Every division. Tasks with an assignment date set but no team assigned and not yet completed.
Generated Sep 4, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 14,043 task records pulled, 262 matched the filter · assignment dates Feb 25, 2026 to Nov 3, 2026
past assignment date due today or upcoming
| Division | Overdue 30+ days | Overdue 8-30 days | Overdue 1-7 days | Due today | Next 7 days | Beyond 7 days | Total |
|---|---|---|---|---|---|---|---|
| Orem | 5 | 3 | 27 | 25 | 21 | 25 | 106 |
| Ogden | · | 13 | 53 | 16 | 6 | · | 88 |
| Salt Lake | · | · | 5 | 10 | 7 | 18 | 40 |
| St. George | 1 | 1 | 6 | 1 | 8 | · | 17 |
| Commercial | 1 | 4 | 5 | · | · | · | 10 |
| Corporate | · | 1 | · | · | · | · | 1 |
| All divisions | 7 | 22 | 96 | 52 | 42 | 43 | 262 |
Which trades the backlog is sitting in. Scroll sideways for all 29 task types.
| Division | Stucco Color | Set Scaff | Rock | Scratch Coat | Siding | Gutters | Paper/Wire | Insl Attic | Remove Scaff | Paint | Stucco Brown | Housewrap | Watering | Soffit/Fascia | Brown & Mesh | Set Brick Scaff | Window Pre Wrap | Insl Walls | Insl Foam 1 | Brick | Misc. Work | Faux Concrete | EIFS Weather Barrier | Fix Scaff | Special Corbels | Penetration Sealing | VPO Work | Foundation Plaster | QC Walk | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | 16 | 33 | 12 | 6 | 2 | 1 | 3 | 2 | 7 | 2 | 4 | 2 | 4 | 3 | · | · | · | 1 | 1 | · | 1 | 2 | · | 1 | 1 | · | 1 | 1 | · | 106 |
| Ogden | 16 | 1 | 9 | 10 | 14 | 11 | 4 | · | 3 | 5 | 1 | 2 | · | · | 4 | 4 | 1 | · | · | 3 | · | · | · | · | · | · | · | · | · | 88 |
| Salt Lake | 5 | 9 | 4 | 3 | · | 1 | 1 | 9 | · | · | 1 | 2 | · | 1 | · | · | · | 2 | 2 | · | · | · | · | · | · | · | · | · | · | 40 |
| St. George | 8 | · | 1 | 1 | · | · | · | · | · | 2 | 1 | · | 1 | · | · | · | 2 | · | · | · | · | · | · | · | · | · | · | · | 1 | 17 |
| Commercial | 1 | 1 | · | 1 | · | · | 3 | · | 1 | 1 | · | · | · | · | · | · | · | · | · | · | · | · | 1 | · | · | 1 | · | · | · | 10 |
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | 1 | · | · | · | · | · | · | · | · | 1 |
| All divisions | 46 | 44 | 26 | 21 | 16 | 13 | 11 | 11 | 11 | 10 | 7 | 6 | 5 | 4 | 4 | 4 | 3 | 3 | 3 | 3 | 2 | 2 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 262 |
Click a division to see the underlying tasks, oldest assignment date first.
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 813-Heron Hills-Richmond | VPO Work | Jul 10, 2026 | 56d overdue | Unassigned | $60 | Necesitan cambiar dos hojas de sofito, el que instaló las cámaras dejó el agujero muy grande y lo quieren exacto para que no se vea el agujero. El supervisor Mike Bash lo está auto | |
| 708-Highridge-Edge | Watering | Jul 29, 2026 | 37d overdue | Unassigned | $94 | ✅ 2026-07-23: 4 Days - Stucco delay - framers are gonna have to fix a porch column for being twisted - Jonathan 2026-07-29 ✅ 2026-07-14: Scaff Delay - Scaff delay - it hasn’t pass | |
| Bldg 70-Ridgehorne-Edge | Watering | Aug 1, 2026 | 34d overdue | Unassigned | $50 | ||
| 37-Lakeview Fields-Keystone Construction | Watering | Aug 5, 2026 | 30d overdue | Unassigned | $92 | ||
| 117-Vista at Harmony Place-Woodside | Watering | Aug 5, 2026 | 30d overdue | Unassigned | $59 | ||
| 2014-Wildflower-Toll Brothers | Faux Concrete | Aug 10, 2026 | 25d overdue | Unassigned | $1,182 | ⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-04 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l | |
| 47-Lakeview Fields-Keystone Construction | Misc. Work | Aug 25, 2026 | 10d overdue | Unassigned | $60 | Gutter was damaged during scaffolding removal and needs to be replaced. | |
| 2014-Wildflower-Toll Brothers | Foundation Plaster | Aug 27, 2026 | 8d overdue | Unassigned | $450 | ⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-04 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l | |
| 346-Mountain Vista at Sunset Flats-Pulte Homes | Paper/Wire | Aug 29, 2026 | 6d overdue | Unassigned | 2026-08-21 | $1,410 | ⭕ 2026-08-31: We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor Est End: 2026-09-08 |
| 106-Canyon Park-Tri Pointe Homes | Paper/Wire | Aug 29, 2026 | 6d overdue | Unassigned | 2026-08-13 | $117 | ⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-08 ✅ 2026-08-20: |
| 232-Viridian Plus-DR Horton | Set Scaff | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-03 | $779 | |
| Units 136-140-Regency at Harmony Place-Woodside | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | $2,545 | ||
| Bldg 21-Silver Oaks-Lennar | Housewrap | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-02 | $1,733 | |
| 105 (FP)-Auburn Springs-Edge | Rock | Sep 1, 2026 | 3d overdue | Unassigned | $130 | ||
| 247-Viridian Plus-DR Horton | Set Scaff | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-04 | $817 | |
| 313-Viridian-DR Horton | Set Scaff | Sep 1, 2026 | 3d overdue | Unassigned | $639 | ||
| 143-Montreux-DR Horton | Siding | Sep 1, 2026 | 3d overdue | Unassigned | 2026-08-27 | $4,764 | ⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-03 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - |
| 143-Montreux-DR Horton | Soffit/Fascia | Sep 1, 2026 | 3d overdue | Unassigned | $748 | ⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-03 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - | |
| 130-Montreux-DR Horton | Soffit/Fascia | Sep 1, 2026 | 3d overdue | Unassigned | $608 | ✅ 2026-08-28: Material Delay - Missing all the siding - Alex 2026-09-03 | |
| 102-Canton Ridge-Richmond | Special Corbels | Sep 1, 2026 | 3d overdue | Unassigned | $50 | ||
| 826-Broadview Shores-Ivory | Paint | Sep 2, 2026 | 2d overdue | Unassigned | $320 | ✅ 2026-08-24: Material Delay - Missing all the lath and stucco orders - Alex 2026-08-28 | |
| 143-Montreux-DR Horton | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $706 | ⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-03 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - | |
| 131-Montreux-DR Horton | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $1,431 | ||
| 826-Broadview Shores-Ivory | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $2,299 | ✅ 2026-08-24: Material Delay - Missing all the lath and stucco orders - Alex 2026-08-28 | |
| 143-Montreux-DR Horton | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $83 | ⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-03 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - | |
| 131-Montreux-DR Horton | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $168 | ||
| 2232-Wildflower-Edge | Fix Scaff | Sep 3, 2026 | 1d overdue | Unassigned | $40 | Ocupamos areglar el andamio enfrente donde removieron los del drywall para poder meter el drywall adentro | |
| 722-Highridge-Edge | Remove Scaff | Sep 3, 2026 | 1d overdue | Unassigned | $351 | ✅ 2026-08-13: 3 Days - Lath delay - window missing - Jonathan 2026-08-18 | |
| 2218-Wildflower-Edge | Remove Scaff | Sep 3, 2026 | 1d overdue | Unassigned | $435 | ||
| 510-Ridgeview Cottages-Ivory | Remove Scaff | Sep 3, 2026 | 1d overdue | Unassigned | $370 | ||
| Bldg 20-Silver Oaks-Lennar | Remove Scaff | Sep 3, 2026 | 1d overdue | Unassigned | $961 | ||
| 103-Auburn Springs-Edge | Rock | Sep 3, 2026 | 1d overdue | Unassigned | $970 | ✅ 2026-08-24: 2 Days - Waiting for Columns to be done.it’s been sense last Tuesday - Harrison 2026-08-26 | |
| 531-River Point-Edge | Rock | Sep 3, 2026 | 1d overdue | Unassigned | $187 | ||
| 531-River Point-Edge | Scratch Coat | Sep 3, 2026 | 1d overdue | Unassigned | $50 | ||
| Units 279-284-Highline-Century | Stucco Brown | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-24 | $2,453 | |
| 2024-Wildflower-Toll Brothers | Faux Concrete | Sep 4, 2026 | today | Unassigned | $1,532 | ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-08-31 | |
| Park Restroom 1-Viridian Townhomes-DR Horton | Gutters | Sep 4, 2026 | today | Unassigned | $108 | ||
| 135-Auburn Springs-Edge | Housewrap | Sep 4, 2026 | today | Unassigned | 2026-08-28 | $1,037 | |
| 1028-Harmony Ridge-Edge | Paint | Sep 4, 2026 | today | Unassigned | $431 | ||
| 135-Auburn Springs-Edge | Paper/Wire | Sep 4, 2026 | today | Unassigned | 2026-08-28 | $121 | |
| 532-River Point-Edge | Remove Scaff | Sep 4, 2026 | today | Unassigned | $359 | ||
| 30-Tanner Flats-Ivory | Remove Scaff | Sep 4, 2026 | today | Unassigned | $425 | ||
| 902-Harmony Ridge-Edge | Remove Scaff | Sep 4, 2026 | today | Unassigned | $475 | ✅ 2026-08-05: 2 Days - Hold on exteriors besides scaff - Jorge 2026-08-07 | |
| 352 (FP)-Viridian Emerald-DR Horton | Rock | Sep 4, 2026 | today | Unassigned | $351 | ||
| 919-Broadview Shores-Ivory | Rock | Sep 4, 2026 | today | Unassigned | $1,459 | ||
| 248-Canton Ridge-Richmond | Rock | Sep 4, 2026 | today | Unassigned | $933 | ||
| 717-Highridge-Edge | Rock | Sep 4, 2026 | today | Unassigned | $129 | ||
| 507-River Point-Edge | Rock | Sep 4, 2026 | today | Unassigned | $558 | ✅ 2026-08-31: 2 Days - Finish columns - Harrison 2026-09-02 | |
| 723-Highridge-Edge | Rock | Sep 4, 2026 | today | Unassigned | $527 | ||
| 919-Broadview Shores-Ivory | Scratch Coat | Sep 4, 2026 | today | Unassigned | $201 | ||
| 248-Canton Ridge-Richmond | Scratch Coat | Sep 4, 2026 | today | Unassigned | $104 | ||
| 507-River Point-Edge | Scratch Coat | Sep 4, 2026 | today | Unassigned | $81 | ✅ 2026-08-31: 2 Days - Finish columns - Harrison 2026-09-02 | |
| 233-Viridian Plus-DR Horton | Set Scaff | Sep 4, 2026 | today | Unassigned | $978 | ||
| 421-Viridian-DR Horton | Set Scaff | Sep 4, 2026 | today | Unassigned | $644 | ||
| 517-River Point-Edge | Set Scaff | Sep 4, 2026 | today | Unassigned | $625 | ||
| 919-Broadview Shores-Ivory | Siding | Sep 4, 2026 | today | Unassigned | 2026-08-24 | $1,398 | |
| 16122-Harmony-Meritage Homes | Soffit/Fascia | Sep 4, 2026 | today | Unassigned | $438 | ||
| 107-Vista at Harmony Place-Woodside | Stucco Brown | Sep 4, 2026 | today | Unassigned | 2026-08-24 | $889 | |
| 919-Broadview Shores-Ivory | Stucco Brown | Sep 4, 2026 | today | Unassigned | 2026-08-17 | $1,045 | |
| 248-Canton Ridge-Richmond | Stucco Brown | Sep 4, 2026 | today | Unassigned | 2026-08-26 | $1,012 | |
| 1028-Harmony Ridge-Edge | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | $1,021 | ||
| 1029-Harmony Ridge-Edge | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | $793 | ||
| 49-Tanner Flats-Ivory | Stucco Color | Sep 6, 2026 | in 2d | Unassigned | $949 | ||
| 913-Harmony Ridge-Edge | Stucco Color | Sep 6, 2026 | in 2d | Unassigned | 2026-09-03 | $1,336 | ✅ 2026-08-21: Missing window also columns - Jorge 2026-08-25 |
| 36-Lakeview Fields-Keystone Construction | Stucco Color | Sep 6, 2026 | in 2d | Unassigned | $1,256 | ||
| Wellspring Park Restroom-Viridian Townhomes-DR Horton | Set Scaff | Sep 7, 2026 | in 3d | Unassigned | $15 | ||
| 110-Vista at Harmony Place-Woodside | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | 2026-09-03 | $787 | |
| 341-Viridian-DR Horton | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $957 | ||
| 45-Tanner Flats-Ivory | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $949 | ||
| 338-Mountain Vista at Sunset Flats-Pulte Homes | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $1,527 | ✅ 2026-08-18: 4 Days - We need to wait to lath we need to pass the Housewrap inspection before we can continue with lath please don’t send any ath crews thanks - Victor 2026-08-24 | |
| 826-Broadview Shores-Ivory | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $1,001 | ✅ 2026-08-24: Material Delay - Missing all the lath and stucco orders - Alex 2026-08-28 | |
| 2024-Wildflower-Toll Brothers | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $130 | ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-08-31 | |
| 741-Broadview Shores-Ivory | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $846 | ||
| 243-Viridian Plus-DR Horton | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $1,221 | ||
| 723-Highridge-Edge | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $1,100 | ||
| 107-Auburn Springs-Edge | Set Scaff | Sep 9, 2026 | in 5d | Unassigned | 2026-09-07 | $840 | |
| Bldg 57-Harmony Ridge-Edge | Stucco Color | Sep 9, 2026 | in 5d | Unassigned | $2,382 | ||
| 234-Viridian Plus-DR Horton | Set Scaff | Sep 10, 2026 | in 6d | Unassigned | $763 | ||
