Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 20, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 18, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 20, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,892 task records pulled, 180 matched the filter · assignment dates Jul 16, 2026 to Nov 18, 2026

180
Ready for assignment
102
Past assignment date
6
Divisions affected
$220,285
Unassigned task pay
66d
Oldest overdue

Ready tasks by division

016335066Ogden6651 odOrem4614 odSalt Lake4017 odSt. George1912 odCommercial87 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Ogden··
Orem·
Salt Lake·
St. George··
Commercial··
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 24 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl WallsPenetration SealingWindow Pre WrapSet ScaffHousewrapSet Brick ScaffPaper/WireStucco BrownScratch CoatPaintSidingWateringRockBrickSoffit/FasciaBrown & MeshGuttersRemove ScaffStucco CorbelsStucco ColorScaff PickupMisc. WorkInsl AtticFoundation PlasterTotal
Ogden·······
Orem·················
Salt Lake···········
St. George··················
Commercial··················
Corporate·······················
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 149 of 180 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionStucco ColorScaffoldingPaintRockGuttersPaper/WireInsulationHousewrapSoffitSidingBrickStucco BrownField OpsWarrantyAny tradeTotal
Ogden····
Orem········
Salt Lake····
St. George·········
Commercial··········
Corporate··············
All divisions·

Crews with a hand up — available to that division

DivisionStucco ColorScaffoldingPaintRockGuttersPaper/WireInsulationHousewrapSoffitSidingBrickStucco BrownField OpsWarrantyAny tradeTotal
Ogden············
Orem··········
Salt Lake··········
St. George············
Commercial················
Corporate················
All divisions······

26 crews company-wide have a hand up, counted once per division they cover (31 crew-division slots, of which 5 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Ogden — 66 tasks ready for assignment · 51 overdue · $66,962
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
71-Brookfield-LennarGuttersAug 24, 202627d overdueUnassigned$167
63-Brookfield-LennarGuttersAug 24, 202627d overdueUnassigned$236
106-Red Hill-IvorySet Brick ScaffAug 24, 202627d overdueUnassigned$0
Bldg 6-Midtown Village-DR HortonSet Brick ScaffAug 26, 202625d overdueUnassigned$0✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 202625d overdueUnassigned$134
Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction GroupRockAug 31, 202620d overdueUnassigned2026-08-26$635⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-25
9-Crested Peaks-IvoryRockSep 10, 202610d overdueUnassigned2026-08-26$4,768
9-Crested Peaks-IvoryScratch CoatSep 10, 202610d overdueUnassigned$646
102-Meadows at Hyde Park-VisionaryBrickSep 11, 20269d overdueUnassigned2026-09-14$736
501-Legacy Park-IvoryScaff PickupSep 11, 20269d overdueUnassigned$0Trailer ready for pick up
Units 47-52-Hess Farms-David Weekley HomesSet ScaffSep 11, 20269d overdueUnassigned$1,966⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-23
1709-Cranefield Estates-IvoryGuttersSep 15, 20265d overdueUnassigned$216
TH 6-Flint Acres-Henry Walker HomesBrickSep 16, 20264d overdueUnassigned$3,737
Lot 1-6-River Bend Manor Townhomes-HamletHousewrapSep 16, 20264d overdueUnassigned$1,493
108-Stagecoach Estates-McArthurPaintSep 16, 20264d overdueUnassigned2026-09-12$173
102-Meadows at Hyde Park-VisionaryPaintSep 16, 20264d overdueUnassigned$645
102-Village at Fox Meadows-VisionaryPaintSep 16, 20264d overdueUnassigned$583✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
134-Legends Crossing-VisionaryPaper/WireSep 16, 20264d overdueUnassigned2026-09-14$50
TH 6-Flint Acres-Henry Walker HomesScratch CoatSep 16, 20264d overdueUnassigned$370
Bldg U-Village at Fox Meadows Townhomes-VisionaryGuttersSep 17, 20263d overdueUnassigned$1,001
4-Brynlee Acres-HamletPaintSep 17, 20263d overdueUnassigned$362
116-Meadows at Hyde Park-VisionaryPaintSep 17, 20263d overdueUnassigned$813
521-Vineyard-VisionaryPaintSep 17, 20263d overdueUnassigned$377
1710-Cranefield Estates-IvoryPaper/WireSep 17, 20263d overdueUnassigned2026-09-14$1,244
Bldg F-Legends Crossing Townhomes-VisionaryPaper/WireSep 17, 20263d overdueUnassigned$116
12-Mountainside Estates-DR HortonGuttersSep 18, 20262d overdueUnassigned$262
54-Cardamine-Sierra HomesGuttersSep 18, 20262d overdueUnassigned$262✅ 2026-07-29: 12 Days - We don’t have vinyl materials - Jose 2026-08-15
113-Three Farms Jenkins Fields-IvoryHousewrapSep 18, 20262d overdueUnassigned$839
72-Brookfield-LennarPaintSep 18, 20262d overdueUnassigned$3,098
107-Stagecoach Estates-McArthurPaintSep 18, 20262d overdueUnassigned$496
62-Brookfield-LennarPaintSep 18, 20262d overdueUnassigned2026-09-15$2,348
723-Ridgeline Park-VisionaryPaintSep 18, 20262d overdueUnassigned$796⭕ 2026-09-14: the concrete guys was start doing the porch cap and driways also on the east side was working building a wall - Jose Est End: 2026-09-21 ✅ 2026-09-02: -1 Days - Can’
124-Taylor Landing-LennarSoffit/FasciaSep 18, 20262d overdueUnassigned$791✅ 2026-09-09: Material Delay - Lennar needs to get more materials for crews to complete siding. - Erik 2026-09-11
Bldg 6-Midtown Village-DR HortonWateringSep 18, 20262d overdueUnassigned$146✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
1715-Cranefield Estates-IvoryWateringSep 18, 20262d overdueUnassigned$64
206-Stagecoach Estates-McArthurWindow Pre WrapSep 18, 20262d overdueUnassigned$100
115-Stagecoach Estates-McArthurWindow Pre WrapSep 18, 20262d overdueUnassigned$100
5-Valley Meadows-Dixon HomesBrickSep 19, 20261d overdueUnassigned$13,668
176-Mountain Gate-Sierra HomesBrown & MeshSep 19, 20261d overdueUnassigned2026-09-15$1,815
209-Stagecoach Estates-McArthurHousewrapSep 19, 20261d overdueUnassigned$608
339-Sugar Creek-VisionaryPaintSep 19, 20261d overdueUnassigned$214
Bldg L-Sugar Creek Townhomes-VisionaryPaintSep 19, 20261d overdueUnassigned$2,304
Units 1-6-VTG-Sierra HomesPaper/WireSep 19, 20261d overdueUnassigned2026-09-18$2,580
821-Ridgeline Park-VisionaryRemove ScaffSep 19, 20261d overdueUnassigned$149
176-Mountain Gate-Sierra HomesRockSep 19, 20261d overdueUnassigned2026-09-11$1,213
Bldg Y-North Point Townhomes-VisionaryRockSep 19, 20261d overdueUnassigned2026-08-26$1,716
176-Mountain Gate-Sierra HomesScratch CoatSep 19, 20261d overdueUnassigned$140
Bldg Y-North Point Townhomes-VisionaryScratch CoatSep 19, 20261d overdueUnassigned$186
2-Brynlee Acres-HamletSoffit/FasciaSep 19, 20261d overdueUnassigned$613
108-Stagecoach Estates-McArthurStucco ColorSep 19, 20261d overdueUnassigned2026-09-18$923
603-Vineyard-VisionaryStucco ColorSep 19, 20261d overdueUnassigned2026-09-08$1,139
227-Bristol Farms-Regal HomesFoundation PlasterSep 20, 2026todayUnassigned$450
SF 7-Flint Acres-Henry Walker HomesGuttersSep 20, 2026todayUnassigned$648
3-Brynlee Acres-HamletGuttersSep 20, 2026todayUnassigned$248
2-Brynlee Acres-HamletGuttersSep 20, 2026todayUnassigned$301
203-Weber View-IvoryGuttersSep 20, 2026todayUnassigned$376
1523-Cranefield Estates-IvoryGuttersSep 20, 2026todayUnassigned$382
11-Heritage Parkway-Sierra HomesGuttersSep 20, 2026todayUnassigned$236✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
505-Legacy Park-IvoryGuttersSep 20, 2026todayUnassigned$197✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
107-Stagecoach Estates-McArthurStucco ColorSep 21, 2026in 1dUnassigned$803
5-Brynlee Acres-HamletStucco ColorSep 21, 2026in 1dUnassigned$830✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02
814-Ridgeline Park-VisionaryStucco ColorSep 21, 2026in 1dUnassigned$1,183
Bldg 6-Midtown Village-DR HortonStucco ColorSep 22, 2026in 2dUnassigned$1,455✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
338-Sugar Creek-VisionaryStucco ColorSep 23, 2026in 3dUnassigned$1,028
1715-Cranefield Estates-IvoryStucco ColorSep 23, 2026in 3dUnassigned$809
102-Meadows at Hyde Park-VisionaryStucco ColorSep 24, 2026in 4dUnassigned$978
Orem — 46 tasks ready for assignment · 14 overdue · $49,663
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
106-Canyon Park-Tri Pointe HomesPaper/WireAug 29, 202622d overdueUnassigned2026-09-03$117⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-21 ✅ 2026-08-20:
110-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202610d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25
109-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202610d overdueUnassigned2026-09-02$117⭕ 2026-09-11: Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex Est End: 2026-09-21
519-Ridgeview Cottages-IvoryPaper/WireSep 11, 20269d overdueUnassigned2026-09-14$940✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15
16118-Harmony-Meritage HomesSoffit/FasciaSep 11, 20269d overdueUnassigned$418
718-Highridge-EdgeSet ScaffSep 14, 20266d overdueUnassigned$831
16118-Harmony-Meritage HomesSidingSep 14, 20266d overdueUnassigned2026-09-11$3,863
339-Viridian-DR HortonSet ScaffSep 16, 20264d overdueUnassigned$574
525-Ridgeview Cottages-IvorySidingSep 17, 20263d overdueUnassigned$5,493⭕ 2026-09-14: Have to wait for the door to get installed - Harrison Est End: 2026-09-21
26-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 20263d overdueUnassigned$1,341✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today until lath is fixed and ready for 100% of the stucco application. Was not notified
25-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 20263d overdueUnassigned$1,294
2212-Wildflower-EdgeSet ScaffSep 18, 20262d overdueUnassigned$660
Bldg 37-Highridge-EdgeSet ScaffSep 18, 20262d overdueUnassigned$1,104
246-Viridian Plus-DR HortonSet ScaffSep 19, 20261d overdueUnassigned$784
353-Viridian Emerald-DR HortonBrickSep 20, 2026todayUnassigned$4,941✅
2021-Wildflower-Toll BrothersStucco ColorSep 20, 2026todayUnassigned2026-09-18$111✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026-09-18 ✅ 2026-09-02: 7 Days - Brown delay - missing drywall window - good to proceed on scratch
421-Viridian-DR HortonStucco ColorSep 20, 2026todayUnassigned$906
Bldg 58-Harmony Ridge-EdgeStucco ColorSep 20, 2026todayUnassigned$2,677
26-Tanner Flats-IvoryStucco ColorSep 20, 2026todayUnassigned$981✅ 2026-09-09: 3 Days - Hold on siding good for stucco brown - Jorge 2026-09-14
405-Viridian-DR HortonSet ScaffSep 21, 2026in 1dUnassigned$771
518-River Point-EdgeSet ScaffSep 21, 2026in 1dUnassigned$583
314-Viridian-DR HortonSet ScaffSep 21, 2026in 1dUnassigned$627
525-River Point-EdgeSet ScaffSep 21, 2026in 1dUnassigned$671
313-Viridian-DR HortonStucco ColorSep 21, 2026in 1dUnassigned$909
Units 161-164-Enclave at Harmony Place-WoodsideStucco ColorSep 22, 2026in 2dUnassigned$1,611✅ 2026-08-25: Scaff Delay - Hold on scaff - Jorge 2026-09-03
712-Highridge-EdgeStucco ColorSep 22, 2026in 2dUnassigned2026-09-17$1,197✅ 2026-09-02: Scaff Delay - Scaff delay - porch cap still isn’t poured , cm told me to hold on Scaff til it’s poured - Jonathan 2026-09-08
Units 471-475-Legacy at Meadowbrook-WoodsideStucco ColorSep 22, 2026in 2dUnassigned$1,528✅ 2026-08-25: Scaff Delay - - Harrison 2026-08-28 ✅ 2026-08-05: Scaff Delay - Passed 4 way but we cannot start scaff for 2 weeks. The 18th - Harrison 2026-08-24
1031-Harmony Ridge-EdgeSet ScaffSep 23, 2026in 3dUnassigned$712
519-River Point-EdgeSet ScaffSep 23, 2026in 3dUnassigned$693
914-Broadview Shores-IvoryStucco ColorSep 23, 2026in 3dUnassigned$889
1008-Harmony Ridge-EdgeSet ScaffSep 24, 2026in 4dUnassigned$759
732-Ridgehorne-EdgeSet ScaffSep 24, 2026in 4dUnassigned$661
710-Highridge-EdgeSet ScaffSep 25, 2026in 5dUnassigned$671
719-Highridge-EdgeSet ScaffSep 28, 2026in 8dUnassigned$614
Bldg 36-Highridge-EdgeSet ScaffSep 28, 2026in 8dUnassigned$1,121
106-Auburn Springs-EdgeSet ScaffSep 28, 2026in 8dUnassigned$958
235-Viridian Plus-DR HortonSet ScaffSep 29, 2026in 9dUnassigned$978
2234-Wildflower-EdgeSet ScaffSep 29, 2026in 9dUnassigned$789
Bldg 59-Harmony Ridge-EdgeSet ScaffSep 29, 2026in 9dUnassigned$1,480
1005-Harmony Ridge-EdgeSet ScaffSep 30, 2026in 10dUnassigned$815
Bldg 35-Highridge-EdgeSet ScaffSep 30, 2026in 10dUnassigned$1,121
602-River Point-EdgeSet ScaffOct 2, 2026in 12dUnassigned$653
Bldg 56-Viridian Townhomes-DR HortonSet ScaffOct 2, 2026in 12dUnassigned$1,283
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 19dUnassigned$80
Bldg 37-Highridge-EdgeInsl AtticNov 3, 2026in 44dUnassigned$80
Bldg 35-Highridge-EdgeInsl AtticNov 13, 2026in 54dUnassigned$80
Salt Lake — 40 tasks ready for assignment · 17 overdue · $35,725
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
1004-Northstar Ranch-Destination HomesSidingSep 11, 20269d overdueUnassigned2026-09-14$1,265✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15
1004-Northstar Ranch-Destination HomesSoffit/FasciaSep 11, 20269d overdueUnassigned$597✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15
1037-Northstar Ranch-Destination HomesSoffit/FasciaSep 11, 20269d overdueUnassigned$686✅ 2026-09-09: 3 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-14 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
2916-Mountain Ridge-EdgeHousewrapSep 16, 20264d overdueUnassigned$880⭕ 2026-09-16: Do not start exteriors until super approval, only set scaff - Arturo Est End: 2026-09-21
2916-Mountain Ridge-EdgePaper/WireSep 16, 20264d overdueUnassigned$74⭕ 2026-09-16: Do not start exteriors until super approval, only set scaff - Arturo Est End: 2026-09-21
122-Capitol Reef-EdgeRockSep 16, 20264d overdueUnassigned2026-09-04$346
Units 539-540-Daybreak Lexington Townhomes-Destination HomesStucco ColorSep 16, 20264d overdueUnassigned2026-09-18$1,571✅ 2026-08-25: 3 Days - Housewrap and paper and wire delay. Missing drywall windows and sheeting on beam - Facundo 2026-08-28
256-Boulder at Sky Ranch-WoodsideSidingSep 17, 20263d overdueUnassigned2026-09-10$1,350
Bldg 204-Mountain Ridge-EdgePaper/WireSep 18, 20262d overdueUnassigned$1,756
Bldg 18-Solari-EdgeSet ScaffSep 18, 20262d overdueUnassigned$1,570
Bldg 21-Solari-EdgeSidingSep 18, 20262d overdueUnassigned2026-09-14$1,973
39-Sky Ranch Cascade-WoodsideStucco BrownSep 18, 20262d overdueUnassigned$958
22-Sky Ranch Cascade-WoodsidePaintSep 19, 20261d overdueUnassigned$518
122-Capitol Reef-EdgePaintSep 19, 20261d overdueUnassigned$307
2929-Mountain Ridge-EdgeRockSep 19, 20261d overdueUnassigned2026-09-15$216
2929-Mountain Ridge-EdgeScratch CoatSep 19, 20261d overdueUnassigned$50
2912-Mountain Ridge-EdgeSoffit/FasciaSep 19, 20261d overdueUnassigned$613
111-Creek Ridge Cove-RichmondRemove ScaffSep 20, 2026todayUnassigned$469✅ 2026-08-28: 3 Days - Can’t finish lath and housewrap until back sliding door gets installed - Arturo 2026-09-02
104-Pierson Farms-McArthurStucco ColorSep 21, 2026in 1dUnassigned$961✅ 2026-09-15: 1 Days - Electricians are fixing the electrical box and straighten it out so we cannot finish siding completely yet. Please don’t assign the Painter. - Facundo 2026-0
22-Sky Ranch Cascade-WoodsideStucco ColorSep 21, 2026in 1dUnassigned$891
Units 544-548-Daybreak Lexington Townhomes-Destination HomesStucco ColorSep 21, 2026in 1dUnassigned2026-09-16$3,582✅ 2026-08-25: 6 Days - Can’t finish paper and wire completely. Missing drywall windows. - Facundo 2026-09-02 ✅ 2026-08-13: 7 Days - Paper and wire delay. Can’t finish scaffolding
2931-Mountain Ridge-EdgeSet ScaffSep 22, 2026in 2dUnassigned$712
1004-Northstar Ranch-Destination HomesStucco ColorSep 22, 2026in 2dUnassigned$999✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15
122-Capitol Reef-EdgeStucco ColorSep 22, 2026in 2dUnassigned$953
112-Creek Ridge Cove-RichmondStucco ColorSep 22, 2026in 2dUnassigned$1,344✅ 2026-08-28: 8 Days - We can’t finish lath and housewrap until framers finish front posts and install the side garage door - Arturo 2026-09-09
186-Daybreak-Rainey HomesStucco ColorSep 22, 2026in 2dUnassigned$402✅ 2026-08-24: Material Delay - Wrong material was delivered. They delivered miratec trims and straight shake, the correct material is supposed to be allura trims and scattered shak
1037-Northstar Ranch-Destination HomesStucco ColorSep 23, 2026in 3dUnassigned$979✅ 2026-09-09: 3 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-14 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
103-Creek Ridge Cove-RichmondStucco ColorSep 23, 2026in 3dUnassigned$1,219
Bldg 21-Solari-EdgeStucco ColorSep 24, 2026in 4dUnassigned$2,876
2927-Mountain Ridge-EdgeSet ScaffSep 25, 2026in 5dUnassigned$708
Bldg 9-Taylor Villas-EdgeInsl AtticSep 29, 2026in 9dUnassigned$179✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
2907-Mountain Ridge-EdgeSet ScaffSep 29, 2026in 9dUnassigned$653
Bldg 205-Mountain Ridge-EdgeInsl WallsSep 30, 2026in 10dUnassigned$1,048
Bldg 1-Solari-EdgeInsl AtticOct 1, 2026in 11dUnassigned$143✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
2904-Mountain Ridge-EdgeSet ScaffOct 1, 2026in 11dUnassigned$747
Bldg 205-Mountain Ridge-EdgeSet ScaffOct 5, 2026in 15dUnassigned$1,492
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 24dUnassigned$144
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 36dUnassigned$160
Bldg 19-Solari-EdgeInsl AtticNov 3, 2026in 44dUnassigned$192
Bldg 205-Mountain Ridge-EdgeInsl AtticNov 18, 2026in 59dUnassigned$143
St. George — 19 tasks ready for assignment · 12 overdue · $37,603
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
52-Zion Shores-Split RockRockSep 10, 202610d overdueUnassigned$7,478
37-Legacy at Sand Hollow-VisionaryWindow Pre WrapSep 10, 202610d overdueUnassigned$100
33-Legacy at Sand Hollow-VisionaryWindow Pre WrapSep 10, 202610d overdueUnassigned$100
323-Finley Farms-RichmondRemove ScaffSep 13, 20267d overdueUnassigned$463
323-Finley Farms-RichmondStucco ColorSep 13, 20267d overdueUnassigned$3,068
323-Finley Farms-RichmondStucco CorbelsSep 13, 20267d overdueUnassigned$90
Bldg 124-Long Valley Townhomes-DR HortonRockSep 17, 20263d overdueUnassigned2026-09-09$50
135-La Spazio-LennarPaper/WireSep 18, 20262d overdueUnassigned$2,527
4159-Long Valley Rambler-DR HortonRockSep 18, 20262d overdueUnassigned2026-09-10$406
4270-Long Valley-DR HortonRockSep 18, 20262d overdueUnassigned2026-09-10$504
4293-Long Valley-DR HortonRockSep 18, 20262d overdueUnassigned2026-09-09$707
4271-Long Valley-DR HortonStucco ColorSep 19, 20261d overdueUnassigned$1,766
403-The Preserve at Alaia-VisionaryStucco ColorSep 20, 2026todayUnassigned$2,380
Bldg 124-Long Valley Townhomes-DR HortonStucco ColorSep 21, 2026in 1dUnassigned2026-09-14$4,999
4159-Long Valley Rambler-DR HortonStucco ColorSep 22, 2026in 2dUnassigned$1,303
75-Divario-VisionaryStucco ColorSep 22, 2026in 2dUnassigned$2,824
33-Black Desert North Village-H2 HomesStucco ColorSep 22, 2026in 2dUnassigned2026-08-17$4,708
4270-Long Valley-DR HortonStucco ColorSep 23, 2026in 3dUnassigned$1,916
4293-Long Valley-DR HortonStucco ColorSep 23, 2026in 3dUnassigned$2,215
Commercial — 8 tasks ready for assignment · 7 overdue · $30,332
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202666d overdueUnassigned$1,811
Bldg D-Residence at Millcreek-RimrockRemove ScaffAug 6, 202645d overdueUnassigned$7,542
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202636d overdueUnassigned$0
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 202624d overdueUnassigned$57
Bldg D-Residence at Millcreek-RimrockRockSep 9, 202611d overdueUnassigned$15,588
Bldg RU-1-ARA Southwest-Campbell ConstructionSet ScaffSep 16, 20264d overdueUnassigned$2,000West Walls Setup
Garage 4-Residence at Millcreek-RimrockRockSep 18, 20262d overdueUnassigned2026-09-02$1,190
Garage 4-Residence at Millcreek-RimrockStucco ColorSep 23, 2026in 3dUnassigned$2,145
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202634d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 296 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: