready for assignment · 0 overdue · $150
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
206-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 2026todayUnassigned2026-09-03$50
205-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 2026todayUnassigned2026-09-03$50
203-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 2026todayUnassigned2026-09-03$50

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):