| 2181-Wildflower-Edge | Set Scaff | Sep 10, 2026 | in 6d | Unassigned | $652 | ||
| 340-Viridian-DR Horton | Set Scaff | Sep 10, 2026 | in 6d | Unassigned | $606 | ||
| 314-Viridian-DR Horton | Set Scaff | Sep 11, 2026 | in 7d | Unassigned | $627 | ||
| 2227-Wildflower-Edge | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | $744 | ||
| 420-Viridian-DR Horton | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | $681 | ||
| 711-Ridgehorne-Edge | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | $740 | ||
| 1021-Harmony Ridge-Edge | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | 2026-09-14 | $777 | |
| 718-Highridge-Edge | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | $831 | ||
| 108-Auburn Springs-Edge | Set Scaff | Sep 14, 2026 | in 10d | Unassigned | $930 | ||
| Bldg 56-Harmony Ridge-Edge | Set Scaff | Sep 15, 2026 | in 11d | Unassigned | $1,891 | ||
| 115-Auburn Springs-Edge | Set Scaff | Sep 15, 2026 | in 11d | Unassigned | $778 | ||
| 339-Viridian-DR Horton | Set Scaff | Sep 16, 2026 | in 12d | Unassigned | $574 | ||
| 523-River Point-Edge | Set Scaff | Sep 16, 2026 | in 12d | Unassigned | $742 | ||
| Bldg 37-Highridge-Edge | Insl Foam 1 | Sep 17, 2026 | in 13d | Unassigned | $115 | ||
| Bldg 37-Highridge-Edge | Insl Walls | Sep 17, 2026 | in 13d | Unassigned | $912 | ||
| 147-Auburn Springs-Edge | Set Scaff | Sep 17, 2026 | in 13d | Unassigned | $723 | ||
| 711-Highridge-Edge | Set Scaff | Sep 17, 2026 | in 13d | Unassigned | $557 | ||
| 2212-Wildflower-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $655 | ||
| 133-Auburn Springs-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $985 | ||
| 2228-Wildflower-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $803 | ||
| Bldg 37-Highridge-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $1,104 | ||
| 518-River Point-Edge | Set Scaff | Sep 21, 2026 | in 17d | Unassigned | $583 | ||
| 525-River Point-Edge | Set Scaff | Sep 21, 2026 | in 17d | Unassigned | $671 | ||
| 353-Viridian Emerald-DR Horton | Set Scaff | Sep 22, 2026 | in 18d | Unassigned | $841 | ||
| 1031-Harmony Ridge-Edge | Set Scaff | Sep 22, 2026 | in 18d | Unassigned | $709 | ||
| Bldg 59-Harmony Ridge-Edge | Set Scaff | Sep 29, 2026 | in 25d | Unassigned | $1,480 | ||
| Bldg 39-Highridge-Edge | Insl Attic | Oct 9, 2026 | in 35d | Unassigned | $80 | ||
| Bldg 37-Highridge-Edge | Insl Attic | Nov 3, 2026 | in 60d | Unassigned | $80 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 17-Sunset Ridges-Sierra Homes | Siding | Aug 6, 2026 | 29d overdue | Unassigned | 2026-07-30 | $261 | ✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24 |
| 108-Red Hill-Ivory | Set Brick Scaff | Aug 12, 2026 | 23d overdue | Unassigned | $40 | ||
| 206-Fremont Meadows-Sterling Homes | Scratch Coat | Aug 13, 2026 | 22d overdue | Unassigned | $50 | ||
| 71-Brookfield-Lennar | Gutters | Aug 24, 2026 | 11d overdue | Unassigned | $167 | ||
| 63-Brookfield-Lennar | Gutters | Aug 24, 2026 | 11d overdue | Unassigned | $236 | ||
| 106-Red Hill-Ivory | Set Brick Scaff | Aug 24, 2026 | 11d overdue | Unassigned | $0 | ||
| Bldg 25-Railrunner-DAI Construction | Gutters | Aug 25, 2026 | 10d overdue | Unassigned | $806 | ||
| 108-Red Hill-Ivory | Scratch Coat | Aug 25, 2026 | 10d overdue | Unassigned | $50 | ||
| Bldg K-Sugar Creek Townhomes-Visionary | Remove Scaff | Aug 26, 2026 | 9d overdue | Unassigned | $408 | ||
| Bldg 6-Midtown Village-DR Horton | Set Brick Scaff | Aug 26, 2026 | 9d overdue | Unassigned | $0 | ||
| 1523-Cranefield Estates-Ivory | Set Brick Scaff | Aug 26, 2026 | 9d overdue | Unassigned | $134 | ||
| 176-Mountain Gate-Sierra Homes | Siding | Aug 27, 2026 | 8d overdue | Unassigned | 2026-08-27 | $220 | |
| 116-Meadows at Hyde Park-Visionary | Siding | Aug 27, 2026 | 8d overdue | Unassigned | 2026-08-21 | $1,704 | |
| 106-Red Hill-Ivory | Brick | Aug 28, 2026 | 7d overdue | Unassigned | $50 | ||
| 62-Brookfield-Lennar | Housewrap | Aug 28, 2026 | 7d overdue | Unassigned | 2026-08-29 | $632 | |
| Bldg 2-Railrunner-DAI Construction | Siding | Aug 28, 2026 | 7d overdue | Unassigned | 2026-08-14 | $782 | ✅ 2026-07-09: 21 Days - The superintendent said he was ready but I check the building and it’s not ready 100% still has a lot the superintendent apologized for this - George 2026-0 |
| 106-Three Farms Jenkins Fields-Ivory | Gutters | Aug 29, 2026 | 6d overdue | Unassigned | $146 | ||
| Bldg K-Sugar Creek Townhomes-Visionary | Gutters | Aug 29, 2026 | 6d overdue | Unassigned | $874 | ||
| Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction Group | Rock | Aug 31, 2026 | 4d overdue | Unassigned | $635 | ⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-15 | |
| 102-Meadows at Hyde Park-Visionary | Siding | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-04 | $1,261 | |
| 314-Stagecoach Estates-McArthur | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-07 | $809 | |
| 323-Stagecoach Estates-McArthur | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-04 | $791 | |
| 55-Cardamine-Sierra Homes | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-04 | $331 | ✅ 2026-08-12: Material Delay - We don’t have vinyl materials - Jose 2026-08-31 |
| 501-Legacy Park-Ivory | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-07 | $1,004 | |
| 1708-Cranefield Estates-Ivory | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-02 | $928 | |
| 227-Bristol Farms-Regal Homes | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-03 | $1,246 | |
| 229-Bristol Farms-Regal Homes | Stucco Color | Aug 31, 2026 | 4d overdue | Unassigned | 2026-09-07 | $1,210 | |
| 113-Meadows at Hyde Park-Visionary | Gutters | Sep 1, 2026 | 3d overdue | Unassigned | $352 | ✅ 2026-07-23: 11 Days - They missing the front porch cap - Jose 2026-08-07 ✅ 2026-07-22: Material Delay - We still don’t have material - Jose 2026-08-07 | |
| 125-Palomino-DR Horton | Scratch Coat | Sep 1, 2026 | 3d overdue | Unassigned | $95 | ||
| 338-Sugar Creek-Visionary | Siding | Sep 1, 2026 | 3d overdue | Unassigned | 2026-08-28 | $489 | |
| Bldg AC-North Point Townhomes-Visionary | Siding | Sep 1, 2026 | 3d overdue | Unassigned | 2026-08-19 | $6,469 | |
| 313-Stagecoach Estates-McArthur | Stucco Color | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-02 | $951 | |
| 603-Vineyard-Visionary | Brown & Mesh | Sep 2, 2026 | 2d overdue | Unassigned | $1,618 | ||
| 520-Vineyard-Visionary | Brown & Mesh | Sep 2, 2026 | 2d overdue | Unassigned | $736 | ✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24 | |
| 108-Meadows at Hyde Park-Visionary | Gutters | Sep 2, 2026 | 2d overdue | Unassigned | $461 | ||
| 4-Heritage Parkway-Sierra Homes | Remove Scaff | Sep 2, 2026 | 2d overdue | Unassigned | $13 | ✅ 2026-07-29: 4 Days - We still don’t have vinyl material - Jose 2026-08-04 | |
| 603-Vineyard-Visionary | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $695 | ||
| 2-Brynlee Acres-Hamlet | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $1,609 | ||
| SF 6-Flint Acres-Henry Walker Homes | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $1,290 | ||
| 520-Vineyard-Visionary | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $402 | ✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24 | |
| 603-Vineyard-Visionary | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $74 | ||
| SF 6-Flint Acres-Henry Walker Homes | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $187 | ||
| 520-Vineyard-Visionary | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $50 | ✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24 | |
| 723-Ridgeline Park-Visionary | Siding | Sep 2, 2026 | 2d overdue | Unassigned | 2026-08-19 | $1,603 | ✅ 2026-09-02: -1 Days - Can’t start siding because front porch cap is not poured - Ronnie 2026-09-01 |
| 821-Ridgeline Park-Visionary | Siding | Sep 2, 2026 | 2d overdue | Unassigned | 2026-08-13 | $941 | |
| 521-Vineyard-Visionary | Siding | Sep 2, 2026 | 2d overdue | Unassigned | 2026-08-27 | $714 | |
| 3-Brynlee Acres-Hamlet | Stucco Color | Sep 2, 2026 | 2d overdue | Unassigned | 2026-09-08 | $901 | |
| Bldg 12-Midtown Village-DR Horton | Stucco Color | Sep 2, 2026 | 2d overdue | Unassigned | 2026-09-04 | $1,751 | |
| 17-Sunset Ridges-Sierra Homes | Stucco Color | Sep 2, 2026 | 2d overdue | Unassigned | 2026-09-04 | $301 | ✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24 |
| 311-Legacy Park-Ivory | Brick | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-21 | $2,826 | |
| 609-Village at Fox Meadows-Visionary | Brown & Mesh | Sep 3, 2026 | 1d overdue | Unassigned | $1,117 | ||
| Bldg 18-Dixon Creek-DR Horton | Gutters | Sep 3, 2026 | 1d overdue | Unassigned | $602 | ||
| 2-Brynlee Acres-Hamlet | Paint | Sep 3, 2026 | 1d overdue | Unassigned | $284 | ||
| Bldg G-Legends Crossing Townhomes-Visionary | Paint | Sep 3, 2026 | 1d overdue | Unassigned | $187 | ||
| 108-Red Hill-Ivory | Paint | Sep 3, 2026 | 1d overdue | Unassigned | $1,340 | ||
| 5-Brynlee Acres-Hamlet | Paper/Wire | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-27 | $1,064 | ✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02 |
| 4-Brynlee Acres-Hamlet | Rock | Sep 3, 2026 | 1d overdue | Unassigned | $2,207 | ||
| 609-Village at Fox Meadows-Visionary | Rock | Sep 3, 2026 | 1d overdue | Unassigned | $434 | ||
| 4-Brynlee Acres-Hamlet | Scratch Coat | Sep 3, 2026 | 1d overdue | Unassigned | $228 | ||
| 609-Village at Fox Meadows-Visionary | Scratch Coat | Sep 3, 2026 | 1d overdue | Unassigned | $50 | ||
| 102-Village at Fox Meadows-Visionary | Set Scaff | Sep 3, 2026 | 1d overdue | Unassigned | 2026-09-03 | $446 | ✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03 |
| 102-Village at Fox Meadows-Visionary | Siding | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-27 | $1,217 | ✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03 |
| 4-Brynlee Acres-Hamlet | Siding | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-19 | $888 | |
| 311-Legacy Park-Ivory | Siding | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-17 | $766 | |
| 4-Brynlee Acres-Hamlet | Stucco Brown | Sep 3, 2026 | 1d overdue | Unassigned | 2026-08-19 | $933 | |
| 107-Stagecoach Estates-McArthur | Window Pre Wrap | Sep 3, 2026 | 1d overdue | Unassigned | $100 | ||
| 115-Three Farms Jenkins Fields-Ivory | Brick | Sep 4, 2026 | today | Unassigned | 2026-07-27 | $951 | |
| 115-Meadows at Hyde Park-Visionary | Brown & Mesh | Sep 4, 2026 | today | Unassigned | $1,232 | ||
| 229-Westwood Estates-Meritage Homes | Gutters | Sep 4, 2026 | today | Unassigned | $280 | ||
| 111-Stagecoach Estates-McArthur | Gutters | Sep 4, 2026 | today | Unassigned | $293 | ||
| 330-Riverside Estates-Fieldstone Homes | Gutters | Sep 4, 2026 | today | Unassigned | $321 | ||
| 107-Stagecoach Estates-McArthur | Housewrap | Sep 4, 2026 | today | Unassigned | 2026-08-26 | $635 | |
| Bldg U-Village at Fox Meadows Townhomes-Visionary | Paint | Sep 4, 2026 | today | Unassigned | $259 | ||
| 3-Brynlee Acres-Hamlet | Paint | Sep 4, 2026 | today | Unassigned | $396 | ||
| Bldg AC-North Point Townhomes-Visionary | Paper/Wire | Sep 4, 2026 | today | Unassigned | 2026-08-19 | $125 | |
| Bldg 6-Midtown Village-DR Horton | Paper/Wire | Sep 4, 2026 | today | Unassigned | 2026-08-14 | $2,244 | |
| 701-Ridgeline Park-Visionary | Remove Scaff | Sep 4, 2026 | today | Unassigned | $249 | ||
| Bldg U-Village at Fox Meadows Townhomes-Visionary | Rock | Sep 4, 2026 | today | Unassigned | $1,625 | ||
| 115-Meadows at Hyde Park-Visionary | Rock | Sep 4, 2026 | today | Unassigned | $729 | ||
| Bldg U-Village at Fox Meadows Townhomes-Visionary | Scratch Coat | Sep 4, 2026 | today | Unassigned | $219 | ||
| 115-Meadows at Hyde Park-Visionary | Scratch Coat | Sep 4, 2026 | today | Unassigned | $78 | ||
| 115-Three Farms Jenkins Fields-Ivory | Siding | Sep 4, 2026 | today | Unassigned | 2026-08-27 | $942 | |
| 103-Legends Crossing-Visionary | Paper/Wire | Sep 5, 2026 | in 1d | Unassigned | 2026-09-03 | $50 | |
| 12-Mountainside Estates-DR Horton | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | 2026-09-07 | $1,034 | |
| 11-Mountainside Estates-DR Horton | Stucco Color | Sep 6, 2026 | in 2d | Unassigned | 2026-09-07 | $1,115 | |
| 126-Palomino-DR Horton | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | 2026-09-04 | $1,570 | |
| 2-Brynlee Acres-Hamlet | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $692 | ||
| 125-Palomino-DR Horton | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | 2026-09-04 | $1,066 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Units 440-445-Legacy at Sky Ranch-Woodside | Stucco Color | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-04 | $1,754 | |
| 1004-Northstar Ranch-Destination Homes | Housewrap | Sep 2, 2026 | 2d overdue | Unassigned | 2026-09-07 | $217 | |
| 2909-Mountain Ridge-Edge | Set Scaff | Sep 2, 2026 | 2d overdue | Unassigned | 2026-09-04 | $494 | |
| 104-Pierson Farms-McArthur | Housewrap | Sep 3, 2026 | 1d overdue | Unassigned | 2026-09-07 | $752 | |
| 1005-Northstar Ranch-Destination Homes | Soffit/Fascia | Sep 3, 2026 | 1d overdue | Unassigned | $587 | ✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18 | |
| 1005-Northstar Ranch-Destination Homes | Gutters | Sep 4, 2026 | today | Unassigned | $351 | ✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18 | |
| 120-Capitol Reef-Edge | Paper/Wire | Sep 4, 2026 | today | Unassigned | 2026-09-07 | $50 | |
| Bldg 201-Mountain Ridge-Edge | Rock | Sep 4, 2026 | today | Unassigned | $1,868 | ||
| Bldg 202-Mountain Ridge-Edge | Rock | Sep 4, 2026 | today | Unassigned | $1,742 | ||
| 2902-Mountain Ridge-Edge | Rock | Sep 4, 2026 | today | Unassigned | $542 | ||
| Bldg 9-Taylor Villas-Edge | Rock | Sep 4, 2026 | today | Unassigned | $1,896 | ✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18 | |
| Bldg 201-Mountain Ridge-Edge | Scratch Coat | Sep 4, 2026 | today | Unassigned | $282 | ||
| 2902-Mountain Ridge-Edge | Scratch Coat | Sep 4, 2026 | today | Unassigned | $78 | ||
| Bldg 9-Taylor Villas-Edge | Scratch Coat | Sep 4, 2026 | today | Unassigned | $286 | ✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18 | |
| Bldg 201-Mountain Ridge-Edge | Stucco Brown | Sep 4, 2026 | today | Unassigned | 2026-08-27 | $2,107 | |
| 442-Daybreak Cottage Courts-Destination Homes | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | 2026-09-02 | $674 | |
| Bldg 20-Solari-Edge | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | $2,876 | ✅ 2026-08-19: 4 Days - Delayed for drywall windows and gas line - Dustin 2026-08-25 | |
| 2912-Mountain Ridge-Edge | Set Scaff | Sep 8, 2026 | in 4d | Unassigned | 2026-09-04 | $759 | |
| 328-Pagoda Grove-McArthur | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $925 | ||
| 23-Sky Ranch Cascade-Woodside | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | 2026-09-08 | $1,061 | |
| Bldg 21-Solari-Edge | Set Scaff | Sep 9, 2026 | in 5d | Unassigned | $1,778 | ||
| Bldg 22-Solari-Edge | Set Scaff | Sep 10, 2026 | in 6d | Unassigned | $1,543 | ||
| Bldg 211-Mountain Ridge-Edge | Insl Attic | Sep 14, 2026 | in 10d | Unassigned | $144 | ||
| Bldg 18-Solari-Edge | Insl Foam 1 | Sep 15, 2026 | in 11d | Unassigned | $116 | ||
| Bldg 19-Solari-Edge | Insl Foam 1 | Sep 15, 2026 | in 11d | Unassigned | $116 | ||
| Bldg 18-Solari-Edge | Insl Walls | Sep 15, 2026 | in 11d | Unassigned | $1,517 | ||
| Bldg 19-Solari-Edge | Insl Walls | Sep 15, 2026 | in 11d | Unassigned | $1,517 | ||
| 2929-Mountain Ridge-Edge | Set Scaff | Sep 15, 2026 | in 11d | Unassigned | $577 | ||
| 2916-Mountain Ridge-Edge | Set Scaff | Sep 17, 2026 | in 13d | Unassigned | $752 | ||
| Bldg 18-Solari-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $1,570 | ||
| Bldg 19-Solari-Edge | Set Scaff | Sep 18, 2026 | in 14d | Unassigned | $1,570 | ||
| Bldg 203-Mountain Ridge-Edge | Set Scaff | Sep 22, 2026 | in 18d | Unassigned | $1,474 | ||
| Bldg 22-Mt. Rainier-Edge | Insl Attic | Sep 23, 2026 | in 19d | Unassigned | $159 | ✅ 2026-08-12: 3 Days - Don’t start stucco brown until drywall windows are installed correctly - Arturo 2026-08-17 | |
| Bldg 9-Taylor Villas-Edge | Insl Attic | Sep 29, 2026 | in 25d | Unassigned | $179 | ✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18 | |
| Bldg 1-Solari-Edge | Insl Attic | Oct 1, 2026 | in 27d | Unassigned | $143 | ✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19 | |
| Bldg 208-Mountain Ridge-Edge | Insl Attic | Oct 14, 2026 | in 40d | Unassigned | $144 | ||
| Bldg 202-Mountain Ridge-Edge | Insl Attic | Oct 20, 2026 | in 46d | Unassigned | $143 | ||
| Bldg 22-Solari-Edge | Insl Attic | Oct 26, 2026 | in 52d | Unassigned | $160 | ||
| Bldg 18-Solari-Edge | Insl Attic | Nov 3, 2026 | in 60d | Unassigned | $192 | ||
| Bldg 19-Solari-Edge | Insl Attic | Nov 3, 2026 | in 60d | Unassigned | $192 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 10-Black Desert North Village-VGI | QC Walk | Feb 25, 2026 | 191d overdue | Unassigned | $0 | ✅ 2025-12-08: 11 Days - Tendremos que posponer el papel y el alambre, porque el Super me habló que si lo podemos empezar hasta el siguiente lunes - Francisco 2025-12-23 | |
| Bldg Y-Sage Haven Townhomes-Visionary | Paint | Aug 21, 2026 | 14d overdue | Unassigned | $1,551 | ||
| 75-Divario-Visionary | Window Pre Wrap | Aug 31, 2026 | 4d overdue | Unassigned | $100 | ||
| Bldg 133-Long Valley Townhomes-DR Horton | Watering | Sep 1, 2026 | 3d overdue | Unassigned | $189 | ||
| 24-Legacy at Sand Hollow-Visionary | Window Pre Wrap | Sep 1, 2026 | 3d overdue | Unassigned | $100 | ||
| 4156-Long Valley Rambler-DR Horton | Rock | Sep 2, 2026 | 2d overdue | Unassigned | $406 | ||
| 4156-Long Valley Rambler-DR Horton | Scratch Coat | Sep 2, 2026 | 2d overdue | Unassigned | $50 | ||
| 4156-Long Valley Rambler-DR Horton | Stucco Brown | Sep 2, 2026 | 2d overdue | Unassigned | 2026-08-25 | $1,053 | |
| 410-The Preserve at Alaia-Visionary | Paint | Sep 4, 2026 | today | Unassigned | $50 | ||
| 4164-Long Valley Rambler-DR Horton | Stucco Color | Sep 5, 2026 | in 1d | Unassigned | 2026-09-04 | $865 | |
| 4272-Long Valley-DR Horton | Stucco Color | Sep 6, 2026 | in 2d | Unassigned | 2026-09-04 | $1,465 | |
| 4290-Long Valley-DR Horton | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $2,064 | ||
| 35-Legacy at Sand Hollow-Visionary | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | $2,523 | ||
| 4305-Long Valley-DR Horton | Stucco Color | Sep 7, 2026 | in 3d | Unassigned | 2026-09-04 | $1,592 | ✅ 2026-08-21: 6 Days - Cannot finish lath. Missing window - Daniel 2026-08-31 |
| 16-Desert Cove-Richmond | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | 2026-09-04 | $1,687 | |
| 4202-Long Valley-DR Horton | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $1,755 | ||
| 76-Divario-Visionary | Stucco Color | Sep 8, 2026 | in 4d | Unassigned | $2,195 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Bldg C-Residence at Millcreek-Rimrock | Scratch Coat | Jul 16, 2026 | 50d overdue | Unassigned | $1,811 | ||
| Bldg D-Residence at Millcreek-Rimrock | Remove Scaff | Aug 6, 2026 | 29d overdue | Unassigned | $2,133 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Penetration Sealing | Aug 15, 2026 | 20d overdue | Unassigned | $0 | ||
| Bldg C-Residence at Millcreek-Rimrock | Paint | Aug 24, 2026 | 11d overdue | Unassigned | $1,838 | ||
| White Dome Chapel-St George-Grass Creek | Set Scaff | Aug 27, 2026 | 8d overdue | Unassigned | 2026-08-27 | $57 | |
| Bldg RU-1-ARA Southwest-Campbell Construction | EIFS Weather Barrier | Sep 1, 2026 | 3d overdue | Unassigned | $1,843 | ||
| 206-Fort Pierce-Dawson Development | Paper/Wire | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-03 | $50 | |
| 205-Fort Pierce-Dawson Development | Paper/Wire | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-03 | $50 | |
| 203-Fort Pierce-Dawson Development | Paper/Wire | Sep 1, 2026 | 3d overdue | Unassigned | 2026-09-03 | $50 | |
| Bldg C-Residence at Millcreek-Rimrock | Stucco Color | Sep 2, 2026 | 2d overdue | Unassigned | $6,354 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown | Misc. Work | Aug 17, 2026 | 18d overdue | Unassigned | $0 | Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP |
Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):
Assigned Task Date is not blankTeam (Task Team) is blankCompleted Date/Time is blankTeam and Team Name agree on every record
(0 disagreements), so "no team assigned" is unambiguous.