Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 5, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 14,022 task records pulled, 237 matched the filter · assignment dates Jul 16, 2026 to Nov 3, 2026

237
Ready for assignment
121
Past assignment date
6
Divisions affected
$211,574
Unassigned task pay
51d
Oldest overdue

Ready tasks by division

023467093Orem9341 odOgden8659 odSalt Lake3710 odCommercial1010 odSt. George10Corporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Orem43349202393
Ogden·13461413·86
Salt Lake··10361837
Commercial235···10
St. George···28·10
Corporate·1····1
All divisions62095284741 237

Pivot — division × task type

Which trades the backlog is sitting in. Scroll sideways for all 28 task types.

DivisionStucco ColorSet ScaffRockScratch CoatSidingGuttersInsl AtticPaper/WireSoffit/FasciaRemove ScaffWateringStucco BrownPaintSet Brick ScaffInsl WallsInsl Foam 1Brown & MeshHousewrapMisc. WorkBrickEIFS Weather BarrierWindow Pre WrapSpecial CorbelsPenetration SealingShuttersVinylFaux ConcreteFoundation PlasterTotal
Orem162912631236243··11··1···1···1193
Ogden162891313·3131134··31·2·1··11··86
Salt Lake6832·1911··1··22·1··········37
Commercial11·1···3·1··1·······1··1····10
St. George9···········1···············10
Corporate··················1·········1
All divisions484023181615111086555433322211111111 237

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Orem — 93 tasks ready for assignment · 41 overdue · $73,772
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
708-Highridge-EdgeWateringJul 29, 202638d overdueUnassigned$94✅ 2026-07-23: 4 Days - Stucco delay - framers are gonna have to fix a porch column for being twisted - Jonathan 2026-07-29 ✅ 2026-07-14: Scaff Delay - Scaff delay - it hasn’t pass
Bldg 70-Ridgehorne-EdgeWateringAug 1, 202635d overdueUnassigned$50
37-Lakeview Fields-Keystone ConstructionWateringAug 5, 202631d overdueUnassigned$92
117-Vista at Harmony Place-WoodsideWateringAug 5, 202631d overdueUnassigned$59
2014-Wildflower-Toll BrothersFaux ConcreteAug 10, 202626d overdueUnassigned$1,182⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-04 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l
47-Lakeview Fields-Keystone ConstructionMisc. WorkAug 25, 202611d overdueUnassigned$60Gutter was damaged during scaffolding removal and needs to be replaced.
2014-Wildflower-Toll BrothersFoundation PlasterAug 27, 20269d overdueUnassigned$450⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-04 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l
346-Mountain Vista at Sunset Flats-Pulte HomesPaper/WireAug 29, 20267d overdueUnassigned2026-08-21$1,410✅ 2026-08-31: 6 Days - We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor 2026-09-08
106-Canyon Park-Tri Pointe HomesPaper/WireAug 29, 20267d overdueUnassigned2026-08-13$117⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-08 ✅ 2026-08-20:
Units 136-140-Regency at Harmony Place-WoodsideStucco ColorAug 31, 20265d overdueUnassigned2026-09-04$2,545
143-Montreux-DR HortonSidingSep 1, 20264d overdueUnassigned2026-08-27$5,033⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-07 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped -
143-Montreux-DR HortonSoffit/FasciaSep 1, 20264d overdueUnassigned$980⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-07 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped -
130-Montreux-DR HortonSoffit/FasciaSep 1, 20264d overdueUnassigned$779✅ 2026-08-28: Material Delay - Missing all the siding - Alex 2026-09-03
102-Canton Ridge-RichmondSpecial CorbelsSep 1, 20264d overdueUnassigned$50
143-Montreux-DR HortonRockSep 2, 20263d overdueUnassigned$706⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-07 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped -
131-Montreux-DR HortonRockSep 2, 20263d overdueUnassigned$1,431
826-Broadview Shores-IvoryRockSep 2, 20263d overdueUnassigned$2,299✅ 2026-08-24: Material Delay - Missing all the lath and stucco orders - Alex 2026-08-28
143-Montreux-DR HortonScratch CoatSep 2, 20263d overdueUnassigned$83⭕ 2026-09-01: Material Delay - Waiting for siding to be delivered - Alex Est End: 2026-09-07 ⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped -
131-Montreux-DR HortonScratch CoatSep 2, 20263d overdueUnassigned$168
110-Vista at Harmony Place-WoodsideSidingSep 2, 20263d overdueUnassigned2026-08-24$1,290
231-Viridian Plus-DR HortonRemove ScaffSep 3, 20262d overdueUnassigned$458
531-River Point-EdgeRockSep 3, 20262d overdueUnassigned$187
531-River Point-EdgeScratch CoatSep 3, 20262d overdueUnassigned$50
421-Viridian-DR HortonSet ScaffSep 3, 20262d overdueUnassigned$644
517-River Point-EdgeSet ScaffSep 3, 20262d overdueUnassigned2026-09-04$625
Park Restroom 1-Viridian Townhomes-DR HortonGuttersSep 4, 20261d overdueUnassigned$108
135-Auburn Springs-EdgePaper/WireSep 4, 20261d overdueUnassigned2026-08-28$121
423-Viridian-DR HortonRemove ScaffSep 4, 20261d overdueUnassigned$365
352 (FP)-Viridian Emerald-DR HortonRockSep 4, 20261d overdueUnassigned$351
919-Broadview Shores-IvoryRockSep 4, 20261d overdueUnassigned$1,459
248-Canton Ridge-RichmondRockSep 4, 20261d overdueUnassigned$933
717-Highridge-EdgeRockSep 4, 20261d overdueUnassigned$129
507-River Point-EdgeRockSep 4, 20261d overdueUnassigned$558✅ 2026-08-31: 2 Days - Finish columns - Harrison 2026-09-02
723-Highridge-EdgeRockSep 4, 20261d overdueUnassigned$527
248-Canton Ridge-RichmondScratch CoatSep 4, 20261d overdueUnassigned$104
507-River Point-EdgeScratch CoatSep 4, 20261d overdueUnassigned$81✅ 2026-08-31: 2 Days - Finish columns - Harrison 2026-09-02
345-Mountain Vista at Sunset Flats-Pulte HomesSet ScaffSep 4, 20261d overdueUnassigned2026-09-04$870
16122-Harmony-Meritage HomesSoffit/FasciaSep 4, 20261d overdueUnassigned$616
Bldg 10-Montreux Townhomes-DR HortonSoffit/FasciaSep 4, 20261d overdueUnassigned$1,638✅ 2026-08-12: 4 Days - Do not send teams yet. Waiting on columns to be fully wrapped before commencing. - Alex 2026-08-18
36-Lakeview Fields-Keystone ConstructionSoffit/FasciaSep 4, 20261d overdueUnassigned$652
248-Canton Ridge-RichmondStucco BrownSep 4, 20261d overdueUnassigned2026-08-26$1,012
2021-Wildflower-Toll BrothersRockSep 5, 2026todayUnassigned$1,893⭕ 2026-09-02: Brown delay - missing drywall window - good to proceed on scratch - Jonathan Est End: 2026-09-08 ✅ 2026-08-21: 1 Days - Tyvek delay - there is a front section of Sca
1027-Harmony Ridge-EdgeRockSep 5, 2026todayUnassigned$187
1027-Harmony Ridge-EdgeScratch CoatSep 5, 2026todayUnassigned$50
233-Viridian Plus-DR HortonSet ScaffSep 5, 2026todayUnassigned$978
346-Mountain Vista at Sunset Flats-Pulte HomesSidingSep 5, 2026todayUnassigned2026-08-27$776✅ 2026-08-31: 6 Days - We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor 2026-09-08
49-Tanner Flats-IvorySoffit/FasciaSep 5, 2026todayUnassigned$662
2021-Wildflower-Toll BrothersStucco BrownSep 5, 2026todayUnassigned2026-08-21$129⭕ 2026-09-02: Brown delay - missing drywall window - good to proceed on scratch - Jonathan Est End: 2026-09-08 ✅ 2026-08-21: 1 Days - Tyvek delay - there is a front section of Sca
1027-Harmony Ridge-EdgeStucco BrownSep 5, 2026todayUnassigned2026-08-24$1,117
1028-Harmony Ridge-EdgeStucco ColorSep 5, 2026todayUnassigned$1,021
313-Viridian-DR HortonSet ScaffSep 6, 2026in 1dUnassigned$639
49-Tanner Flats-IvoryStucco ColorSep 6, 2026in 1dUnassigned$949
913-Harmony Ridge-EdgeStucco ColorSep 6, 2026in 1dUnassigned2026-09-03$1,336✅ 2026-08-21: Missing window also columns - Jorge 2026-08-25
36-Lakeview Fields-Keystone ConstructionStucco ColorSep 6, 2026in 1dUnassigned$1,256
Wellspring Park Restroom-Viridian Townhomes-DR HortonSet ScaffSep 7, 2026in 2dUnassigned$15
110-Vista at Harmony Place-WoodsideStucco ColorSep 7, 2026in 2dUnassigned2026-09-03$787
341-Viridian-DR HortonStucco ColorSep 7, 2026in 2dUnassigned2026-09-04$957
45-Tanner Flats-IvoryStucco ColorSep 7, 2026in 2dUnassigned$949
338-Mountain Vista at Sunset Flats-Pulte HomesStucco ColorSep 7, 2026in 2dUnassigned$1,527✅ 2026-08-18: 4 Days - We need to wait to lath we need to pass the Housewrap inspection before we can continue with lath please don’t send any ath crews thanks - Victor 2026-08-24
826-Broadview Shores-IvoryStucco ColorSep 7, 2026in 2dUnassigned$1,001✅ 2026-08-24: Material Delay - Missing all the lath and stucco orders - Alex 2026-08-28
2024-Wildflower-Toll BrothersStucco ColorSep 8, 2026in 3dUnassigned$130✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-08-31
741-Broadview Shores-IvoryStucco ColorSep 8, 2026in 3dUnassigned$846
243-Viridian Plus-DR HortonStucco ColorSep 8, 2026in 3dUnassigned2026-09-08$1,221
723-Highridge-EdgeStucco ColorSep 8, 2026in 3dUnassigned2026-09-08$1,100
107-Auburn Springs-EdgeSet ScaffSep 9, 2026in 4dUnassigned2026-09-07$840
Bldg 57-Harmony Ridge-EdgeStucco ColorSep 9, 2026in 4dUnassigned$2,382
919-Broadview Shores-IvoryStucco ColorSep 9, 2026in 4dUnassigned$902
234-Viridian Plus-DR HortonSet ScaffSep 10, 2026in 5dUnassigned$763
2181-Wildflower-EdgeSet ScaffSep 10, 2026in 5dUnassigned$652
340-Viridian-DR HortonSet ScaffSep 10, 2026in 5dUnassigned$606
2227-Wildflower-EdgeSet ScaffSep 14, 2026in 9dUnassigned$744
420-Viridian-DR HortonSet ScaffSep 14, 2026in 9dUnassigned$681
711-Ridgehorne-EdgeSet ScaffSep 14, 2026in 9dUnassigned$740
1021-Harmony Ridge-EdgeSet ScaffSep 14, 2026in 9dUnassigned2026-09-14$777
718-Highridge-EdgeSet ScaffSep 14, 2026in 9dUnassigned$831
108-Auburn Springs-EdgeSet ScaffSep 14, 2026in 9dUnassigned$930
Bldg 56-Harmony Ridge-EdgeSet ScaffSep 15, 2026in 10dUnassigned$1,891
115-Auburn Springs-EdgeSet ScaffSep 15, 2026in 10dUnassigned$778
339-Viridian-DR HortonSet ScaffSep 16, 2026in 11dUnassigned$574
Bldg 37-Highridge-EdgeInsl Foam 1Sep 17, 2026in 12dUnassigned$115
Bldg 37-Highridge-EdgeInsl WallsSep 17, 2026in 12dUnassigned$912
523-River Point-EdgeSet ScaffSep 17, 2026in 12dUnassigned$742
147-Auburn Springs-EdgeSet ScaffSep 17, 2026in 12dUnassigned$723
711-Highridge-EdgeSet ScaffSep 17, 2026in 12dUnassigned$557
2212-Wildflower-EdgeSet ScaffSep 18, 2026in 13dUnassigned$655
133-Auburn Springs-EdgeSet ScaffSep 18, 2026in 13dUnassigned$985
2228-Wildflower-EdgeSet ScaffSep 18, 2026in 13dUnassigned$803
Bldg 37-Highridge-EdgeSet ScaffSep 18, 2026in 13dUnassigned$1,104
353-Viridian Emerald-DR HortonSet ScaffSep 22, 2026in 17dUnassigned$841
1031-Harmony Ridge-EdgeSet ScaffSep 22, 2026in 17dUnassigned$709
Bldg 59-Harmony Ridge-EdgeSet ScaffSep 29, 2026in 24dUnassigned$1,480
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 34dUnassigned$80
Bldg 37-Highridge-EdgeInsl AtticNov 3, 2026in 59dUnassigned$80
Ogden — 86 tasks ready for assignment · 59 overdue · $68,571
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
108-Red Hill-IvorySet Brick ScaffAug 12, 202624d overdueUnassigned$40
206-Fremont Meadows-Sterling HomesScratch CoatAug 13, 202623d overdueUnassigned$50
71-Brookfield-LennarGuttersAug 24, 202612d overdueUnassigned$167
63-Brookfield-LennarGuttersAug 24, 202612d overdueUnassigned$236
106-Red Hill-IvorySet Brick ScaffAug 24, 202612d overdueUnassigned$0
Bldg 25-Railrunner-DAI ConstructionGuttersAug 25, 202611d overdueUnassigned$806
108-Red Hill-IvoryScratch CoatAug 25, 202611d overdueUnassigned$50
Bldg 6-Midtown Village-DR HortonSet Brick ScaffAug 26, 202610d overdueUnassigned$0
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 202610d overdueUnassigned$134
176-Mountain Gate-Sierra HomesSidingAug 27, 20269d overdueUnassigned2026-08-27$220
116-Meadows at Hyde Park-VisionarySidingAug 27, 20269d overdueUnassigned2026-08-21$1,704
106-Red Hill-IvoryBrickAug 28, 20268d overdueUnassigned$50
Bldg 2-Railrunner-DAI ConstructionSidingAug 28, 20268d overdueUnassigned2026-08-14$782✅ 2026-07-09: 21 Days - The superintendent said he was ready but I check the building and it’s not ready 100% still has a lot the superintendent apologized for this - George 2026-0
106-Three Farms Jenkins Fields-IvoryGuttersAug 29, 20267d overdueUnassigned$146
Bldg K-Sugar Creek Townhomes-VisionaryGuttersAug 29, 20267d overdueUnassigned$874
Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction GroupRockAug 31, 20265d overdueUnassigned$635⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-15
102-Meadows at Hyde Park-VisionarySidingAug 31, 20265d overdueUnassigned2026-09-04$1,261
323-Stagecoach Estates-McArthurStucco ColorAug 31, 20265d overdueUnassigned2026-09-04$791
227-Bristol Farms-Regal HomesStucco ColorAug 31, 20265d overdueUnassigned2026-09-03$1,246
229-Bristol Farms-Regal HomesStucco ColorAug 31, 20265d overdueUnassigned2026-09-07$1,210
113-Meadows at Hyde Park-VisionaryGuttersSep 1, 20264d overdueUnassigned$352✅ 2026-07-23: 11 Days - They missing the front porch cap - Jose 2026-08-07 ✅ 2026-07-22: Material Delay - We still don’t have material - Jose 2026-08-07
338-Sugar Creek-VisionarySidingSep 1, 20264d overdueUnassigned2026-08-28$489
Bldg AC-North Point Townhomes-VisionarySidingSep 1, 20264d overdueUnassigned2026-08-19$6,469
313-Stagecoach Estates-McArthurStucco ColorSep 1, 20264d overdueUnassigned2026-09-02$951
603-Vineyard-VisionaryBrown & MeshSep 2, 20263d overdueUnassigned$1,618
520-Vineyard-VisionaryBrown & MeshSep 2, 20263d overdueUnassigned$736✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24
108-Meadows at Hyde Park-VisionaryGuttersSep 2, 20263d overdueUnassigned$461
4-Heritage Parkway-Sierra HomesRemove ScaffSep 2, 20263d overdueUnassigned$13✅ 2026-07-29: 4 Days - We still don’t have vinyl material - Jose 2026-08-04
603-Vineyard-VisionaryRockSep 2, 20263d overdueUnassigned$695
SF 6-Flint Acres-Henry Walker HomesRockSep 2, 20263d overdueUnassigned$1,290
520-Vineyard-VisionaryRockSep 2, 20263d overdueUnassigned$402✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24
603-Vineyard-VisionaryScratch CoatSep 2, 20263d overdueUnassigned$74
SF 6-Flint Acres-Henry Walker HomesScratch CoatSep 2, 20263d overdueUnassigned$187
520-Vineyard-VisionaryScratch CoatSep 2, 20263d overdueUnassigned$50✅ 2026-08-20: Scaff Delay - we still don't has initial order material - Jose 2026-08-24
723-Ridgeline Park-VisionarySidingSep 2, 20263d overdueUnassigned2026-08-19$1,603✅ 2026-09-02: -1 Days - Can’t start siding because front porch cap is not poured - Ronnie 2026-09-01
821-Ridgeline Park-VisionarySidingSep 2, 20263d overdueUnassigned2026-08-13$941
521-Vineyard-VisionarySidingSep 2, 20263d overdueUnassigned2026-08-27$714
3-Brynlee Acres-HamletStucco ColorSep 2, 20263d overdueUnassigned2026-09-08$901
Bldg 12-Midtown Village-DR HortonStucco ColorSep 2, 20263d overdueUnassigned2026-09-04$1,751
17-Sunset Ridges-Sierra HomesStucco ColorSep 2, 20263d overdueUnassigned2026-09-04$301✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
311-Legacy Park-IvoryBrickSep 3, 20262d overdueUnassigned2026-08-21$2,826
Bldg 18-Dixon Creek-DR HortonGuttersSep 3, 20262d overdueUnassigned$602
Bldg G-Legends Crossing Townhomes-VisionaryPaintSep 3, 20262d overdueUnassigned$187
5-Brynlee Acres-HamletPaper/WireSep 3, 20262d overdueUnassigned2026-08-27$1,064✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02
4-Brynlee Acres-HamletRockSep 3, 20262d overdueUnassigned$2,207
4-Brynlee Acres-HamletScratch CoatSep 3, 20262d overdueUnassigned$228
102-Village at Fox Meadows-VisionarySet ScaffSep 3, 20262d overdueUnassigned2026-09-03$446✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
102-Village at Fox Meadows-VisionarySidingSep 3, 20262d overdueUnassigned2026-08-27$1,217✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
4-Brynlee Acres-HamletSidingSep 3, 20262d overdueUnassigned2026-08-19$888
4-Brynlee Acres-HamletStucco BrownSep 3, 20262d overdueUnassigned2026-08-19$933
107-Stagecoach Estates-McArthurWindow Pre WrapSep 3, 20262d overdueUnassigned$100
115-Meadows at Hyde Park-VisionaryBrown & MeshSep 4, 20261d overdueUnassigned$1,232
1709-Cranefield Estates-IvoryPaintSep 4, 20261d overdueUnassigned$304
723-Ridgeline Park-VisionaryPaper/WireSep 4, 20261d overdueUnassigned2026-08-19$635✅ 2026-09-02: -1 Days - Can’t start siding because front porch cap is not poured - Ronnie 2026-09-01
711-Ridgeline Park-VisionaryRemove ScaffSep 4, 20261d overdueUnassigned$0
701-Ridgeline Park-VisionaryRemove ScaffSep 4, 20261d overdueUnassigned$249
Bldg U-Village at Fox Meadows Townhomes-VisionaryRockSep 4, 20261d overdueUnassigned$1,625
115-Meadows at Hyde Park-VisionaryScratch CoatSep 4, 20261d overdueUnassigned$78
TH 6-Flint Acres-Henry Walker HomesSet ScaffSep 4, 20261d overdueUnassigned2026-09-04$772
254-Westwood Estates-Meritage HomesGuttersSep 5, 2026todayUnassigned$287
111-Stagecoach Estates-McArthurGuttersSep 5, 2026todayUnassigned$293
1707-Cranefield Estates-IvoryGuttersSep 5, 2026todayUnassigned$360
114-Meadows at Hyde Park-VisionaryGuttersSep 5, 2026todayUnassigned$205
330-Riverside Estates-Fieldstone HomesGuttersSep 5, 2026todayUnassigned$321
TH 6-Flint Acres-Henry Walker HomesHousewrapSep 5, 2026todayUnassigned2026-08-18$667
103-Legends Crossing-VisionaryPaper/WireSep 5, 2026todayUnassigned2026-09-03$50
SF 7-Flint Acres-Henry Walker HomesRockSep 5, 2026todayUnassigned$2,194
SF 7-Flint Acres-Henry Walker HomesScratch CoatSep 5, 2026todayUnassigned$331
505-Legacy Park-IvoryScratch CoatSep 5, 2026todayUnassigned$182✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
227-Bristol Farms-Regal HomesShuttersSep 5, 2026todayUnassigned$50
SF 7-Flint Acres-Henry Walker HomesSidingSep 5, 2026todayUnassigned2026-08-20$3,966
12-Mountainside Estates-DR HortonStucco ColorSep 5, 2026todayUnassigned2026-09-07$1,034
311-Legacy Park-IvoryWateringSep 5, 2026todayUnassigned$67
11-Mountainside Estates-DR HortonStucco ColorSep 6, 2026in 1dUnassigned2026-09-07$1,115
2-Brynlee Acres-HamletPaintSep 7, 2026in 2dUnassigned$284
2-Brynlee Acres-HamletRockSep 7, 2026in 2dUnassigned$1,609
17-Sunset Ridges-Sierra HomesSidingSep 7, 2026in 2dUnassigned2026-07-30$261✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
17-Sunset Ridges-Sierra HomesSoffit/FasciaSep 7, 2026in 2dUnassigned$650✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
17-Sunset Ridges-Sierra HomesVinylSep 7, 2026in 2dUnassigned$1,819✅ 2026-07-01: 17 Days - The it’s still don’t finished - Jose 2026-07-24
126-Palomino-DR HortonStucco ColorSep 8, 2026in 3dUnassigned2026-09-04$1,570
2-Brynlee Acres-HamletStucco ColorSep 8, 2026in 3dUnassigned2026-09-09$692
125-Palomino-DR HortonStucco ColorSep 8, 2026in 3dUnassigned2026-09-04$1,066
1709-Cranefield Estates-IvoryStucco ColorSep 9, 2026in 4dUnassigned$790
336-Sugar Creek-VisionaryStucco ColorSep 9, 2026in 4dUnassigned$995✅ 2026-08-22: Material Delay - We still missing the initial order - Jose 2026-08-26
311-Legacy Park-IvoryStucco ColorSep 9, 2026in 4dUnassigned2026-09-09$855
505-Legacy Park-IvoryStucco ColorSep 9, 2026in 4dUnassigned$868✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
Salt Lake — 37 tasks ready for assignment · 10 overdue · $32,548
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Units 440-445-Legacy at Sky Ranch-WoodsideStucco ColorSep 1, 20264d overdueUnassigned2026-09-04$1,754
1004-Northstar Ranch-Destination HomesHousewrapSep 2, 20263d overdueUnassigned2026-09-07$217
1005-Northstar Ranch-Destination HomesSoffit/FasciaSep 3, 20262d overdueUnassigned$587✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18
441-Daybreak Cottage Courts-Destination HomesPaper/WireSep 4, 20261d overdueUnassigned2026-09-07$825
Bldg 201-Mountain Ridge-EdgeRockSep 4, 20261d overdueUnassigned$1,868
Bldg 202-Mountain Ridge-EdgeRockSep 4, 20261d overdueUnassigned$1,742
2902-Mountain Ridge-EdgeRockSep 4, 20261d overdueUnassigned$542
Bldg 201-Mountain Ridge-EdgeScratch CoatSep 4, 20261d overdueUnassigned$282
2902-Mountain Ridge-EdgeScratch CoatSep 4, 20261d overdueUnassigned$78
Bldg 201-Mountain Ridge-EdgeStucco BrownSep 4, 20261d overdueUnassigned2026-08-27$2,107
1005-Northstar Ranch-Destination HomesGuttersSep 5, 2026todayUnassigned$319✅ 2026-08-17: 4 Days - Need to wait for gas to set up scaff - Alexander 2026-08-21 ✅ 2026-08-14: 2 Days - No available scaffolding waiting for scaffolding - Alexander 2026-08-18
442-Daybreak Cottage Courts-Destination HomesStucco ColorSep 5, 2026todayUnassigned2026-09-02$674
Bldg 20-Solari-EdgeStucco ColorSep 5, 2026todayUnassigned$2,876✅ 2026-08-19: 4 Days - Delayed for drywall windows and gas line - Dustin 2026-08-25
2912-Mountain Ridge-EdgeSet ScaffSep 8, 2026in 3dUnassigned2026-09-04$759
328-Pagoda Grove-McArthurStucco ColorSep 8, 2026in 3dUnassigned$925
23-Sky Ranch Cascade-WoodsideStucco ColorSep 8, 2026in 3dUnassigned2026-09-08$1,061
Bldg 21-Solari-EdgeSet ScaffSep 9, 2026in 4dUnassigned$1,778
Bldg 9-Taylor Villas-EdgeStucco ColorSep 9, 2026in 4dUnassigned$1,948✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
Bldg 22-Solari-EdgeSet ScaffSep 10, 2026in 5dUnassigned$1,543
Bldg 211-Mountain Ridge-EdgeInsl AtticSep 14, 2026in 9dUnassigned$144
Bldg 18-Solari-EdgeInsl Foam 1Sep 15, 2026in 10dUnassigned$116
Bldg 19-Solari-EdgeInsl Foam 1Sep 15, 2026in 10dUnassigned$116
Bldg 18-Solari-EdgeInsl WallsSep 15, 2026in 10dUnassigned$1,517
Bldg 19-Solari-EdgeInsl WallsSep 15, 2026in 10dUnassigned$1,517
2929-Mountain Ridge-EdgeSet ScaffSep 15, 2026in 10dUnassigned$577
2916-Mountain Ridge-EdgeSet ScaffSep 17, 2026in 12dUnassigned$752
Bldg 18-Solari-EdgeSet ScaffSep 18, 2026in 13dUnassigned$1,570
Bldg 19-Solari-EdgeSet ScaffSep 18, 2026in 13dUnassigned$1,570
Bldg 203-Mountain Ridge-EdgeSet ScaffSep 22, 2026in 17dUnassigned$1,474
Bldg 22-Mt. Rainier-EdgeInsl AtticSep 23, 2026in 18dUnassigned$159✅ 2026-08-12: 3 Days - Don’t start stucco brown until drywall windows are installed correctly - Arturo 2026-08-17
Bldg 9-Taylor Villas-EdgeInsl AtticSep 29, 2026in 24dUnassigned$179✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
Bldg 1-Solari-EdgeInsl AtticOct 1, 2026in 26dUnassigned$143✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 39dUnassigned$144
Bldg 202-Mountain Ridge-EdgeInsl AtticOct 20, 2026in 45dUnassigned$143
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 51dUnassigned$160
Bldg 18-Solari-EdgeInsl AtticNov 3, 2026in 59dUnassigned$192
Bldg 19-Solari-EdgeInsl AtticNov 3, 2026in 59dUnassigned$192
Commercial — 10 tasks ready for assignment · 10 overdue · $19,595
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202651d overdueUnassigned$1,811
Bldg D-Residence at Millcreek-RimrockRemove ScaffAug 6, 202630d overdueUnassigned$7,542
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202621d overdueUnassigned$0
Bldg C-Residence at Millcreek-RimrockPaintAug 24, 202612d overdueUnassigned$1,838
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 20269d overdueUnassigned2026-08-27$57
Bldg RU-1-ARA Southwest-Campbell ConstructionEIFS Weather BarrierSep 1, 20264d overdueUnassigned$1,843
206-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 20264d overdueUnassigned2026-09-03$50
205-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 20264d overdueUnassigned2026-09-03$50
203-Fort Pierce-Dawson DevelopmentPaper/WireSep 1, 20264d overdueUnassigned2026-09-03$50
Bldg C-Residence at Millcreek-RimrockStucco ColorSep 2, 20263d overdueUnassigned$6,354
St. George — 10 tasks ready for assignment · 0 overdue · $17,088
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
4290-Long Valley-DR HortonPaintSep 5, 2026todayUnassigned$433
4164-Long Valley Rambler-DR HortonStucco ColorSep 5, 2026todayUnassigned2026-09-04$1,006
4272-Long Valley-DR HortonStucco ColorSep 6, 2026in 1dUnassigned2026-09-04$1,711
4290-Long Valley-DR HortonStucco ColorSep 7, 2026in 2dUnassigned2026-09-08$2,327
35-Legacy at Sand Hollow-VisionaryStucco ColorSep 7, 2026in 2dUnassigned$2,523
4305-Long Valley-DR HortonStucco ColorSep 7, 2026in 2dUnassigned2026-09-04$1,806✅ 2026-08-21: 6 Days - Cannot finish lath. Missing window - Daniel 2026-08-31
16-Desert Cove-RichmondStucco ColorSep 8, 2026in 3dUnassigned2026-09-04$1,887
4202-Long Valley-DR HortonStucco ColorSep 8, 2026in 3dUnassigned$2,016
76-Divario-VisionaryStucco ColorSep 8, 2026in 3dUnassigned$2,195
4156-Long Valley Rambler-DR HortonStucco ColorSep 9, 2026in 4dUnassigned$1,183
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202619d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):