Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 25, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 24, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 25, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,848 task records pulled, 165 matched the filter · assignment dates Jul 16, 2026 to Nov 24, 2026

165
Ready for assignment
65
Past assignment date
6
Divisions affected
$184,567
Unassigned task pay
71d
Oldest overdue

Ready tasks by division

016324965Orem6521 odOgden4425 odSalt Lake276 odSt. George197 odCommercial95 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Orem·
Ogden·
Salt Lake··
St. George··
Commercial·
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 22 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl WallsPenetration SealingPorch OSBSet ScaffHousewrapSet Brick ScaffPaper/WireStucco BrownScratch CoatSidingWateringFix ScaffPaintRockBrickSoffit/FasciaGuttersRemove ScaffStucco ColorMisc. WorkInsl AtticFaux ConcreteTotal
Orem··········
Ogden···········
Salt Lake···············
St. George·············
Commercial················
Corporate·····················
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 100 of 165 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionScaffoldingStucco ColorPaper/WireGuttersInsulationHousewrapRockSoffitSidingPaintStucco BrownBrickField OpsAny tradeTotal
Orem····
Ogden·····
Salt Lake········
St. George······
Commercial········
Corporate·············
All divisions

Crews with a hand up — available to that division

DivisionScaffoldingStucco ColorPaper/WireGuttersInsulationHousewrapRockSoffitSidingPaintStucco BrownBrickField OpsAny tradeTotal
Orem····
Ogden···········
Salt Lake······
St. George·············
Commercial···············
Corporate···············
All divisions····

31 crews company-wide have a hand up, counted once per division they cover (40 crew-division slots, of which 9 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Orem — 65 tasks ready for assignment · 21 overdue · $56,990
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
106-Canyon Park-Tri Pointe HomesPaper/WireAug 29, 202627d overdueUnassigned2026-09-03$117✅ 2026-09-03: 15 Days - Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex 2026-09-24 ✅ 2026-08-20:
2024-Wildflower-Toll BrothersFaux ConcreteSep 8, 202617d overdueUnassigned$1,532⭕ 2026-09-16: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-0
2021-Wildflower-Toll BrothersFaux ConcreteSep 8, 202617d overdueUnassigned$1,669⭕ 2026-09-23: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026-
110-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202615d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25
109-Canyon Park-Tri Pointe HomesPaper/WireSep 10, 202615d overdueUnassigned2026-09-02$117✅ 2026-09-11: 8 Days - Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex 2026-09-23
26-Lakeview Fields-Keystone ConstructionStucco ColorSep 17, 20268d overdueUnassigned$1,341✅ 2026-09-21: 2 Days - Waiting on color selection for grout. - Alex 2026-09-23 ✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today unti
Bldg 58-Harmony Ridge-EdgeStucco ColorSep 20, 20265d overdueUnassigned$2,677
718-Highridge-EdgePaper/WireSep 21, 20264d overdueUnassigned2026-09-18$59
2216 (FP)-Wildflower-EdgePaper/WireSep 21, 20264d overdueUnassigned$50
721-Ridgehorne-EdgeHousewrapSep 22, 20263d overdueUnassigned$150⭕ 2026-09-22: Lath delay - good to proceed on lath for stone - missing windows - Jonathan Est End: 2026-09-24
44-Lakeview Fields-Keystone ConstructionPaper/WireSep 22, 20263d overdueUnassigned2026-09-02$1,170⭕ 2026-09-22: Cannot start lath. Missing man door to the side of the garage. - Alex Est End: 2026-09-25
339-Viridian-DR HortonPaper/WireSep 23, 20262d overdueUnassigned$837
Bldg 36-Highridge-EdgePaper/WireSep 23, 20262d overdueUnassigned2026-09-22$1,376
16116-Harmony-Meritage HomesSoffit/FasciaSep 23, 20262d overdueUnassigned$622
518-Ridgeview Cottages-IvoryBrickSep 24, 20261d overdueUnassigned2026-09-14$2,970✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11
525-River Point-EdgePaper/WireSep 24, 20261d overdueUnassigned2026-09-22$50✅ 2026-09-21: 2 Days - We can set staff, but we need to hold off on Weather barrier till further notice - Harrison 2026-09-23
25-Lakeview Fields-Keystone ConstructionRemove ScaffSep 24, 20261d overdueUnassigned$415
1008-Harmony Ridge-EdgeSet ScaffSep 24, 20261d overdueUnassigned$764
519-Ridgeview Cottages-IvorySidingSep 24, 20261d overdueUnassigned2026-09-16$2,545✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15
107-Auburn Springs-EdgeSoffit/FasciaSep 24, 20261d overdueUnassigned$715
16117-Harmony-Meritage HomesStucco BrownSep 24, 20261d overdueUnassigned$153
718-Highridge-EdgeFix ScaffSep 25, 2026todayUnassigned$40Ocupamos areglar el andamio enfrente que removieron los del drywall
518-River Point-EdgeHousewrapSep 25, 2026todayUnassigned$678✅ 2026-09-21: 2 Days - We can set staff, but we need to hold off on Weather barrier till further notice - Harrison 2026-09-23
246-Viridian Plus-DR HortonHousewrapSep 25, 2026todayUnassigned$845
344-Mountain Vista at Sunset Flats-Pulte HomesHousewrapSep 25, 2026todayUnassigned$1,005
518-River Point-EdgePaper/WireSep 25, 2026todayUnassigned2026-09-22$50✅ 2026-09-21: 2 Days - We can set staff, but we need to hold off on Weather barrier till further notice - Harrison 2026-09-23
246-Viridian Plus-DR HortonPaper/WireSep 25, 2026todayUnassigned2026-09-22$63
313-Viridian-DR HortonRemove ScaffSep 25, 2026todayUnassigned$351
710-Highridge-EdgeSet ScaffSep 25, 2026todayUnassigned$671
106-Vista at Harmony Place-WoodsideSidingSep 25, 2026todayUnassigned2026-09-18$1,128
16117-Harmony-Meritage HomesSidingSep 25, 2026todayUnassigned2026-09-23$3,891
109-Canyon Park-Tri Pointe HomesSidingSep 25, 2026todayUnassigned2026-09-14$5,288✅ 2026-09-11: 8 Days - Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex 2026-09-23
518-Ridgeview Cottages-IvorySidingSep 25, 2026todayUnassigned2026-09-22$1,065✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11
16117-Harmony-Meritage HomesSoffit/FasciaSep 25, 2026todayUnassigned$575
719-Highridge-EdgeSet ScaffSep 28, 2026in 3dUnassigned$614
106-Auburn Springs-EdgeSet ScaffSep 28, 2026in 3dUnassigned$958
16116-Harmony-Meritage HomesStucco ColorSep 28, 2026in 3dUnassigned$150
233-Viridian Plus-DR HortonStucco ColorSep 28, 2026in 3dUnassigned$1,183
235-Viridian Plus-DR HortonSet ScaffSep 29, 2026in 4dUnassigned$978
Bldg 59-Harmony Ridge-EdgeSet ScaffSep 29, 2026in 4dUnassigned$1,480
420-Viridian-DR HortonStucco ColorSep 29, 2026in 4dUnassigned$883
518-Ridgeview Cottages-IvoryStucco ColorSep 29, 2026in 4dUnassigned$842✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11
1005-Harmony Ridge-EdgeSet ScaffSep 30, 2026in 5dUnassigned$830
Bldg 35-Highridge-EdgeSet ScaffSep 30, 2026in 5dUnassigned$1,121
106-Vista at Harmony Place-WoodsideStucco ColorSep 30, 2026in 5dUnassigned$640
340-Viridian-DR HortonStucco ColorSep 30, 2026in 5dUnassigned$880
602-River Point-EdgeSet ScaffOct 2, 2026in 7dUnassigned$653
Bldg 56-Viridian Townhomes-DR HortonSet ScaffOct 2, 2026in 7dUnassigned$1,283
714-Highridge-EdgeSet ScaffOct 5, 2026in 10dUnassigned$576
713-Ridgehorne-EdgeSet ScaffOct 6, 2026in 11dUnassigned$829
104-Auburn Springs-EdgeSet ScaffOct 6, 2026in 11dUnassigned$1,029
521-River Point-EdgeSet ScaffOct 6, 2026in 11dUnassigned$766
2210-Wildflower-EdgeSet ScaffOct 6, 2026in 11dUnassigned$585
354-Viridian Emerald-DR HortonSet ScaffOct 7, 2026in 12dUnassigned$0
102-Auburn Springs-EdgeSet ScaffOct 7, 2026in 12dUnassigned$931
605-River Point-EdgeSet ScaffOct 8, 2026in 13dUnassigned$578
110-Auburn Springs-EdgeSet ScaffOct 8, 2026in 13dUnassigned$654
Bldg 39-Highridge-EdgeInsl AtticOct 9, 2026in 14dUnassigned$80
2211-Wildflower-EdgeSet ScaffOct 9, 2026in 14dUnassigned$682
Wellspring Park Restroom-Viridian Townhomes-DR HortonSet ScaffOct 9, 2026in 14dUnassigned$15
143-Auburn Springs-EdgeSet ScaffOct 9, 2026in 14dUnassigned$834
132-Auburn Springs-EdgeSet ScaffOct 9, 2026in 14dUnassigned$797
1022-Harmony Ridge-EdgeSet ScaffOct 9, 2026in 14dUnassigned$829
Bldg 37-Highridge-EdgeInsl AtticNov 3, 2026in 39dUnassigned$80
Bldg 35-Highridge-EdgeInsl AtticNov 13, 2026in 49dUnassigned$80
Ogden — 44 tasks ready for assignment · 25 overdue · $46,056
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
71-Brookfield-LennarGuttersAug 24, 202632d overdueUnassigned$190
63-Brookfield-LennarGuttersAug 24, 202632d overdueUnassigned$265
106-Red Hill-IvorySet Brick ScaffAug 24, 202632d overdueUnassigned$0
1523-Cranefield Estates-IvorySet Brick ScaffAug 26, 202630d overdueUnassigned$134
102-Meadows at Hyde Park-VisionaryBrickSep 11, 202614d overdueUnassigned2026-09-14$736
Units 47-52-Hess Farms-David Weekley HomesSet ScaffSep 11, 202614d overdueUnassigned$1,966⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-23
4-Brynlee Acres-HamletPaintSep 17, 20268d overdueUnassigned$362
5-Valley Meadows-Dixon HomesBrickSep 19, 20266d overdueUnassigned2026-09-23$13,668
176-Mountain Gate-Sierra HomesScratch CoatSep 19, 20266d overdueUnassigned$140
505-Legacy Park-IvoryGuttersSep 21, 20264d overdueUnassigned$197✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
124-Three Farms Jenkins Fields-IvorySet Brick ScaffSep 21, 20264d overdueUnassigned$24
503-Vineyard-VisionaryPaintSep 22, 20263d overdueUnassigned$622
Bldg L-Sugar Creek Townhomes-VisionaryRockSep 22, 20263d overdueUnassigned2026-09-23$530
Bldg 13-Midtown Village-DR HortonBrickSep 23, 20262d overdueUnassigned$6,903
338-Sugar Creek-VisionaryStucco ColorSep 23, 20262d overdueUnassigned$1,028
11-Mountainside Estates-DR HortonGuttersSep 24, 20261d overdueUnassigned$283⭕ 2026-09-19: we are short with thing brick - Jose Est End: 2026-09-30
203-Weber View-IvoryGuttersSep 24, 20261d overdueUnassigned$432
1523-Cranefield Estates-IvoryGuttersSep 24, 20261d overdueUnassigned$382
11-Heritage Parkway-Sierra HomesGuttersSep 24, 20261d overdueUnassigned$236✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
134-Legends Crossing-VisionaryRockSep 24, 20261d overdueUnassigned$198
Bldg F-Legends Crossing Townhomes-VisionaryRockSep 24, 20261d overdueUnassigned$1,030
134-Legends Crossing-VisionaryScratch CoatSep 24, 20261d overdueUnassigned$50
Bldg F-Legends Crossing Townhomes-VisionaryScratch CoatSep 24, 20261d overdueUnassigned$139
221-Stagecoach Estates-McArthurSet ScaffSep 24, 20261d overdueUnassigned$586
102-Meadows at Hyde Park-VisionaryStucco ColorSep 24, 20261d overdueUnassigned$978
107-Stagecoach Estates-McArthurGuttersSep 25, 2026todayUnassigned$255
108-Stagecoach Estates-McArthurGuttersSep 25, 2026todayUnassigned$417
5-Brynlee Acres-HamletGuttersSep 25, 2026todayUnassigned$220✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02
2-Brynlee Acres-HamletGuttersSep 25, 2026todayUnassigned$301
240-Westwood Estates-Meritage HomesHousewrapSep 25, 2026todayUnassigned$960
221-Stagecoach Estates-McArthurHousewrapSep 25, 2026todayUnassigned2026-09-10$588
Bldg 13-Midtown Village-DR HortonPaintSep 25, 2026todayUnassigned$1,207
1715-Cranefield Estates-IvoryPaintSep 25, 2026todayUnassigned$534
Bldg 6-Midtown Village-DR HortonPaintSep 25, 2026todayUnassigned$1,184✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
1712-Cranefield Estates-IvoryPaper/WireSep 25, 2026todayUnassigned2026-09-24$1,247
Bldg 13-Midtown Village-DR HortonWateringSep 25, 2026todayUnassigned$160
56-Cardamine-Sierra HomesGuttersSep 26, 2026in 1dUnassigned$354
521-Vineyard-VisionaryStucco ColorSep 26, 2026in 1dUnassigned$585
216-Sugar Creek-VisionaryStucco ColorSep 27, 2026in 2dUnassigned2026-09-16$1,236
124-Three Farms Jenkins Fields-IvoryPaper/WireSep 28, 2026in 3dUnassigned2026-09-22$1,068
102-Village at Fox Meadows-VisionaryStucco ColorSep 28, 2026in 3dUnassigned$783✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
339-Sugar Creek-VisionaryStucco ColorSep 29, 2026in 4dUnassigned$924
Bldg 13-Midtown Village-DR HortonStucco ColorSep 29, 2026in 4dUnassigned$1,677
176-Mountain Gate-Sierra HomesStucco ColorSep 29, 2026in 4dUnassigned$1,277
Salt Lake — 27 tasks ready for assignment · 6 overdue · $28,917
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
122-Capitol Reef-EdgeStucco ColorSep 22, 20263d overdueUnassigned2026-09-23$953
2927-Mountain Ridge-EdgeHousewrapSep 23, 20262d overdueUnassigned$814⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
2927-Mountain Ridge-EdgePaper/WireSep 23, 20262d overdueUnassigned$63⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
39-Sky Ranch Cascade-WoodsideSoffit/FasciaSep 24, 20261d overdueUnassigned$531
Bldg 21-Solari-EdgeSoffit/FasciaSep 24, 20261d overdueUnassigned$1,970
Bldg 21-Solari-EdgeStucco ColorSep 24, 20261d overdueUnassigned$2,876
357 (FP)-Terraine-Rainey HomesPaper/WireSep 25, 2026todayUnassigned$50
Units 325-330-Enclave at Sky Ranch-WoodsideSoffit/FasciaSep 25, 2026todayUnassigned$2,360
Units 325-330-Enclave at Sky Ranch-WoodsideStucco ColorSep 26, 2026in 1dUnassigned$3,498
154-Pierson Farms-McArthurStucco ColorSep 27, 2026in 2dUnassigned$937
256-Boulder at Sky Ranch-WoodsideStucco ColorSep 27, 2026in 2dUnassigned$914
39-Sky Ranch Cascade-WoodsideStucco ColorSep 28, 2026in 3dUnassigned$827
Bldg 22-Solari-EdgeStucco ColorSep 28, 2026in 3dUnassigned$2,502
104-Creek Ridge Cove-RichmondStucco ColorSep 28, 2026in 3dUnassigned2026-09-23$799
2907-Mountain Ridge-EdgeSet ScaffSep 29, 2026in 4dUnassigned$653
254-Boulder at Sky Ranch-WoodsideStucco ColorSep 29, 2026in 4dUnassigned$996
2904-Mountain Ridge-EdgeSet ScaffOct 1, 2026in 6dUnassigned$747
Bldg 17-Solari-EdgeSet ScaffOct 5, 2026in 10dUnassigned$1,355
Bldg 205-Mountain Ridge-EdgeSet ScaffOct 5, 2026in 10dUnassigned$1,492
Bldg 206-Mountain Ridge-EdgeInsl WallsOct 6, 2026in 11dUnassigned$1,315
2918-Mountain Ridge-EdgeSet ScaffOct 7, 2026in 12dUnassigned$742
Bldg 206-Mountain Ridge-EdgeSet ScaffOct 9, 2026in 14dUnassigned$1,706
Bldg 208-Mountain Ridge-EdgeInsl AtticOct 14, 2026in 19dUnassigned$144
Bldg 22-Solari-EdgeInsl AtticOct 26, 2026in 31dUnassigned$160
Bldg 19-Solari-EdgeInsl AtticNov 3, 2026in 39dUnassigned$192
Bldg 205-Mountain Ridge-EdgeInsl AtticNov 18, 2026in 54dUnassigned$143
Bldg 206-Mountain Ridge-EdgeInsl AtticNov 24, 2026in 60dUnassigned$179
St. George — 19 tasks ready for assignment · 7 overdue · $35,209
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
52-Zion Shores-Split RockRockSep 10, 202615d overdueUnassigned2026-09-21$7,478
33-Black Desert North Village-H2 HomesStucco ColorSep 22, 20263d overdueUnassigned2026-08-17$4,708
4293-Long Valley-DR HortonStucco ColorSep 23, 20262d overdueUnassigned2026-09-24$2,215
4163-Long Valley Rambler-DR HortonHousewrapSep 24, 20261d overdueUnassigned$50
4163-Long Valley Rambler-DR HortonPaper/WireSep 24, 20261d overdueUnassigned$1,367
7-Chelsey-DR HortonPorch OSBSep 24, 20261d overdueUnassigned$25
4163-Long Valley Rambler-DR HortonPorch OSBSep 24, 20261d overdueUnassigned$92
Bldg 132-Long Valley Townhomes-DR HortonPaper/WireSep 25, 2026todayUnassigned$4,618
Bldg 132-Long Valley Townhomes-DR HortonPorch OSBSep 25, 2026todayUnassigned$174
7-Chelsey-DR HortonRemove ScaffSep 25, 2026todayUnassigned$306
4158-Long Valley Rambler-DR HortonRockSep 26, 2026in 1dUnassigned$497⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
4158-Long Valley Rambler-DR HortonScratch CoatSep 26, 2026in 1dUnassigned$59⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
4269-Long Valley-DR HortonScratch CoatSep 26, 2026in 1dUnassigned$107
24-Legacy at Sand Hollow-VisionaryScratch CoatSep 26, 2026in 1dUnassigned$54
24-Legacy at Sand Hollow-VisionarySidingSep 26, 2026in 1dUnassigned2026-09-08$55
4158-Long Valley Rambler-DR HortonStucco BrownSep 26, 2026in 1dUnassigned$1,569⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
24-Legacy at Sand Hollow-VisionaryStucco BrownSep 26, 2026in 1dUnassigned$1,469
4294-Long Valley-DR HortonStucco ColorSep 26, 2026in 1dUnassigned$2,259
114-Desert Color-Split RockStucco ColorSep 29, 2026in 4dUnassigned$8,107
Commercial — 9 tasks ready for assignment · 5 overdue · $17,395
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-RimrockScratch CoatJul 16, 202671d overdueUnassigned$1,811
Bldg RU-1-ARA Southwest-Campbell ConstructionPenetration SealingAug 15, 202641d overdueUnassigned$0
White Dome Chapel-St George-Grass CreekSet ScaffAug 27, 202629d overdueUnassigned$57
Bldg RU-1-ARA Southwest-Campbell ConstructionSet ScaffSep 16, 20269d overdueUnassigned$2,000West Walls Setup
Garage 4-Residence at Millcreek-RimrockRockSep 18, 20267d overdueUnassigned2026-09-02$1,190
Garage 3-Residence at Millcreek-RimrockRockSep 25, 2026todayUnassigned$1,148
Garage 3-Residence at Millcreek-RimrockScratch CoatSep 25, 2026todayUnassigned$127
Garage 3-Residence at Millcreek-RimrockStucco BrownSep 25, 2026todayUnassigned$2,178
Bldg D-Residence at Millcreek-RimrockStucco ColorSep 27, 2026in 2dUnassigned$8,885
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-UnknownMisc. WorkAug 17, 202639d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 299 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: