Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 22, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 18, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 22, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,992 task records pulled, 141 matched the filter · assignment dates Jul 16, 2026 to Nov 18, 2026

141
Ready for assignment
59
Past assignment date
6
Divisions affected
$177,069
Unassigned task pay
68d
Oldest overdue

Ready tasks by division

013264053Ogden5330 odOrem4415 odSalt Lake263 odSt. George93 odCommercial87 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Ogden··
Orem·
Salt Lake··
St. George··
Commercial··
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 21 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl WallsPenetration SealingSet ScaffHousewrapSet Brick ScaffPaper/WireStucco BrownScratch CoatSidingFix ScaffPaintRockBrickSoffit/FasciaBrown & MeshGuttersRemove ScaffStucco ColorScaff PickupMisc. WorkInsl AtticTotal
Ogden······
Orem··············
Salt Lake·············
St. George··················
Commercial···············
Corporate····················
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 117 of 141 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionScaffoldingStucco ColorGuttersInsulationPaper/WireRockPaintSoffitBrickStucco BrownHousewrapSidingField OpsWarrantyAny tradeTotal
Ogden····
Orem··········
Salt Lake········
St. George············
Commercial··········
Corporate··············
All divisions·

Crews with a hand up — available to that division

DivisionScaffoldingStucco ColorGuttersInsulationPaper/WireRockPaintSoffitBrickStucco BrownHousewrapSidingField OpsWarrantyAny tradeTotal
Ogden···········
Orem··········
Salt Lake··········
St. George·············
Commercial················
Corporate················
All divisions······

24 crews company-wide have a hand up, counted once per division they cover (30 crew-division slots, of which 6 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Ogden — 53 tasks ready for assignment · 30 overdue · $54,437
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
71-Brookfield-LennarGuttersAug 24, 202629d overdueUnassigned$167
63-Brookfield-LennarGuttersAug 24, 202629d overdueUnassigned$236
106-Red Hill-IvorySet Brick ScaffAug 24, 202629d overdueUnassigned$0
Bldg 6-Midtown Village-DR HortonSet Brick ScaffAug 26, 202627d overdueUnassigned$0✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 202627d overdueUnassigned$134
Jorgensen Residence CMU-Custom Jobs (Huntsville)-Jed Slama Construction GroupRockAug 31, 202622d overdueUnassigned2026-08-26$635⭕ 2026-08-24: Material Delay - we're waiting on the stone to get the fireplace completed - George Est End: 2026-09-25
9-Crested Peaks-IvoryRockSep 10, 202612d overdueUnassigned2026-08-26$4,768
9-Crested Peaks-IvoryScratch CoatSep 10, 202612d overdueUnassigned$646
102-Meadows at Hyde Park-VisionaryBrickSep 11, 202611d overdueUnassigned2026-09-14$736
501-Legacy Park-IvoryScaff PickupSep 11, 202611d overdueUnassigned$0Trailer ready for pick up
Units 47-52-Hess Farms-David Weekley HomesSet ScaffSep 11, 202611d overdueUnassigned$1,966⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-23
TH 6-Flint Acres-Henry Walker HomesBrickSep 16, 20266d overdueUnassigned$3,737
102-Meadows at Hyde Park-VisionaryPaintSep 16, 20266d overdueUnassigned$645
102-Village at Fox Meadows-VisionaryPaintSep 16, 20266d overdueUnassigned$583✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
TH 6-Flint Acres-Henry Walker HomesScratch CoatSep 16, 20266d overdueUnassigned$370
4-Brynlee Acres-HamletPaintSep 17, 20265d overdueUnassigned$362
1710-Cranefield Estates-IvoryPaper/WireSep 17, 20265d overdueUnassigned2026-09-14$1,244
12-Mountainside Estates-DR HortonGuttersSep 18, 20264d overdueUnassigned$262
723-Ridgeline Park-VisionaryPaintSep 18, 20264d overdueUnassigned$796⭕ 2026-09-14: the concrete guys was start doing the porch cap and driways also on the east side was working building a wall - Jose Est End: 2026-09-21 ✅ 2026-09-02: -1 Days - Can’
5-Valley Meadows-Dixon HomesBrickSep 19, 20263d overdueUnassigned$13,668
176-Mountain Gate-Sierra HomesBrown & MeshSep 19, 20263d overdueUnassigned2026-09-15$1,815
339-Sugar Creek-VisionaryPaintSep 19, 20263d overdueUnassigned$214
Bldg L-Sugar Creek Townhomes-VisionaryPaintSep 19, 20263d overdueUnassigned$2,304
176-Mountain Gate-Sierra HomesRockSep 19, 20263d overdueUnassigned2026-09-11$1,213
176-Mountain Gate-Sierra HomesScratch CoatSep 19, 20263d overdueUnassigned$140
505-Legacy Park-IvoryGuttersSep 21, 20261d overdueUnassigned$197✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
820-Ridgeline Park-VisionaryPaper/WireSep 21, 20261d overdueUnassigned$1,237
101-Seasons at Taylor Landing-RichmondRemove ScaffSep 21, 20261d overdueUnassigned$0
124-Three Farms Jenkins Fields-IvorySet Brick ScaffSep 21, 20261d overdueUnassigned$24
814-Ridgeline Park-VisionaryStucco ColorSep 21, 20261d overdueUnassigned$1,183
Bldg L-Sugar Creek Townhomes-VisionaryBrown & MeshSep 22, 2026todayUnassigned2026-09-10$1,428
SF 7-Flint Acres-Henry Walker HomesGuttersSep 22, 2026todayUnassigned$648
3-Brynlee Acres-HamletGuttersSep 22, 2026todayUnassigned$248
2-Brynlee Acres-HamletGuttersSep 22, 2026todayUnassigned$301
203-Weber View-IvoryGuttersSep 22, 2026todayUnassigned$376
11-Heritage Parkway-Sierra HomesGuttersSep 22, 2026todayUnassigned$236✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
124-Three Farms Jenkins Fields-IvoryHousewrapSep 22, 2026todayUnassigned$834
503-Vineyard-VisionaryPaintSep 22, 2026todayUnassigned$622
113-Three Farms Jenkins Fields-IvoryPaper/WireSep 22, 2026todayUnassigned2026-09-17$1,080
Bldg AC-North Point Townhomes-VisionaryRockSep 22, 2026todayUnassigned$1,130
Bldg L-Sugar Creek Townhomes-VisionaryRockSep 22, 2026todayUnassigned$530
339-Sugar Creek-VisionaryScratch CoatSep 22, 2026todayUnassigned$50
Bldg AC-North Point Townhomes-VisionaryScratch CoatSep 22, 2026todayUnassigned$128
Bldg L-Sugar Creek Townhomes-VisionaryScratch CoatSep 22, 2026todayUnassigned$53
203-Weber View-IvorySoffit/FasciaSep 22, 2026todayUnassigned$743
Bldg L-Sugar Creek Townhomes-VisionaryStucco BrownSep 22, 2026todayUnassigned$1,428
Bldg 6-Midtown Village-DR HortonStucco ColorSep 22, 2026todayUnassigned$1,455✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
Bldg Y-North Point Townhomes-VisionaryScratch CoatSep 23, 2026in 1dUnassigned$186
338-Sugar Creek-VisionaryStucco ColorSep 23, 2026in 1dUnassigned$1,028
1523-Cranefield Estates-IvoryGuttersSep 24, 2026in 2dUnassigned$382
102-Meadows at Hyde Park-VisionaryStucco ColorSep 24, 2026in 2dUnassigned$978
116-Meadows at Hyde Park-VisionaryStucco ColorSep 26, 2026in 4dUnassigned$704
521-Vineyard-VisionaryStucco ColorSep 26, 2026in 4dUnassigned$585
Orem — 44 tasks ready for assignment · 15 overdue · $32,665
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
106-Canyon Park-Tri Pointe HomesPaper/WireAug 29, 202624d overdueUnassigned2026-09-03$117⭕ 2026-09-03: Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex Est End: 2026-09-22 ✅ 2026-08-20:
110-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202612d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25
109-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202612d overdueUnassigned2026-09-02$117⭕ 2026-09-11: Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex Est End: 2026-09-22
16118-Harmony-Meritage HomesSoffit/FasciaSep 11, 202611d overdueUnassigned$418
339-Viridian-DR HortonSet ScaffSep 16, 20266d overdueUnassigned$574
26-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 20265d overdueUnassigned$1,341✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today until lath is fixed and ready for 100% of the stucco application. Was not notified
246-Viridian Plus-DR HortonSet ScaffSep 19, 20263d overdueUnassigned$784
518-River Point-EdgeSet ScaffSep 20, 20262d overdueUnassigned$583⭕ 2026-09-21: We can set staff, but we need to hold off on Weather barrier till further notice - Harrison Est End: 2026-09-23
525-River Point-EdgeSet ScaffSep 20, 20262d overdueUnassigned$671⭕ 2026-09-21: We can set staff, but we need to hold off on Weather barrier till further notice - Harrison Est End: 2026-09-23
Bldg 58-Harmony Ridge-EdgeStucco ColorSep 20, 20262d overdueUnassigned$2,677
26-Tanner Flats-IvoryStucco ColorSep 20, 20262d overdueUnassigned$981✅ 2026-09-09: 3 Days - Hold on siding good for stucco brown - Jorge 2026-09-14
345-Mountain Vista at Sunset Flats-Pulte HomesFix ScaffSep 21, 20261d overdueUnassigned$40⭕ 2026-09-11: We can’t not lath this job to when I pass Housewrap inspections it’s not ready for lath and I have to do at vpo when it’s ready for the Housewrap to comeback and fix
718-Highridge-EdgePaper/WireSep 21, 20261d overdueUnassigned2026-09-18$59
2216 (FP)-Wildflower-EdgePaper/WireSep 21, 20261d overdueUnassigned$50
142-Auburn Springs-EdgeSoffit/FasciaSep 21, 20261d overdueUnassigned$1,035✅ 2026-09-09: 3 Days - After the column got finished, they are still twisted. I spoke with Jason. - Harrison 2026-09-14 ✅ 2026-09-08: 1 Days - Columns are not finished on the front
135-Auburn Springs-EdgeRemove ScaffSep 22, 2026todayUnassigned$492✅ 2026-09-08: 3 Days - Columns are twisted - Harrison 2026-09-11
405-Viridian-DR HortonSet ScaffSep 22, 2026todayUnassigned$771
314-Viridian-DR HortonSet ScaffSep 22, 2026todayUnassigned$627
Units 161-164-Enclave at Harmony Place-WoodsideStucco ColorSep 22, 2026todayUnassigned$1,611✅ 2026-08-25: Scaff Delay - Hold on scaff - Jorge 2026-09-03
Units 471-475-Legacy at Meadowbrook-WoodsideStucco ColorSep 22, 2026todayUnassigned$1,528✅ 2026-08-25: Scaff Delay - - Harrison 2026-08-28 ✅ 2026-08-05: Scaff Delay - Passed 4 way but we cannot start scaff for 2 weeks. The 18th - Harrison 2026-08-24
1031-Harmony Ridge-EdgeSet ScaffSep 23, 2026in 1dUnassigned$712
519-River Point-EdgeSet ScaffSep 23, 2026in 1dUnassigned$693
914-Broadview Shores-IvoryStucco ColorSep 23, 2026in 1dUnassigned$889
1008-Harmony Ridge-EdgeSet ScaffSep 24, 2026in 2dUnassigned$759
732-Ridgehorne-EdgeSet ScaffSep 24, 2026in 2dUnassigned$661
710-Highridge-EdgeSet ScaffSep 25, 2026in 3dUnassigned$671
719-Highridge-EdgeSet ScaffSep 28, 2026in 6dUnassigned$614
106-Auburn Springs-EdgeSet ScaffSep 28, 2026in 6dUnassigned$958
235-Viridian Plus-DR HortonSet ScaffSep 29, 2026in 7dUnassigned$978
2234-Wildflower-EdgeSet ScaffSep 29, 2026in 7dUnassigned$789
Bldg 59-Harmony Ridge-EdgeSet ScaffSep 29, 2026in 7dUnassigned$1,480
1005-Harmony Ridge-EdgeSet ScaffSep 30, 2026in 8dUnassigned$815
Bldg 35-Highridge-EdgeSet ScaffSep 30, 2026in 8dUnassigned$1,121
602-River Point-EdgeSet ScaffOct 2, 2026in 10dUnassigned$653
Bldg 56-Viridian Townhomes-DR HortonSet ScaffOct 2, 2026in 10dUnassigned$1,283
102-Auburn Springs-EdgeSet ScaffOct 5, 2026in 13dUnassigned$931
104-Auburn Springs-EdgeSet ScaffOct 5, 2026in 13dUnassigned$1,024
714-Highridge-EdgeSet ScaffOct 5, 2026in 13dUnassigned$572
713-Ridgehorne-EdgeSet ScaffOct 6, 2026in 14dUnassigned$829
521-River Point-EdgeSet ScaffOct 6, 2026in 14dUnassigned$766
2210-Wildflower-EdgeSet ScaffOct 6, 2026in 14dUnassigned$576
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 17dUnassigned$80
Bldg 37-Highridge-EdgeInsl AtticNov 3, 2026in 42dUnassigned$80
Bldg 35-Highridge-EdgeInsl AtticNov 13, 2026in 52dUnassigned$80
Salt Lake — 26 tasks ready for assignment · 3 overdue · $29,407
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
2916-Mountain Ridge-EdgeHousewrapSep 16, 20266d overdueUnassigned$880✅ 2026-09-16: 3 Days - Do not start exteriors until super approval, only set scaff - Arturo 2026-09-21
122-Capitol Reef-EdgeSoffit/FasciaSep 21, 20261d overdueUnassigned$564
Units 544-548-Daybreak Lexington Townhomes-Destination HomesStucco ColorSep 21, 20261d overdueUnassigned2026-09-16$3,582✅ 2026-08-25: 6 Days - Can’t finish paper and wire completely. Missing drywall windows. - Facundo 2026-09-02 ✅ 2026-08-13: 7 Days - Paper and wire delay. Can’t finish scaffolding
1004-Northstar Ranch-Destination HomesStucco ColorSep 22, 2026todayUnassigned$999✅ 2026-09-09: 4 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-15
122-Capitol Reef-EdgeStucco ColorSep 22, 2026todayUnassigned$953
186-Daybreak-Rainey HomesStucco ColorSep 22, 2026todayUnassigned$402✅ 2026-08-24: Material Delay - Wrong material was delivered. They delivered miratec trims and straight shake, the correct material is supposed to be allura trims and scattered shak
Bldg 22-Solari-EdgeSidingSep 23, 2026in 1dUnassigned2026-09-15$1,798
Bldg 22-Solari-EdgeStucco BrownSep 23, 2026in 1dUnassigned$2,843
1037-Northstar Ranch-Destination HomesStucco ColorSep 23, 2026in 1dUnassigned$979✅ 2026-09-09: 3 Days - Delayed for scaff taken down for gas line. - Dustin 2026-09-14 ✅ 2026-08-24: 4 Days - Waiting on materials/initial order - Alexander 2026-08-28
103-Creek Ridge Cove-RichmondStucco ColorSep 23, 2026in 1dUnassigned$1,219
Bldg 21-Solari-EdgeStucco ColorSep 24, 2026in 2dUnassigned$2,876
2927-Mountain Ridge-EdgeSet ScaffSep 25, 2026in 3dUnassigned$708
Units 325-330-Enclave at Sky Ranch-WoodsideStucco ColorSep 26, 2026in 4dUnassigned$3,498
154-Pierson Farms-McArthurStucco ColorSep 27, 2026in 5dUnassigned$937
256-Boulder at Sky Ranch-WoodsideStucco ColorSep 27, 2026in 5dUnassigned$914
Bldg 9-Taylor Villas-EdgeInsl AtticSep 29, 2026in 7dUnassigned$179✅ 2026-08-12: Scaff Delay - Missing roof shingles - Dustin 2026-08-18
2907-Mountain Ridge-EdgeSet ScaffSep 29, 2026in 7dUnassigned$653
Bldg 205-Mountain Ridge-EdgeInsl WallsSep 30, 2026in 8dUnassigned$1,048
Bldg 1-Solari-EdgeInsl AtticOct 1, 2026in 9dUnassigned$143✅ 2026-08-18: 1 Days - Delay brown and scratch for repair - Dustin 2026-08-19
2904-Mountain Ridge-EdgeSet ScaffOct 1, 2026in 9dUnassigned$747
Bldg 17-Solari-EdgeSet ScaffOct 5, 2026in 13dUnassigned$1,355
Bldg 205-Mountain Ridge-EdgeSet ScaffOct 5, 2026in 13dUnassigned$1,492
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 22dUnassigned$144
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 34dUnassigned$160
Bldg 19-Solari-EdgeInsl AtticNov 3, 2026in 42dUnassigned$192
Bldg 205-Mountain Ridge-EdgeInsl AtticNov 18, 2026in 57dUnassigned$143
St. George — 9 tasks ready for assignment · 3 overdue · $30,228
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
52-Zion Shores-Split RockRockSep 10, 202612d overdueUnassigned$7,478
135-La Spazio-LennarPaper/WireSep 18, 20264d overdueUnassigned$2,527
Bldg 124-Long Valley Townhomes-DR HortonStucco ColorSep 21, 20261d overdueUnassigned2026-09-14$4,999
4159-Long Valley Rambler-DR HortonStucco ColorSep 22, 2026todayUnassigned$1,303
75-Divario-VisionaryStucco ColorSep 22, 2026todayUnassigned$2,824
33-Black Desert North Village-H2 HomesStucco ColorSep 22, 2026todayUnassigned2026-08-17$4,708
4270-Long Valley-DR HortonStucco ColorSep 23, 2026in 1dUnassigned$1,916
4293-Long Valley-DR HortonStucco ColorSep 23, 2026in 1dUnassigned$2,215
4294-Long Valley-DR HortonStucco ColorSep 26, 2026in 4dUnassigned$2,259
Commercial — 8 tasks ready for assignment · 7 overdue · $30,332
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202668d overdueUnassigned$1,811
Bldg D-Residence at Millcreek-RimrockRemove ScaffAug 6, 202647d overdueUnassigned$7,542
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202638d overdueUnassigned$0
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 202626d overdueUnassigned$57
Bldg D-Residence at Millcreek-RimrockRockSep 9, 202613d overdueUnassigned$15,588
Bldg RU-1-ARA Southwest-Campbell ConstructionSet ScaffSep 16, 20266d overdueUnassigned$2,000West Walls Setup
Garage 4-Residence at Millcreek-RimrockRockSep 18, 20264d overdueUnassigned2026-09-02$1,190
Garage 4-Residence at Millcreek-RimrockStucco ColorSep 23, 2026in 1dUnassigned$2,145
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202636d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 297 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: