Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 14, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 3, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 14, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 14,306 task records pulled, 220 matched the filter · assignment dates Jul 16, 2026 to Nov 3, 2026

220
Ready for assignment
127
Past assignment date
6
Divisions affected
$231,207
Unassigned task pay
60d
Oldest overdue

Ready tasks by division

022446587Orem8737 odOgden7757 odSalt Lake309 odSt. George1614 odCommercial99 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Orem·
Ogden·
Salt Lake··
St. George···
Commercial···
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 28 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl Foam 1Insl WallsPenetration SealingPorch OSBWindow Pre WrapSet ScaffHousewrapSet Brick ScaffSpecial CorbelsPaper/WireEIFS Weather BarrierStucco BrownScratch CoatPaintSidingRockBrickVinylSoffit/FasciaBrown & MeshGuttersRemove ScaffShuttersStucco ColorScaff PickupMisc. WorkInsl AtticFoundation PlasterTotal
Orem············
Ogden··········
Salt Lake·····················
St. George····················
Commercial····················
Corporate···························
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 133 of 220 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionScaffoldingStucco ColorSidingRockGuttersSoffitInsulationPaintPaper/WireStucco BrownHousewrapBrickField OpsWarrantyAny tradeTotal
Orem·····
Ogden··
Salt Lake········
St. George·········
Commercial········
Corporate··············
All divisions·

Crews with a hand up — available to that division

DivisionScaffoldingStucco ColorSidingRockGuttersSoffitInsulationPaintPaper/WireStucco BrownHousewrapBrickField OpsWarrantyAny tradeTotal
Orem······
Ogden··········
Salt Lake···········
St. George···········
Commercial················
Corporate················
All divisions·····

38 crews company-wide have a hand up, counted once per division they cover (45 crew-division slots, of which 7 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Orem — 87 tasks ready for assignment · 37 overdue · $68,579
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
47-Lakeview Fields-Keystone ConstructionMisc. WorkAug 25, 202620d overdueUnassigned$60Gutter was damaged during scaffolding removal and needs to be replaced.
2014-Wildflower-Toll BrothersFoundation PlasterAug 27, 202618d overdueUnassigned$450⭕ 2026-08-21: Plaster delay - we cannot install plaster til concrete is poured - Jonathan Est End: 2026-09-11 ✅ 2026-08-04: 2 Days - Brown coat delay - need to do some fixing on l
106-Canyon Park-Tri Pointe HomesPaper/WireAug 29, 202616d overdueUnassigned2026-09-03$117⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-14 ✅ 2026-08-20:
130-Montreux-DR HortonSoffit/FasciaSep 1, 202613d overdueUnassigned$608✅ 2026-08-28: Material Delay - Missing all the siding - Alex 2026-09-03
102-Canton Ridge-RichmondSpecial CorbelsSep 1, 202613d overdueUnassigned$50
143-Montreux-DR HortonRockSep 2, 202612d overdueUnassigned2026-08-27$706⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - Alex Est End: 2026-09-14 ✅ 2026-09-01: Material Delay - Waiting for siding to be delivered -
143-Montreux-DR HortonScratch CoatSep 2, 202612d overdueUnassigned$83⭕ 2026-08-27: Backside porch is missing concrete pad and columns to be fully wrapped - Alex Est End: 2026-09-14 ✅ 2026-09-01: Material Delay - Waiting for siding to be delivered -
16122-Harmony-Meritage HomesSoffit/FasciaSep 4, 202610d overdueUnassigned$438
2021-Wildflower-Toll BrothersRockSep 5, 20269d overdueUnassigned$1,893⭕ 2026-09-04: Stone delay - material still not delivered - Jonathan Est End: 2026-09-14 ✅ 2026-09-02: 7 Days - Brown delay - missing drywall window - good to proceed on scratch -
1027-Harmony Ridge-EdgeRockSep 5, 20269d overdueUnassigned2026-09-08$187
2021-Wildflower-Toll BrothersStucco BrownSep 5, 20269d overdueUnassigned$129⭕ 2026-09-04: Stone delay - material still not delivered - Jonathan Est End: 2026-09-14 ✅ 2026-09-02: 7 Days - Brown delay - missing drywall window - good to proceed on scratch -
Wellspring Park Restroom-Viridian Townhomes-DR HortonSet ScaffSep 7, 20267d overdueUnassigned$15
254-Canton Ridge-RichmondBrickSep 9, 20265d overdueUnassigned2026-09-09$1,441
102-Canton Ridge-RichmondRockSep 9, 20265d overdueUnassigned2026-09-01$1,094
135-Auburn Springs-EdgeRockSep 9, 20265d overdueUnassigned2026-09-04$1,036✅ 2026-09-08: 3 Days - Columns are twisted - Harrison 2026-09-11
135-Auburn Springs-EdgeScratch CoatSep 9, 20265d overdueUnassigned$150✅ 2026-09-08: 3 Days - Columns are twisted - Harrison 2026-09-11
234-Viridian Plus-DR HortonSet ScaffSep 9, 20265d overdueUnassigned$763
340-Viridian-DR HortonSet ScaffSep 9, 20265d overdueUnassigned$606
254-Canton Ridge-RichmondSidingSep 9, 20265d overdueUnassigned2026-09-11$1,523
16121-Harmony-Meritage HomesSoffit/FasciaSep 9, 20265d overdueUnassigned$452
Roundabout Wall Phase 4-Viridian Townhomes-DR HortonPaper/WireSep 10, 20264d overdueUnassigned$260
110-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 20264d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-14
109-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 20264d overdueUnassigned2026-09-02$117⭕ 2026-09-11: Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex Est End: 2026-09-16
814-Broadview Shores-IvorySidingSep 10, 20264d overdueUnassigned2026-09-10$3,491✅ 2026-09-09: 2 Days - Failed inspection, hold on scratch coat. - Manuel 2026-09-11
26-Tanner Flats-IvoryStucco BrownSep 10, 20264d overdueUnassigned$1,136⭕ 2026-09-09: Hold on siding good for stucco brown - Jorge Est End: 2026-09-14
25-Lakeview Fields-Keystone ConstructionBrickSep 11, 20263d overdueUnassigned2026-08-28$644
519-Ridgeview Cottages-IvoryPaper/WireSep 11, 20263d overdueUnassigned2026-09-10$940⭕ 2026-09-11: Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison Est End: 2026-09-15
45-Tanner Flats-IvoryRemove ScaffSep 11, 20263d overdueUnassigned$386
25-Lakeview Fields-Keystone ConstructionScratch CoatSep 11, 20263d overdueUnassigned$67
16119-Harmony-Meritage HomesSoffit/FasciaSep 11, 20263d overdueUnassigned$418
725-Highridge-EdgeRemove ScaffSep 12, 20262d overdueUnassigned$426
Bldg 58-Harmony Ridge-EdgeRockSep 12, 20262d overdueUnassigned2026-09-01$2,077
16120-Harmony-Meritage HomesSidingSep 12, 20262d overdueUnassigned2026-09-02$3,821
16120-Harmony-Meritage HomesSoffit/FasciaSep 12, 20262d overdueUnassigned$415
16122-Harmony-Meritage HomesStucco BrownSep 12, 20262d overdueUnassigned$160
346-Mountain Vista at Sunset Flats-Pulte HomesSoffit/FasciaSep 13, 20261d overdueUnassigned$703✅ 2026-08-31: 6 Days - We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor 2026-09-08
434-Viridian-DR HortonStucco ColorSep 13, 20261d overdueUnassigned$1,212✅
314-Viridian-DR HortonSet ScaffSep 14, 2026todayUnassigned$627
2227-Wildflower-EdgeSet ScaffSep 14, 2026todayUnassigned$758
420-Viridian-DR HortonSet ScaffSep 14, 2026todayUnassigned$681
711-Ridgehorne-EdgeSet ScaffSep 14, 2026todayUnassigned$747
1021-Harmony Ridge-EdgeSet ScaffSep 14, 2026todayUnassigned$786
718-Highridge-EdgeSet ScaffSep 14, 2026todayUnassigned$831
Units 975-979-Anderson Farms Townhomes-IvoryStucco ColorSep 14, 2026todayUnassigned$1,760
254-Canton Ridge-RichmondStucco ColorSep 14, 2026todayUnassigned$1,165
102-Canton Ridge-RichmondStucco ColorSep 14, 2026todayUnassigned$1,045
109-Vista at Harmony Place-WoodsideStucco ColorSep 14, 2026todayUnassigned$802
717-Highridge-EdgeStucco ColorSep 14, 2026todayUnassigned$960
Bldg 56-Harmony Ridge-EdgeSet ScaffSep 15, 2026in 1dUnassigned$1,906
115-Auburn Springs-EdgeSet ScaffSep 15, 2026in 1dUnassigned$780
108-Auburn Springs-EdgeSet ScaffSep 15, 2026in 1dUnassigned$930
339-Viridian-DR HortonSet ScaffSep 16, 2026in 2dUnassigned$574
16118-Harmony-Meritage HomesStucco ColorSep 16, 2026in 2dUnassigned$134
726-Highridge-EdgeStucco ColorSep 16, 2026in 2dUnassigned2026-09-11$1,467
Bldg 37-Highridge-EdgeInsl Foam 1Sep 17, 2026in 3dUnassigned$115
Bldg 37-Highridge-EdgeInsl WallsSep 17, 2026in 3dUnassigned$912
523-River Point-EdgeSet ScaffSep 17, 2026in 3dUnassigned$745
147-Auburn Springs-EdgeSet ScaffSep 17, 2026in 3dUnassigned$723
711-Highridge-EdgeSet ScaffSep 17, 2026in 3dUnassigned$561
16119-Harmony-Meritage HomesStucco ColorSep 17, 2026in 3dUnassigned$118
16121-Harmony-Meritage HomesStucco ColorSep 17, 2026in 3dUnassigned$148
26-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 2026in 3dUnassigned$1,341✅ 2026-08-10: 14 Days - Missing man door, can’t start lath - Alex 2026-08-28
25-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 2026in 3dUnassigned$1,294
2212-Wildflower-EdgeSet ScaffSep 18, 2026in 4dUnassigned$660
133-Auburn Springs-EdgeSet ScaffSep 18, 2026in 4dUnassigned$991
246-Viridian Plus-DR HortonSet ScaffSep 18, 2026in 4dUnassigned$784
2228-Wildflower-EdgeSet ScaffSep 18, 2026in 4dUnassigned$807
Bldg 37-Highridge-EdgeSet ScaffSep 18, 2026in 4dUnassigned$1,104
16120-Harmony-Meritage HomesStucco ColorSep 18, 2026in 4dUnassigned$134
Bldg 39-Highridge-EdgeStucco ColorSep 18, 2026in 4dUnassigned$1,302
346-Mountain Vista at Sunset Flats-Pulte HomesStucco ColorSep 18, 2026in 4dUnassigned$1,370✅ 2026-08-31: 6 Days - We need to wait to lath we need to pass Housewrap inspections before we can lath thanks ?? - Victor 2026-09-08
405-Viridian-DR HortonSet ScaffSep 21, 2026in 7dUnassigned$771
518-River Point-EdgeSet ScaffSep 21, 2026in 7dUnassigned$583
525-River Point-EdgeSet ScaffSep 21, 2026in 7dUnassigned$671
1030-Harmony Ridge-EdgeSet ScaffSep 21, 2026in 7dUnassigned$756
721-Ridgehorne-EdgeSet ScaffSep 22, 2026in 8dUnassigned$530
1031-Harmony Ridge-EdgeSet ScaffSep 23, 2026in 9dUnassigned$712
519-River Point-EdgeSet ScaffSep 23, 2026in 9dUnassigned$693
1008-Harmony Ridge-EdgeSet ScaffSep 24, 2026in 10dUnassigned$759
732-Ridgehorne-EdgeSet ScaffSep 24, 2026in 10dUnassigned$661
710-Highridge-EdgeSet ScaffSep 25, 2026in 11dUnassigned$671
719-Highridge-EdgeSet ScaffSep 28, 2026in 14dUnassigned$614
Bldg 36-Highridge-EdgeSet ScaffSep 28, 2026in 14dUnassigned$1,104
Bldg 38-Highridge-EdgeSet ScaffSep 28, 2026in 14dUnassigned$1,104
Bldg 59-Harmony Ridge-EdgeSet ScaffSep 29, 2026in 15dUnassigned$1,480
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 25dUnassigned$80
Bldg 37-Highridge-EdgeInsl AtticNov 3, 2026in 50dUnassigned$80
Ogden — 77 tasks ready for assignment · 57 overdue · $69,678
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
108-Red Hill-IvorySet Brick ScaffAug 12, 202633d overdueUnassigned$40
206-Fremont Meadows-Sterling HomesScratch CoatAug 13, 202632d overdueUnassigned$50
71-Brookfield-LennarGuttersAug 24, 202621d overdueUnassigned$167
63-Brookfield-LennarGuttersAug 24, 202621d overdueUnassigned$236
106-Red Hill-IvorySet Brick ScaffAug 24, 202621d overdueUnassigned$0
108-Red Hill-IvoryScratch CoatAug 25, 202620d overdueUnassigned$50
Bldg 6-Midtown Village-DR HortonSet Brick ScaffAug 26, 202619d overdueUnassigned$0⭕ 2026-09-08: not ready for lathe is missing the metal cap - George Est End: 2026-09-16
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 202619d overdueUnassigned$134
176-Mountain Gate-Sierra HomesSidingAug 27, 202618d overdueUnassigned2026-09-11$50
106-Red Hill-IvoryBrickAug 28, 202617d overdueUnassigned2026-08-26$50
Bldg 2-Railrunner-DAI ConstructionSidingAug 28, 202617d overdueUnassigned2026-08-26$782✅ 2026-07-09: 21 Days - The superintendent said he was ready but I check the building and it’s not ready 100% still has a lot the superintendent apologized for this - George 2026-0
Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction GroupRockAug 31, 202614d overdueUnassigned2026-08-26$635⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-15
102-Meadows at Hyde Park-VisionarySidingAug 31, 202614d overdueUnassigned$1,261
338-Sugar Creek-VisionarySidingSep 1, 202613d overdueUnassigned$489
4-Heritage Parkway-Sierra HomesRemove ScaffSep 2, 202612d overdueUnassigned$13✅ 2026-07-29: 4 Days - We still don’t have vinyl material - Jose 2026-08-04
603-Vineyard-VisionaryScratch CoatSep 2, 202612d overdueUnassigned$74
102-Village at Fox Meadows-VisionarySidingSep 3, 202611d overdueUnassigned2026-09-04$1,217✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
SF 7-Flint Acres-Henry Walker HomesScratch CoatSep 5, 20269d overdueUnassigned$331
227-Bristol Farms-Regal HomesShuttersSep 5, 20269d overdueUnassigned2026-09-05$50
2-Brynlee Acres-HamletStucco ColorSep 8, 20266d overdueUnassigned$692
176-Mountain Gate-Sierra HomesVinylSep 8, 20266d overdueUnassigned2026-09-11$671
11-Heritage Parkway-Sierra HomesPaintSep 9, 20265d overdueUnassigned$580✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
821-Ridgeline Park-VisionaryRockSep 9, 20265d overdueUnassigned2026-09-01$483
339-Sugar Creek-VisionarySidingSep 9, 20265d overdueUnassigned$364
Bldg L-Sugar Creek Townhomes-VisionarySidingSep 9, 20265d overdueUnassigned2026-08-10$6,419
Bldg 2-Railrunner-DAI ConstructionVinylSep 9, 20265d overdueUnassigned$9,494✅ 2026-07-09: 21 Days - The superintendent said he was ready but I check the building and it’s not ready 100% still has a lot the superintendent apologized for this - George 2026-0
116-Meadows at Hyde Park-VisionaryBrown & MeshSep 10, 20264d overdueUnassigned$1,000
102-Legends Crossing-VisionaryPaintSep 10, 20264d overdueUnassigned$102
9-Crested Peaks-IvoryRockSep 10, 20264d overdueUnassigned2026-08-26$4,768
116-Meadows at Hyde Park-VisionaryScratch CoatSep 10, 20264d overdueUnassigned$121
9-Crested Peaks-IvoryScratch CoatSep 10, 20264d overdueUnassigned$646
126-Red Hill-IvorySet ScaffSep 10, 20264d overdueUnassigned$36
515-Vineyard-VisionarySidingSep 10, 20264d overdueUnassigned$4,879
503-Vineyard-VisionarySidingSep 10, 20264d overdueUnassigned$1,338
4-Brynlee Acres-HamletSidingSep 10, 20264d overdueUnassigned2026-08-26$888
107-Red Hill-IvorySoffit/FasciaSep 10, 20264d overdueUnassigned$554
108-Red Hill-IvorySoffit/FasciaSep 10, 20264d overdueUnassigned$553
102-Meadows at Hyde Park-VisionaryBrickSep 11, 20263d overdueUnassigned$736
102-Meadows at Hyde Park-VisionaryBrown & MeshSep 11, 20263d overdueUnassigned$1,390
330-Riverside Estates-Fieldstone HomesGuttersSep 11, 20263d overdueUnassigned$321
SF 7-Flint Acres-Henry Walker HomesPaintSep 11, 20263d overdueUnassigned$1,430
2-Brynlee Acres-HamletPaintSep 11, 20263d overdueUnassigned$284
609-Village at Fox Meadows-VisionaryPaintSep 11, 20263d overdueUnassigned$583
Bldg G-Legends Crossing Townhomes-VisionaryPaintSep 11, 20263d overdueUnassigned$187
6-Heritage Parkway-Sierra HomesRemove ScaffSep 11, 20263d overdueUnassigned$9
108-Stagecoach Estates-McArthurRockSep 11, 20263d overdueUnassigned$906
501-Legacy Park-IvoryScaff PickupSep 11, 20263d overdueUnassigned$0Trailer ready for pick up
108-Stagecoach Estates-McArthurScratch CoatSep 11, 20263d overdueUnassigned$107
102-Meadows at Hyde Park-VisionaryScratch CoatSep 11, 20263d overdueUnassigned$77
609-Village at Fox Meadows-VisionaryScratch CoatSep 11, 20263d overdueUnassigned$50
Units 47-52-Hess Farms-David Weekley HomesSet ScaffSep 11, 20263d overdueUnassigned$2,216⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-18
108-Stagecoach Estates-McArthurSidingSep 11, 20263d overdueUnassigned2026-09-11$369
Units 14-19-River Valley-Sierra HomesGuttersSep 12, 20262d overdueUnassigned$470
115-Meadows at Hyde Park-VisionaryPaintSep 12, 20262d overdueUnassigned$726
Units 35-40-Hess Farms-David Weekley HomesRockSep 12, 20262d overdueUnassigned$9,797✅ 2026-09-03: Scaff Delay - Due to drywall delivery Scafold will not be available for use. - Erik 2026-09-08 ✅ 2026-08-24: 5 Days - Waiting for wrap inspection to get lath and wir
106-Red Hill-IvorySoffit/FasciaSep 12, 20262d overdueUnassigned$606
SF 6-Flint Acres-Henry Walker HomesSoffit/FasciaSep 13, 20261d overdueUnassigned$537
253-Westwood Estates-Meritage HomesGuttersSep 14, 2026todayUnassigned$464
254-Westwood Estates-Meritage HomesGuttersSep 14, 2026todayUnassigned$287
Bldg U-Village at Fox Meadows Townhomes-VisionaryGuttersSep 14, 2026todayUnassigned$1,001
3-Brynlee Acres-HamletGuttersSep 14, 2026todayUnassigned$248
SF 6-Flint Acres-Henry Walker HomesGuttersSep 14, 2026todayUnassigned$410
12-Mountainside Estates-DR HortonGuttersSep 14, 2026todayUnassigned$262
115-Three Farms Jenkins Fields-IvoryGuttersSep 14, 2026todayUnassigned$162
1708-Cranefield Estates-IvoryGuttersSep 14, 2026todayUnassigned$266
227-Bristol Farms-Regal HomesGuttersSep 14, 2026todayUnassigned$406
229-Bristol Farms-Regal HomesGuttersSep 14, 2026todayUnassigned$252
126-Red Hill-IvoryHousewrapSep 14, 2026todayUnassigned$473
505-Legacy Park-IvoryPaintSep 14, 2026todayUnassigned2026-09-07$332✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
126-Red Hill-IvoryPaper/WireSep 14, 2026todayUnassigned$76
609-Village at Fox Meadows-VisionaryStucco ColorSep 14, 2026todayUnassigned$786
821-Ridgeline Park-VisionaryStucco ColorSep 14, 2026todayUnassigned$452
115-Meadows at Hyde Park-VisionaryStucco ColorSep 14, 2026todayUnassigned$867
Units 41-46-Hess Farms-David Weekley HomesFoundation PlasterSep 15, 2026in 1dUnassigned$450✅ 2026-08-04: Scaff Delay - Building is not ready for Scafold. - Erik 2026-08-07
4-Brynlee Acres-HamletStucco ColorSep 15, 2026in 1dUnassigned$806
1523-Cranefield Estates-IvoryStucco ColorSep 15, 2026in 1dUnassigned$520
603-Vineyard-VisionaryStucco ColorSep 17, 2026in 3dUnassigned2026-09-08$1,139
Salt Lake — 30 tasks ready for assignment · 9 overdue · $30,356
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
1004-Northstar Ranch-Destination HomesSidingSep 11, 20263d overdueUnassigned$1,265⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11
1037-Northstar Ranch-Destination HomesSidingSep 11, 20263d overdueUnassigned$1,921⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
1004-Northstar Ranch-Destination HomesSoffit/FasciaSep 11, 20263d overdueUnassigned$597⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11
1037-Northstar Ranch-Destination HomesSoffit/FasciaSep 11, 20263d overdueUnassigned$686⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
1004-Northstar Ranch-Destination HomesStucco BrownSep 11, 20263d overdueUnassigned$1,157⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11
1037-Northstar Ranch-Destination HomesStucco BrownSep 11, 20263d overdueUnassigned2026-08-27$1,134⭕ 2026-09-09: Delayed for scaff taken down for gas line. - Dustin Est End: 2026-09-11 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
104-Pierson Farms-McArthurRockSep 12, 20262d overdueUnassigned2026-09-08$1,371
Bldg 201-Mountain Ridge-EdgeStucco ColorSep 12, 20262d overdueUnassigned$1,854
Bldg 202-Mountain Ridge-EdgeStucco ColorSep 12, 20262d overdueUnassigned$1,620
Units 49-53-Holladay Hills Townhomes-Tri Pointe HomesSoffit/FasciaSep 14, 2026todayUnassigned$1,141
153-Pierson Farms-McArthurStucco ColorSep 14, 2026todayUnassigned$1,069
2929-Mountain Ridge-EdgeSet ScaffSep 15, 2026in 1dUnassigned$577
Units 508-509-Daybreak Duets-Destination HomesStucco ColorSep 15, 2026in 1dUnassigned$1,941
111-Creek Ridge Cove-RichmondStucco ColorSep 15, 2026in 1dUnassigned$1,251✅ 2026-08-28: 3 Days - Can’t finish lath and housewrap until back sliding door gets installed - Arturo 2026-09-02
Units 539-540-Daybreak Lexington Townhomes-Destination HomesStucco ColorSep 16, 2026in 2dUnassigned$1,571✅ 2026-08-25: 3 Days - Housewrap and paper and wire delay. Missing drywall windows and sheeting on beam - Facundo 2026-08-28
106-Pierson Farms-McArthurStucco ColorSep 16, 2026in 2dUnassigned$942
2916-Mountain Ridge-EdgeSet ScaffSep 17, 2026in 3dUnassigned$756
Bldg 208-Mountain Ridge-EdgeStucco ColorSep 17, 2026in 3dUnassigned$1,010
Bldg 18-Solari-EdgeSet ScaffSep 18, 2026in 4dUnassigned$1,570
Bldg 19-Solari-EdgeSet ScaffSep 18, 2026in 4dUnassigned$1,570
Bldg 203-Mountain Ridge-EdgeSet ScaffSep 22, 2026in 8dUnassigned$1,474
2931-Mountain Ridge-EdgeSet ScaffSep 22, 2026in 8dUnassigned$712
Bldg 204-Mountain Ridge-EdgeSet ScaffSep 24, 2026in 10dUnassigned$1,501
2927-Mountain Ridge-EdgeSet ScaffSep 25, 2026in 11dUnassigned$708
Bldg 9-Taylor Villas-EdgeInsl AtticSep 29, 2026in 15dUnassigned$179✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
Bldg 1-Solari-EdgeInsl AtticOct 1, 2026in 17dUnassigned$143✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 30dUnassigned$144
Bldg 202-Mountain Ridge-EdgeInsl AtticOct 20, 2026in 36dUnassigned$143
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 42dUnassigned$160
Bldg 19-Solari-EdgeInsl AtticNov 3, 2026in 50dUnassigned$192
St. George — 16 tasks ready for assignment · 14 overdue · $23,023
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
4156-Long Valley Rambler-DR HortonStucco ColorSep 9, 20265d overdueUnassigned$1,303
52-Zion Shores-Split RockRockSep 10, 20264d overdueUnassigned$7,062
7-Chelsey-DR HortonSet ScaffSep 10, 20264d overdueUnassigned$557
37-Legacy at Sand Hollow-VisionaryWindow Pre WrapSep 10, 20264d overdueUnassigned$100
33-Legacy at Sand Hollow-VisionaryWindow Pre WrapSep 10, 20264d overdueUnassigned$100
37-Legacy at Sand Hollow-VisionaryHousewrapSep 11, 20263d overdueUnassigned$181
4294-Long Valley-DR HortonHousewrapSep 11, 20263d overdueUnassigned$151
33-Legacy at Sand Hollow-VisionaryHousewrapSep 11, 20263d overdueUnassigned$50
4294-Long Valley-DR HortonPaper/WireSep 11, 20263d overdueUnassigned$2,431
4294-Long Valley-DR HortonPorch OSBSep 11, 20263d overdueUnassigned$168
4271-Long Valley-DR HortonPaintSep 12, 20262d overdueUnassigned$50
32-Legacy at Sand Hollow-VisionaryStucco ColorSep 12, 20262d overdueUnassigned$2,126
323-Finley Farms-RichmondStucco ColorSep 13, 20261d overdueUnassigned$3,068
104-La Spazio-LennarStucco ColorSep 13, 20261d overdueUnassigned2026-09-08$2,146
105-La Spazio-LennarStucco ColorSep 14, 2026todayUnassigned$1,763
4271-Long Valley-DR HortonStucco ColorSep 19, 2026in 5dUnassigned$1,766
Commercial — 9 tasks ready for assignment · 9 overdue · $39,571
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202660d overdueUnassigned$1,811
Bldg D-Residence at Millcreek-RimrockRemove ScaffAug 6, 202639d overdueUnassigned$7,542
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202630d overdueUnassigned$0
Bldg C-Residence at Millcreek-RimrockPaintAug 24, 202621d overdueUnassigned$1,838
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 202618d overdueUnassigned$57
Bldg RU-1-ARA Southwest-Campbell ConstructionEIFS Weather BarrierSep 1, 202613d overdueUnassigned$1,843
Bldg D-Residence at Millcreek-RimrockRockSep 9, 20265d overdueUnassigned$15,588
Bldg D-Residence at Millcreek-RimrockScratch CoatSep 9, 20265d overdueUnassigned$2,008
Bldg D-Residence at Millcreek-RimrockStucco BrownSep 9, 20265d overdueUnassigned$8,885
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202628d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 292 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: