Every division. Tasks with an assignment date set but no team assigned and not yet completed.
Generated Sep 20, 2026 · Go to the current version →
This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.
● All 6 divisions, not just yours — the
division scoping is removed.
● No 7-day cap. The division view only shows assignments due
inside a week; this carries the whole book — the overdue tail reaching back to
Jul 16, 2026 and forward assignments out to Nov 18, 2026.
● Delayed assignments are not excluded. The division view drops
tasks flagged Task Assignment Is Delayed; that field is not available to this
report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to
active jobs, so an unassigned task on a finaled job shows in your division view and
not here — the one direction where your view is larger than this
report.
Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.
Generated Sep 20, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,892 task records pulled, 180 matched the filter · assignment dates Jul 16, 2026 to Nov 18, 2026
past assignment date due today or upcoming
Click any number to see the tasks behind it. Esc closes.
| Division | Overdue 30+ days | Overdue 8-30 days | Overdue 1-7 days | Due today | Next 7 days | Beyond 7 days | Total |
|---|---|---|---|---|---|---|---|
| Ogden | · | · | |||||
| Orem | · | ||||||
| Salt Lake | · | ||||||
| St. George | · | · | |||||
| Commercial | · | · | |||||
| Corporate | · | · | · | · | · | ||
| All divisions |
Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 24 task types.
Click any number to see the tasks behind it. Esc closes.
| Division | Insl Walls | Penetration Sealing | Window Pre Wrap | Set Scaff | Housewrap | Set Brick Scaff | Paper/Wire | Stucco Brown | Scratch Coat | Paint | Siding | Watering | Rock | Brick | Soffit/Fascia | Brown & Mesh | Gutters | Remove Scaff | Stucco Corbels | Stucco Color | Scaff Pickup | Misc. Work | Insl Attic | Foundation Plaster | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Ogden | · | · | · | · | · | · | · | ||||||||||||||||||
| Orem | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||||||||
| Salt Lake | · | · | · | · | · | · | · | · | · | · | · | ||||||||||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | |||||||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | |||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions |
Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 149 of 180 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.
Click any number to see the tasks — or the crews — behind it. Esc closes.
Tasks needing assignment
| Division | Stucco Color | Scaffolding | Paint | Rock | Gutters | Paper/Wire | Insulation | Housewrap | Soffit | Siding | Brick | Stucco Brown | Field Ops | Warranty | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Ogden | · | · | · | · | ||||||||||||
| Orem | · | · | · | · | · | · | · | · | ||||||||
| Salt Lake | · | · | · | · | ||||||||||||
| St. George | · | · | · | · | · | · | · | · | · | |||||||
| Commercial | · | · | · | · | · | · | · | · | · | · | ||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions | · |
Crews with a hand up — available to that division
| Division | Stucco Color | Scaffolding | Paint | Rock | Gutters | Paper/Wire | Insulation | Housewrap | Soffit | Siding | Brick | Stucco Brown | Field Ops | Warranty | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Ogden | · | · | · | · | · | · | · | · | · | · | · | · | ||||
| Orem | · | · | · | · | · | · | · | · | · | · | ||||||
| Salt Lake | · | · | · | · | · | · | · | · | · | · | ||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | · | ||||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| All divisions | · | · | · | · | · | · |
26 crews company-wide have a hand up, counted once per division they cover (31 crew-division slots, of which 5 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.
Click a division to see the underlying tasks, oldest assignment date first.
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 71-Brookfield-Lennar | Gutters | Aug 24, 2026 | 27d overdue | Unassigned | $167 | ||
| 63-Brookfield-Lennar | Gutters | Aug 24, 2026 | 27d overdue | Unassigned | $236 | ||
| 106-Red Hill-Ivory | Set Brick Scaff | Aug 24, 2026 | 27d overdue | Unassigned | $0 | ||
| Bldg 6-Midtown Village-DR Horton | Set Brick Scaff | Aug 26, 2026 | 25d overdue | Unassigned | $0 | ✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16 | |
| 1523-Cranefield Estates-Ivory | Set Brick Scaff | Aug 26, 2026 | 25d overdue | Unassigned | $134 | ||
| Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction Group | Rock | Aug 31, 2026 | 20d overdue | Unassigned | 2026-08-26 | $635 | ⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-25 |
| 9-Crested Peaks-Ivory | Rock | Sep 10, 2026 | 10d overdue | Unassigned | 2026-08-26 | $4,768 | |
| 9-Crested Peaks-Ivory | Scratch Coat | Sep 10, 2026 | 10d overdue | Unassigned | $646 | ||
| 102-Meadows at Hyde Park-Visionary | Brick | Sep 11, 2026 | 9d overdue | Unassigned | 2026-09-14 | $736 | |
| 501-Legacy Park-Ivory | Scaff Pickup | Sep 11, 2026 | 9d overdue | Unassigned | $0 | Trailer ready for pick up | |
| Units 47-52-Hess Farms-David Weekley Homes | Set Scaff | Sep 11, 2026 | 9d overdue | Unassigned | $1,966 | ⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-23 | |
| 1709-Cranefield Estates-Ivory | Gutters | Sep 15, 2026 | 5d overdue | Unassigned | $216 | ||
| TH 6-Flint Acres-Henry Walker Homes | Brick | Sep 16, 2026 | 4d overdue | Unassigned | $3,737 | ||
| Lot 1-6-River Bend Manor Townhomes-Hamlet | Housewrap | Sep 16, 2026 | 4d overdue | Unassigned | $1,493 | ||
| 108-Stagecoach Estates-McArthur | Paint | Sep 16, 2026 | 4d overdue | Unassigned | 2026-09-12 | $173 | |
| 102-Meadows at Hyde Park-Visionary | Paint | Sep 16, 2026 | 4d overdue | Unassigned | $645 | ||
| 102-Village at Fox Meadows-Visionary | Paint | Sep 16, 2026 | 4d overdue | Unassigned | $583 | ✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03 | |
| 134-Legends Crossing-Visionary | Paper/Wire | Sep 16, 2026 | 4d overdue | Unassigned | 2026-09-14 | $50 | |
| TH 6-Flint Acres-Henry Walker Homes | Scratch Coat | Sep 16, 2026 | 4d overdue | Unassigned | $370 | ||
| Bldg U-Village at Fox Meadows Townhomes-Visionary | Gutters | Sep 17, 2026 | 3d overdue | Unassigned | $1,001 | ||
| 4-Brynlee Acres-Hamlet | Paint | Sep 17, 2026 | 3d overdue | Unassigned | $362 | ||
| 116-Meadows at Hyde Park-Visionary | Paint | Sep 17, 2026 | 3d overdue | Unassigned | $813 | ||
| 521-Vineyard-Visionary | Paint | Sep 17, 2026 | 3d overdue | Unassigned | $377 | ||
| 1710-Cranefield Estates-Ivory | Paper/Wire | Sep 17, 2026 | 3d overdue | Unassigned | 2026-09-14 | $1,244 | |
| Bldg F-Legends Crossing Townhomes-Visionary | Paper/Wire | Sep 17, 2026 | 3d overdue | Unassigned | $116 | ||
| 12-Mountainside Estates-DR Horton | Gutters | Sep 18, 2026 | 2d overdue | Unassigned | $262 | ||
| 54-Cardamine-Sierra Homes | Gutters | Sep 18, 2026 | 2d overdue | Unassigned | $262 | ✅ 2026-07-29: 12 Days - We don’t have vinyl materials - Jose 2026-08-15 | |
| 113-Three Farms Jenkins Fields-Ivory | Housewrap | Sep 18, 2026 | 2d overdue | Unassigned | $839 | ||
| 72-Brookfield-Lennar | Paint | Sep 18, 2026 | 2d overdue | Unassigned | $3,098 | ||
| 107-Stagecoach Estates-McArthur | Paint | Sep 18, 2026 | 2d overdue | Unassigned | $496 | ||
| 62-Brookfield-Lennar | Paint | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-15 | $2,348 | |
| 723-Ridgeline Park-Visionary | Paint | Sep 18, 2026 | 2d overdue | Unassigned | $796 | ⭕ 2026-09-14: the concrete guys was start doing the porch cap and driways also on the east side was working building a wall - Jose Est End: 2026-09-21 ✅ 2026-09-02: -1 Days - Can’ | |
| 124-Taylor Landing-Lennar | Soffit/Fascia | Sep 18, 2026 | 2d overdue | Unassigned | $791 | ✅ 2026-09-09: Material Delay - Lennar needs to get more materials for crews to complete siding. - Erik 2026-09-11 | |
| Bldg 6-Midtown Village-DR Horton | Watering | Sep 18, 2026 | 2d overdue | Unassigned | $146 | ✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16 | |
| 1715-Cranefield Estates-Ivory | Watering | Sep 18, 2026 | 2d overdue | Unassigned | $64 | ||
| 206-Stagecoach Estates-McArthur | Window Pre Wrap | Sep 18, 2026 | 2d overdue | Unassigned | $100 | ||
| 115-Stagecoach Estates-McArthur | Window Pre Wrap | Sep 18, 2026 | 2d overdue | Unassigned | $100 | ||
| 5-Valley Meadows-Dixon Homes | Brick | Sep 19, 2026 | 1d overdue | Unassigned | $13,668 | ||
| 176-Mountain Gate-Sierra Homes | Brown & Mesh | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-15 | $1,815 | |
| 209-Stagecoach Estates-McArthur | Housewrap | Sep 19, 2026 | 1d overdue | Unassigned | $608 | ||
| 339-Sugar Creek-Visionary | Paint | Sep 19, 2026 | 1d overdue | Unassigned | $214 | ||
| Bldg L-Sugar Creek Townhomes-Visionary | Paint | Sep 19, 2026 | 1d overdue | Unassigned | $2,304 | ||
| Units 1-6-VTG-Sierra Homes | Paper/Wire | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-18 | $2,580 | |
| 821-Ridgeline Park-Visionary | Remove Scaff | Sep 19, 2026 | 1d overdue | Unassigned | $149 | ||
| 176-Mountain Gate-Sierra Homes | Rock | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-11 | $1,213 | |
| Bldg Y-North Point Townhomes-Visionary | Rock | Sep 19, 2026 | 1d overdue | Unassigned | 2026-08-26 | $1,716 | |
| 176-Mountain Gate-Sierra Homes | Scratch Coat | Sep 19, 2026 | 1d overdue | Unassigned | $140 | ||
| Bldg Y-North Point Townhomes-Visionary | Scratch Coat | Sep 19, 2026 | 1d overdue | Unassigned | $186 | ||
| 2-Brynlee Acres-Hamlet | Soffit/Fascia | Sep 19, 2026 | 1d overdue | Unassigned | $613 | ||
| 108-Stagecoach Estates-McArthur | Stucco Color | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-18 | $923 | |
| 603-Vineyard-Visionary | Stucco Color | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-08 | $1,139 | |
| 227-Bristol Farms-Regal Homes | Foundation Plaster | Sep 20, 2026 | today | Unassigned | $450 | ||
| SF 7-Flint Acres-Henry Walker Homes | Gutters | Sep 20, 2026 | today | Unassigned | $648 | ||
| 3-Brynlee Acres-Hamlet | Gutters | Sep 20, 2026 | today | Unassigned | $248 | ||
| 2-Brynlee Acres-Hamlet | Gutters | Sep 20, 2026 | today | Unassigned | $301 | ||
| 203-Weber View-Ivory | Gutters | Sep 20, 2026 | today | Unassigned | $376 | ||
| 1523-Cranefield Estates-Ivory | Gutters | Sep 20, 2026 | today | Unassigned | $382 | ||
| 11-Heritage Parkway-Sierra Homes | Gutters | Sep 20, 2026 | today | Unassigned | $236 | ✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07 | |
| 505-Legacy Park-Ivory | Gutters | Sep 20, 2026 | today | Unassigned | $197 | ✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03 | |
| 107-Stagecoach Estates-McArthur | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $803 | ||
| 5-Brynlee Acres-Hamlet | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $830 | ✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02 | |
| 814-Ridgeline Park-Visionary | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $1,183 | ||
| Bldg 6-Midtown Village-DR Horton | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $1,455 | ✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16 | |
| 338-Sugar Creek-Visionary | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $1,028 | ||
| 1715-Cranefield Estates-Ivory | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $809 | ||
| 102-Meadows at Hyde Park-Visionary | Stucco Color | Sep 24, 2026 | in 4d | Unassigned | $978 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 106-Canyon Park-Tri Pointe Homes | Paper/Wire | Aug 29, 2026 | 22d overdue | Unassigned | 2026-09-03 | $117 | ⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-21 ✅ 2026-08-20: |
| 110-Canyon Park-Tri Pointe Homes | Paper/Wire | Sep 10, 2026 | 10d overdue | Unassigned | 2026-09-01 | $173 | ⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25 |
| 109-Canyon Park-Tri Pointe Homes | Paper/Wire | Sep 10, 2026 | 10d overdue | Unassigned | 2026-09-02 | $117 | ⭕ 2026-09-11: Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex Est End: 2026-09-21 |
| 519-Ridgeview Cottages-Ivory | Paper/Wire | Sep 11, 2026 | 9d overdue | Unassigned | 2026-09-14 | $940 | ✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15 |
| 16118-Harmony-Meritage Homes | Soffit/Fascia | Sep 11, 2026 | 9d overdue | Unassigned | $418 | ||
| 718-Highridge-Edge | Set Scaff | Sep 14, 2026 | 6d overdue | Unassigned | $831 | ||
| 16118-Harmony-Meritage Homes | Siding | Sep 14, 2026 | 6d overdue | Unassigned | 2026-09-11 | $3,863 | |
| 339-Viridian-DR Horton | Set Scaff | Sep 16, 2026 | 4d overdue | Unassigned | $574 | ||
| 525-Ridgeview Cottages-Ivory | Siding | Sep 17, 2026 | 3d overdue | Unassigned | $5,493 | ⭕ 2026-09-14: Have to wait for the door to get installed - Harrison Est End: 2026-09-21 | |
| 26-Lakeview Fields-Keystone Construction | Stucco Color | Sep 17, 2026 | 3d overdue | Unassigned | $1,341 | ✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today until lath is fixed and ready for 100% of the stucco application. Was not notified | |
| 25-Lakeview Fields-Keystone Construction | Stucco Color | Sep 17, 2026 | 3d overdue | Unassigned | $1,294 | ||
| 2212-Wildflower-Edge | Set Scaff | Sep 18, 2026 | 2d overdue | Unassigned | $660 | ||
| Bldg 37-Highridge-Edge | Set Scaff | Sep 18, 2026 | 2d overdue | Unassigned | $1,104 | ||
| 246-Viridian Plus-DR Horton | Set Scaff | Sep 19, 2026 | 1d overdue | Unassigned | $784 | ||
| 353-Viridian Emerald-DR Horton | Brick | Sep 20, 2026 | today | Unassigned | $4,941 | ✅ | |
| 2021-Wildflower-Toll Brothers | Stucco Color | Sep 20, 2026 | today | Unassigned | 2026-09-18 | $111 | ✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026-09-18 ✅ 2026-09-02: 7 Days - Brown delay - missing drywall window - good to proceed on scratch |
| 421-Viridian-DR Horton | Stucco Color | Sep 20, 2026 | today | Unassigned | $906 | ||
| Bldg 58-Harmony Ridge-Edge | Stucco Color | Sep 20, 2026 | today | Unassigned | $2,677 | ||
| 26-Tanner Flats-Ivory | Stucco Color | Sep 20, 2026 | today | Unassigned | $981 | ✅ 2026-09-09: 3 Days - Hold on siding good for stucco brown - Jorge 2026-09-14 | |
| 405-Viridian-DR Horton | Set Scaff | Sep 21, 2026 | in 1d | Unassigned | $771 | ||
| 518-River Point-Edge | Set Scaff | Sep 21, 2026 | in 1d | Unassigned | $583 | ||
| 314-Viridian-DR Horton | Set Scaff | Sep 21, 2026 | in 1d | Unassigned | $627 | ||
| 525-River Point-Edge | Set Scaff | Sep 21, 2026 | in 1d | Unassigned | $671 | ||
| 313-Viridian-DR Horton | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $909 | ||
| Units 161-164-Enclave at Harmony Place-Woodside | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $1,611 | ✅ 2026-08-25: Scaff Delay - Hold on scaff - Jorge 2026-09-03 | |
| 712-Highridge-Edge | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | 2026-09-17 | $1,197 | ✅ 2026-09-02: Scaff Delay - Scaff delay - porch cap still isn’t poured , cm told me to hold on Scaff til it’s poured - Jonathan 2026-09-08 |
| Units 471-475-Legacy at Meadowbrook-Woodside | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $1,528 | ✅ 2026-08-25: Scaff Delay - - Harrison 2026-08-28 ✅ 2026-08-05: Scaff Delay - Passed 4 way but we cannot start scaff for 2 weeks. The 18th - Harrison 2026-08-24 | |
| 1031-Harmony Ridge-Edge | Set Scaff | Sep 23, 2026 | in 3d | Unassigned | $712 | ||
| 519-River Point-Edge | Set Scaff | Sep 23, 2026 | in 3d | Unassigned | $693 | ||
| 914-Broadview Shores-Ivory | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $889 | ||
| 1008-Harmony Ridge-Edge | Set Scaff | Sep 24, 2026 | in 4d | Unassigned | $759 | ||
| 732-Ridgehorne-Edge | Set Scaff | Sep 24, 2026 | in 4d | Unassigned | $661 | ||
| 710-Highridge-Edge | Set Scaff | Sep 25, 2026 | in 5d | Unassigned | $671 | ||
| 719-Highridge-Edge | Set Scaff | Sep 28, 2026 | in 8d | Unassigned | $614 | ||
| Bldg 36-Highridge-Edge | Set Scaff | Sep 28, 2026 | in 8d | Unassigned | $1,121 | ||
| 106-Auburn Springs-Edge | Set Scaff | Sep 28, 2026 | in 8d | Unassigned | $958 | ||
| 235-Viridian Plus-DR Horton | Set Scaff | Sep 29, 2026 | in 9d | Unassigned | $978 | ||
| 2234-Wildflower-Edge | Set Scaff | Sep 29, 2026 | in 9d | Unassigned | $789 | ||
| Bldg 59-Harmony Ridge-Edge | Set Scaff | Sep 29, 2026 | in 9d | Unassigned | $1,480 | ||
| 1005-Harmony Ridge-Edge | Set Scaff | Sep 30, 2026 | in 10d | Unassigned | $815 | ||
| Bldg 35-Highridge-Edge | Set Scaff | Sep 30, 2026 | in 10d | Unassigned | $1,121 | ||
| 602-River Point-Edge | Set Scaff | Oct 2, 2026 | in 12d | Unassigned | $653 | ||
| Bldg 56-Viridian Townhomes-DR Horton | Set Scaff | Oct 2, 2026 | in 12d | Unassigned | $1,283 | ||
| Bldg 39-Highridge-Edge | Insl Attic | Oct 9, 2026 | in 19d | Unassigned | $80 | ||
| Bldg 37-Highridge-Edge | Insl Attic | Nov 3, 2026 | in 44d | Unassigned | $80 | ||
| Bldg 35-Highridge-Edge | Insl Attic | Nov 13, 2026 | in 54d | Unassigned | $80 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 1004-Northstar Ranch-Destination Homes | Siding | Sep 11, 2026 | 9d overdue | Unassigned | 2026-09-14 | $1,265 | ✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15 |
| 1004-Northstar Ranch-Destination Homes | Soffit/Fascia | Sep 11, 2026 | 9d overdue | Unassigned | $597 | ✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15 | |
| 1037-Northstar Ranch-Destination Homes | Soffit/Fascia | Sep 11, 2026 | 9d overdue | Unassigned | $686 | ✅ 2026-09-09: 3 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-14 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28 | |
| 2916-Mountain Ridge-Edge | Housewrap | Sep 16, 2026 | 4d overdue | Unassigned | $880 | ⭕ 2026-09-16: Do not start exteriors until super approval, only set scaff - Arturo Est End: 2026-09-21 | |
| 2916-Mountain Ridge-Edge | Paper/Wire | Sep 16, 2026 | 4d overdue | Unassigned | $74 | ⭕ 2026-09-16: Do not start exteriors until super approval, only set scaff - Arturo Est End: 2026-09-21 | |
| 122-Capitol Reef-Edge | Rock | Sep 16, 2026 | 4d overdue | Unassigned | 2026-09-04 | $346 | |
| Units 539-540-Daybreak Lexington Townhomes-Destination Homes | Stucco Color | Sep 16, 2026 | 4d overdue | Unassigned | 2026-09-18 | $1,571 | ✅ 2026-08-25: 3 Days - Housewrap and paper and wire delay. Missing drywall windows and sheeting on beam - Facundo 2026-08-28 |
| 256-Boulder at Sky Ranch-Woodside | Siding | Sep 17, 2026 | 3d overdue | Unassigned | 2026-09-10 | $1,350 | |
| Bldg 204-Mountain Ridge-Edge | Paper/Wire | Sep 18, 2026 | 2d overdue | Unassigned | $1,756 | ||
| Bldg 18-Solari-Edge | Set Scaff | Sep 18, 2026 | 2d overdue | Unassigned | $1,570 | ||
| Bldg 21-Solari-Edge | Siding | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-14 | $1,973 | |
| 39-Sky Ranch Cascade-Woodside | Stucco Brown | Sep 18, 2026 | 2d overdue | Unassigned | $958 | ||
| 22-Sky Ranch Cascade-Woodside | Paint | Sep 19, 2026 | 1d overdue | Unassigned | $518 | ||
| 122-Capitol Reef-Edge | Paint | Sep 19, 2026 | 1d overdue | Unassigned | $307 | ||
| 2929-Mountain Ridge-Edge | Rock | Sep 19, 2026 | 1d overdue | Unassigned | 2026-09-15 | $216 | |
| 2929-Mountain Ridge-Edge | Scratch Coat | Sep 19, 2026 | 1d overdue | Unassigned | $50 | ||
| 2912-Mountain Ridge-Edge | Soffit/Fascia | Sep 19, 2026 | 1d overdue | Unassigned | $613 | ||
| 111-Creek Ridge Cove-Richmond | Remove Scaff | Sep 20, 2026 | today | Unassigned | $469 | ✅ 2026-08-28: 3 Days - Can’t finish lath and housewrap until back sliding door gets installed - Arturo 2026-09-02 | |
| 104-Pierson Farms-McArthur | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $961 | ✅ 2026-09-15: 1 Days - Electricians are fixing the electrical box and straighten it out so we cannot finish siding completely yet. Please don’t assign the Painter. - Facundo 2026-0 | |
| 22-Sky Ranch Cascade-Woodside | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | $891 | ||
| Units 544-548-Daybreak Lexington Townhomes-Destination Homes | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | 2026-09-16 | $3,582 | ✅ 2026-08-25: 6 Days - Can’t finish paper and wire completely. Missing drywall windows. - Facundo 2026-09-02 ✅ 2026-08-13: 7 Days - Paper and wire delay. Can’t finish scaffolding |
| 2931-Mountain Ridge-Edge | Set Scaff | Sep 22, 2026 | in 2d | Unassigned | $712 | ||
| 1004-Northstar Ranch-Destination Homes | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $999 | ✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15 | |
| 122-Capitol Reef-Edge | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $953 | ||
| 112-Creek Ridge Cove-Richmond | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $1,344 | ✅ 2026-08-28: 8 Days - We can’t finish lath and housewrap until framers finish front posts and install the side garage door - Arturo 2026-09-09 | |
| 186-Daybreak-Rainey Homes | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $402 | ✅ 2026-08-24: Material Delay - Wrong material was delivered. They delivered miratec trims and straight shake, the correct material is supposed to be allura trims and scattered shak | |
| 1037-Northstar Ranch-Destination Homes | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $979 | ✅ 2026-09-09: 3 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-14 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28 | |
| 103-Creek Ridge Cove-Richmond | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $1,219 | ||
| Bldg 21-Solari-Edge | Stucco Color | Sep 24, 2026 | in 4d | Unassigned | $2,876 | ||
| 2927-Mountain Ridge-Edge | Set Scaff | Sep 25, 2026 | in 5d | Unassigned | $708 | ||
| Bldg 9-Taylor Villas-Edge | Insl Attic | Sep 29, 2026 | in 9d | Unassigned | $179 | ✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18 | |
| 2907-Mountain Ridge-Edge | Set Scaff | Sep 29, 2026 | in 9d | Unassigned | $653 | ||
| Bldg 205-Mountain Ridge-Edge | Insl Walls | Sep 30, 2026 | in 10d | Unassigned | $1,048 | ||
| Bldg 1-Solari-Edge | Insl Attic | Oct 1, 2026 | in 11d | Unassigned | $143 | ✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19 | |
| 2904-Mountain Ridge-Edge | Set Scaff | Oct 1, 2026 | in 11d | Unassigned | $747 | ||
| Bldg 205-Mountain Ridge-Edge | Set Scaff | Oct 5, 2026 | in 15d | Unassigned | $1,492 | ||
| Bldg 208-Mountain Ridge-Edge | Insl Attic | Oct 14, 2026 | in 24d | Unassigned | $144 | ||
| Bldg 22-Solari-Edge | Insl Attic | Oct 26, 2026 | in 36d | Unassigned | $160 | ||
| Bldg 19-Solari-Edge | Insl Attic | Nov 3, 2026 | in 44d | Unassigned | $192 | ||
| Bldg 205-Mountain Ridge-Edge | Insl Attic | Nov 18, 2026 | in 59d | Unassigned | $143 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 52-Zion Shores-Split Rock | Rock | Sep 10, 2026 | 10d overdue | Unassigned | $7,478 | ||
| 37-Legacy at Sand Hollow-Visionary | Window Pre Wrap | Sep 10, 2026 | 10d overdue | Unassigned | $100 | ||
| 33-Legacy at Sand Hollow-Visionary | Window Pre Wrap | Sep 10, 2026 | 10d overdue | Unassigned | $100 | ||
| 323-Finley Farms-Richmond | Remove Scaff | Sep 13, 2026 | 7d overdue | Unassigned | $463 | ||
| 323-Finley Farms-Richmond | Stucco Color | Sep 13, 2026 | 7d overdue | Unassigned | $3,068 | ||
| 323-Finley Farms-Richmond | Stucco Corbels | Sep 13, 2026 | 7d overdue | Unassigned | $90 | ||
| Bldg 124-Long Valley Townhomes-DR Horton | Rock | Sep 17, 2026 | 3d overdue | Unassigned | 2026-09-09 | $50 | |
| 135-La Spazio-Lennar | Paper/Wire | Sep 18, 2026 | 2d overdue | Unassigned | $2,527 | ||
| 4159-Long Valley Rambler-DR Horton | Rock | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-10 | $406 | |
| 4270-Long Valley-DR Horton | Rock | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-10 | $504 | |
| 4293-Long Valley-DR Horton | Rock | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-09 | $707 | |
| 4271-Long Valley-DR Horton | Stucco Color | Sep 19, 2026 | 1d overdue | Unassigned | $1,766 | ||
| 403-The Preserve at Alaia-Visionary | Stucco Color | Sep 20, 2026 | today | Unassigned | $2,380 | ||
| Bldg 124-Long Valley Townhomes-DR Horton | Stucco Color | Sep 21, 2026 | in 1d | Unassigned | 2026-09-14 | $4,999 | |
| 4159-Long Valley Rambler-DR Horton | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $1,303 | ||
| 75-Divario-Visionary | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | $2,824 | ||
| 33-Black Desert North Village-H2 Homes | Stucco Color | Sep 22, 2026 | in 2d | Unassigned | 2026-08-17 | $4,708 | |
| 4270-Long Valley-DR Horton | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $1,916 | ||
| 4293-Long Valley-DR Horton | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $2,215 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Bldg C-Residence at Millcreek-Rimrock | Scratch Coat | Jul 16, 2026 | 66d overdue | Unassigned | $1,811 | ||
| Bldg D-Residence at Millcreek-Rimrock | Remove Scaff | Aug 6, 2026 | 45d overdue | Unassigned | $7,542 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Penetration Sealing | Aug 15, 2026 | 36d overdue | Unassigned | $0 | ||
| White Dome Chapel-St George-Grass Creek | Set Scaff | Aug 27, 2026 | 24d overdue | Unassigned | $57 | ||
| Bldg D-Residence at Millcreek-Rimrock | Rock | Sep 9, 2026 | 11d overdue | Unassigned | $15,588 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Set Scaff | Sep 16, 2026 | 4d overdue | Unassigned | $2,000 | West Walls Setup | |
| Garage 4-Residence at Millcreek-Rimrock | Rock | Sep 18, 2026 | 2d overdue | Unassigned | 2026-09-02 | $1,190 | |
| Garage 4-Residence at Millcreek-Rimrock | Stucco Color | Sep 23, 2026 | in 3d | Unassigned | $2,145 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown | Misc. Work | Aug 17, 2026 | 34d overdue | Unassigned | $0 | Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP |
Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):
Assigned Task Date is not blankTeam (Task Team) is blankCompleted Date/Time is blankTeam and Team Name agree on every record
(0 disagreements), so "no team assigned" is unambiguous.Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 296 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: