Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 25, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 24, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 25, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,747 task records pulled, 162 matched the filter · assignment dates Jul 16, 2026 to Nov 24, 2026

162
Ready for assignment
55
Past assignment date
6
Divisions affected
$194,208
Unassigned task pay
71d
Oldest overdue

Ready tasks by division

016314662Orem6220 odOgden5122 odSalt Lake233 odSt. George164 odCommercial95 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Orem·
Ogden·
Salt Lake···
St. George··
Commercial·
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 21 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl WallsPenetration SealingPorch OSBSet ScaffHousewrapSet Brick ScaffPaper/WireStucco BrownScratch CoatSidingWateringPaintRockBrickSoffit/FasciaGuttersRemove ScaffStucco ColorMisc. WorkInsl AtticFaux ConcreteTotal
Orem··········
Ogden········
Salt Lake··············
St. George·············
Commercial···············
Corporate····················
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 102 of 162 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionScaffoldingStucco ColorPaper/WireGuttersRockInsulationSidingStucco BrownPaintHousewrapBrickSoffitField OpsAny tradeTotal
Orem····
Ogden····
Salt Lake········
St. George·······
Commercial········
Corporate·············
All divisions

Crews with a hand up — available to that division

DivisionScaffoldingStucco ColorPaper/WireGuttersRockInsulationSidingStucco BrownPaintHousewrapBrickSoffitField OpsAny tradeTotal
Orem·····
Ogden···········
Salt Lake·········
St. George·············
Commercial···············
Corporate···············
All divisions····

20 crews company-wide have a hand up, counted once per division they cover (27 crew-division slots, of which 7 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Orem — 62 tasks ready for assignment · 20 overdue · $61,413
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
106-Canyon Park-Tri Pointe Homes Paper/WireAug 29, 202627d overdueUnassigned2026-09-03$117✅ 2026-09-03: 15 Days - Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex 2026-09-24 ✅ 2026-08-20:
2024-Wildflower-Toll Brothers Faux ConcreteSep 8, 202617d overdueUnassigned$1,532⭕ 2026-09-16: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-0
2021-Wildflower-Toll Brothers Faux ConcreteSep 8, 202617d overdueUnassigned$1,669⭕ 2026-09-23: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026-
110-Canyon Park-Tri Pointe Homes Paper/WireSep 10, 202615d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25
109-Canyon Park-Tri Pointe Homes Paper/WireSep 10, 202615d overdueUnassigned2026-09-02$117✅ 2026-09-11: 8 Days - Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex 2026-09-23
26-Lakeview Fields-Keystone Construction Stucco ColorSep 17, 20268d overdueUnassigned$1,341✅ 2026-09-21: 2 Days - Waiting on color selection for grout. - Alex 2026-09-23 ✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today unti
Bldg 58-Harmony Ridge-Edge Stucco ColorSep 20, 20265d overdueUnassigned$2,677
718-Highridge-Edge Paper/WireSep 21, 20264d overdueUnassigned2026-09-18$59
2216 (FP)-Wildflower-Edge Paper/WireSep 21, 20264d overdueUnassigned$50
44-Lakeview Fields-Keystone Construction Paper/WireSep 22, 20263d overdueUnassigned2026-09-02$1,170⭕ 2026-09-22: Cannot start lath. Missing man door to the side of the garage. - Alex Est End: 2026-09-25
339-Viridian-DR Horton Paper/WireSep 23, 20262d overdueUnassigned$837
Bldg 36-Highridge-Edge Paper/WireSep 23, 20262d overdueUnassigned2026-09-22$1,376
523-River Point-Edge RockSep 23, 20262d overdueUnassigned2026-09-22$552
16116-Harmony-Meritage Homes Soffit/FasciaSep 23, 20262d overdueUnassigned$622
518-Ridgeview Cottages-Ivory BrickSep 24, 20261d overdueUnassigned2026-09-14$2,970✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11
525-River Point-Edge Paper/WireSep 24, 20261d overdueUnassigned2026-09-25$50✅ 2026-09-21: 2 Days - We can set staff, but we need to hold off on Weather barrier till further notice - Harrison 2026-09-23
25-Lakeview Fields-Keystone Construction Remove ScaffSep 24, 20261d overdueUnassigned$415
1008-Harmony Ridge-Edge Set ScaffSep 24, 20261d overdueUnassigned$764
519-Ridgeview Cottages-Ivory SidingSep 24, 20261d overdueUnassigned2026-09-16$2,545✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15
16117-Harmony-Meritage Homes Stucco BrownSep 24, 20261d overdueUnassigned$153
518-River Point-Edge Paper/WireSep 25, 2026todayUnassigned2026-09-22$50✅ 2026-09-21: 2 Days - We can set staff, but we need to hold off on Weather barrier till further notice - Harrison 2026-09-23
246-Viridian Plus-DR Horton Paper/WireSep 25, 2026todayUnassigned2026-09-22$63
519-River Point-Edge Paper/WireSep 25, 2026todayUnassigned2026-09-24$64
313-Viridian-DR Horton Remove ScaffSep 25, 2026todayUnassigned$351
710-Highridge-Edge Set ScaffSep 25, 2026todayUnassigned$671
106-Vista at Harmony Place-Woodside SidingSep 25, 2026todayUnassigned2026-09-18$1,128
16117-Harmony-Meritage Homes SidingSep 25, 2026todayUnassigned2026-09-23$3,891
109-Canyon Park-Tri Pointe Homes SidingSep 25, 2026todayUnassigned2026-09-14$5,288✅ 2026-09-11: 8 Days - Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex 2026-09-23
2228-Wildflower-Edge Soffit/FasciaSep 25, 2026todayUnassigned$658
16117-Harmony-Meritage Homes Soffit/FasciaSep 25, 2026todayUnassigned$575
Units 481-485-Regency at Meadowbrook-Woodside SidingSep 26, 2026in 1dUnassigned2026-09-18$5,332
Units 481-485-Regency at Meadowbrook-Woodside Stucco BrownSep 26, 2026in 1dUnassigned$2,892
719-Highridge-Edge Set ScaffSep 28, 2026in 3dUnassigned$614
106-Auburn Springs-Edge Set ScaffSep 28, 2026in 3dUnassigned$958
16116-Harmony-Meritage Homes Stucco ColorSep 28, 2026in 3dUnassigned$150
233-Viridian Plus-DR Horton Stucco ColorSep 28, 2026in 3dUnassigned$1,183
235-Viridian Plus-DR Horton Set ScaffSep 29, 2026in 4dUnassigned$978
Bldg 59-Harmony Ridge-Edge Set ScaffSep 29, 2026in 4dUnassigned$1,480
420-Viridian-DR Horton Stucco ColorSep 29, 2026in 4dUnassigned$883
518-Ridgeview Cottages-Ivory Stucco ColorSep 29, 2026in 4dUnassigned$842✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11
1005-Harmony Ridge-Edge Set ScaffSep 30, 2026in 5dUnassigned$830
Bldg 35-Highridge-Edge Set ScaffSep 30, 2026in 5dUnassigned$1,121
106-Vista at Harmony Place-Woodside Stucco ColorSep 30, 2026in 5dUnassigned$640
340-Viridian-DR Horton Stucco ColorSep 30, 2026in 5dUnassigned$880
602-River Point-Edge Set ScaffOct 2, 2026in 7dUnassigned$653
Bldg 56-Viridian Townhomes-DR Horton Set ScaffOct 2, 2026in 7dUnassigned$1,283
714-Highridge-Edge Set ScaffOct 5, 2026in 10dUnassigned$576
713-Ridgehorne-Edge Set ScaffOct 6, 2026in 11dUnassigned$829
104-Auburn Springs-Edge Set ScaffOct 6, 2026in 11dUnassigned$1,029
521-River Point-Edge Set ScaffOct 6, 2026in 11dUnassigned$766
2210-Wildflower-Edge Set ScaffOct 6, 2026in 11dUnassigned$585
354-Viridian Emerald-DR Horton Set ScaffOct 7, 2026in 12dUnassigned$0
102-Auburn Springs-Edge Set ScaffOct 7, 2026in 12dUnassigned$931
110-Auburn Springs-Edge Set ScaffOct 8, 2026in 13dUnassigned$654
Bldg 39-Highridge-Edge Insl AtticOct 9, 2026in 14dUnassigned$80
2211-Wildflower-Edge Set ScaffOct 9, 2026in 14dUnassigned$682
Wellspring Park Restroom-Viridian Townhomes-DR Horton Set ScaffOct 9, 2026in 14dUnassigned$15
143-Auburn Springs-Edge Set ScaffOct 9, 2026in 14dUnassigned$834
132-Auburn Springs-Edge Set ScaffOct 9, 2026in 14dUnassigned$797
1022-Harmony Ridge-Edge Set ScaffOct 9, 2026in 14dUnassigned$829
Bldg 37-Highridge-Edge Insl AtticNov 3, 2026in 39dUnassigned$80
Bldg 35-Highridge-Edge Insl AtticNov 13, 2026in 49dUnassigned$80
Ogden — 51 tasks ready for assignment · 22 overdue · $56,906
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
71-Brookfield-Lennar GuttersAug 24, 202632d overdueUnassigned$190
63-Brookfield-Lennar GuttersAug 24, 202632d overdueUnassigned$265
106-Red Hill-Ivory Set Brick ScaffAug 24, 202632d overdueUnassigned$0
1523-Cranefield Estates-Ivory Set Brick ScaffAug 26, 202630d overdueUnassigned$134
102-Meadows at Hyde Park-Visionary BrickSep 11, 202614d overdueUnassigned2026-09-14$736
Units 47-52-Hess Farms-David Weekley Homes Set ScaffSep 11, 202614d overdueUnassigned$1,966⭕ 2026-09-11: Wait for house wrap inspection - Alexander Est End: 2026-09-23
4-Brynlee Acres-Hamlet PaintSep 17, 20268d overdueUnassigned$362
5-Valley Meadows-Dixon Homes BrickSep 19, 20266d overdueUnassigned2026-09-23$13,668
176-Mountain Gate-Sierra Homes Scratch CoatSep 19, 20266d overdueUnassigned$140
505-Legacy Park-Ivory GuttersSep 21, 20264d overdueUnassigned$197✅ 2026-09-02: 1 Days - Inspection delayed. - Erik 2026-09-03
503-Vineyard-Visionary PaintSep 22, 20263d overdueUnassigned$622
Bldg L-Sugar Creek Townhomes-Visionary RockSep 22, 20263d overdueUnassigned2026-09-23$530
338-Sugar Creek-Visionary Stucco ColorSep 23, 20262d overdueUnassigned$1,028
11-Mountainside Estates-DR Horton GuttersSep 24, 20261d overdueUnassigned$283⭕ 2026-09-19: we are short with thing brick - Jose Est End: 2026-09-30
203-Weber View-Ivory GuttersSep 24, 20261d overdueUnassigned$432
1523-Cranefield Estates-Ivory GuttersSep 24, 20261d overdueUnassigned$382
11-Heritage Parkway-Sierra Homes GuttersSep 24, 20261d overdueUnassigned$236✅ 2026-08-22: Material Delay - We still don’t have vinyl materials - Jose 2026-09-07
134-Legends Crossing-Visionary RockSep 24, 20261d overdueUnassigned$198
Bldg F-Legends Crossing Townhomes-Visionary RockSep 24, 20261d overdueUnassigned$1,030
134-Legends Crossing-Visionary Scratch CoatSep 24, 20261d overdueUnassigned$50
Bldg F-Legends Crossing Townhomes-Visionary Scratch CoatSep 24, 20261d overdueUnassigned$139
102-Meadows at Hyde Park-Visionary Stucco ColorSep 24, 20261d overdueUnassigned$978
107-Stagecoach Estates-McArthur GuttersSep 25, 2026todayUnassigned$255
108-Stagecoach Estates-McArthur GuttersSep 25, 2026todayUnassigned$417
5-Brynlee Acres-Hamlet GuttersSep 25, 2026todayUnassigned$220✅ 2026-08-31: 2 Days - they need to stack the drywall first - Jose 2026-09-02
2-Brynlee Acres-Hamlet GuttersSep 25, 2026todayUnassigned$301
221-Stagecoach Estates-McArthur HousewrapSep 25, 2026todayUnassigned2026-09-10$588
Bldg 13-Midtown Village-DR Horton PaintSep 25, 2026todayUnassigned$1,207
1715-Cranefield Estates-Ivory PaintSep 25, 2026todayUnassigned$534
Bldg 6-Midtown Village-DR Horton PaintSep 25, 2026todayUnassigned$1,184✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
1712-Cranefield Estates-Ivory Paper/WireSep 25, 2026todayUnassigned2026-09-24$1,247
52-Mountainside Estates-DR Horton Paper/WireSep 25, 2026todayUnassigned2026-09-10$959
106-Seasons at Taylor Landing-Richmond Remove ScaffSep 25, 2026todayUnassigned$0
716-Ridgeline Park-Visionary Set ScaffSep 25, 2026todayUnassigned$399⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30
709-Ridgeline Park-Visionary Set ScaffSep 25, 2026todayUnassigned$718⭕ 2026-09-17: they want to do the flat work first - Jose Est End: 2026-09-30
107-Village at Fox Meadows-Visionary Set ScaffSep 25, 2026todayUnassigned$446⭕ 2026-09-15: We can start this job on this date because they stills has the porch cap missing - Jose Est End: 2026-09-24
716-Ridgeline Park-Visionary SidingSep 25, 2026todayUnassigned2026-09-23$1,893⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30
107-Village at Fox Meadows-Visionary SidingSep 25, 2026todayUnassigned2026-09-16$1,217⭕ 2026-09-15: We can start this job on this date because they stills has the porch cap missing - Jose Est End: 2026-09-24
Bldg 13-Midtown Village-DR Horton WateringSep 25, 2026todayUnassigned$160
Units 1-6-VTG-Sierra Homes BrickSep 26, 2026in 1dUnassigned$7,581
56-Cardamine-Sierra Homes GuttersSep 26, 2026in 1dUnassigned$354
116-Meadows at Hyde Park-Visionary GuttersSep 26, 2026in 1dUnassigned$486
13-Mountainside Estates-DR Horton HousewrapSep 26, 2026in 1dUnassigned$50
52-Mountainside Estates-DR Horton HousewrapSep 26, 2026in 1dUnassigned$286
Units 1-6-VTG-Sierra Homes RockSep 26, 2026in 1dUnassigned2026-09-22$6,356
521-Vineyard-Visionary Stucco ColorSep 26, 2026in 1dUnassigned$585
216-Sugar Creek-Visionary Stucco ColorSep 27, 2026in 2dUnassigned2026-09-16$1,236
102-Village at Fox Meadows-Visionary Stucco ColorSep 28, 2026in 3dUnassigned$783✅ 2026-08-31: 3 Days - they need to do the concrete stoops first - Jose 2026-09-03
339-Sugar Creek-Visionary Stucco ColorSep 29, 2026in 4dUnassigned$924
Bldg 13-Midtown Village-DR Horton Stucco ColorSep 29, 2026in 4dUnassigned$1,677
176-Mountain Gate-Sierra Homes Stucco ColorSep 29, 2026in 4dUnassigned$1,277
Salt Lake — 23 tasks ready for assignment · 3 overdue · $24,795
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
2927-Mountain Ridge-Edge HousewrapSep 23, 20262d overdueUnassigned$814⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
2927-Mountain Ridge-Edge Paper/WireSep 23, 20262d overdueUnassigned$63⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
Bldg 21-Solari-Edge Stucco ColorSep 24, 20261d overdueUnassigned$2,876
Bldg 203-Mountain Ridge-Edge RockSep 26, 2026in 1dUnassigned$1,742
Units 325-330-Enclave at Sky Ranch-Woodside Stucco ColorSep 26, 2026in 1dUnassigned$3,498
154-Pierson Farms-McArthur Stucco ColorSep 27, 2026in 2dUnassigned$937
256-Boulder at Sky Ranch-Woodside Stucco ColorSep 27, 2026in 2dUnassigned$914
39-Sky Ranch Cascade-Woodside Stucco ColorSep 28, 2026in 3dUnassigned$827
Bldg 22-Solari-Edge Stucco ColorSep 28, 2026in 3dUnassigned$2,502
104-Creek Ridge Cove-Richmond Stucco ColorSep 28, 2026in 3dUnassigned2026-09-23$799
2907-Mountain Ridge-Edge Set ScaffSep 29, 2026in 4dUnassigned$653
254-Boulder at Sky Ranch-Woodside Stucco ColorSep 29, 2026in 4dUnassigned$996
2904-Mountain Ridge-Edge Set ScaffOct 1, 2026in 6dUnassigned$747
Bldg 17-Solari-Edge Set ScaffOct 5, 2026in 10dUnassigned$1,355
Bldg 205-Mountain Ridge-Edge Set ScaffOct 5, 2026in 10dUnassigned$1,492
Bldg 206-Mountain Ridge-Edge Insl WallsOct 6, 2026in 11dUnassigned$1,315
2918-Mountain Ridge-Edge Set ScaffOct 7, 2026in 12dUnassigned$742
Bldg 206-Mountain Ridge-Edge Set ScaffOct 9, 2026in 14dUnassigned$1,706
Bldg 208-Mountain Ridge-Edge Insl AtticOct 14, 2026in 19dUnassigned$144
Bldg 22-Solari-Edge Insl AtticOct 26, 2026in 31dUnassigned$160
Bldg 19-Solari-Edge Insl AtticNov 3, 2026in 39dUnassigned$192
Bldg 205-Mountain Ridge-Edge Insl AtticNov 18, 2026in 54dUnassigned$143
Bldg 206-Mountain Ridge-Edge Insl AtticNov 24, 2026in 60dUnassigned$179
St. George — 16 tasks ready for assignment · 4 overdue · $33,700
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
52-Zion Shores-Split Rock RockSep 10, 202615d overdueUnassigned2026-09-21$7,478
33-Black Desert North Village-H2 Homes Stucco ColorSep 22, 20263d overdueUnassigned2026-08-17$4,708
4293-Long Valley-DR Horton Stucco ColorSep 23, 20262d overdueUnassigned2026-09-24$2,215
7-Chelsey-DR Horton Porch OSBSep 24, 20261d overdueUnassigned$25
Bldg 132-Long Valley Townhomes-DR Horton Paper/WireSep 25, 2026todayUnassigned$4,618
Bldg 132-Long Valley Townhomes-DR Horton Porch OSBSep 25, 2026todayUnassigned$174
7-Chelsey-DR Horton Remove ScaffSep 25, 2026todayUnassigned$306
4158-Long Valley Rambler-DR Horton RockSep 26, 2026in 1dUnassigned$497⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
4158-Long Valley Rambler-DR Horton Scratch CoatSep 26, 2026in 1dUnassigned$59⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
4269-Long Valley-DR Horton Scratch CoatSep 26, 2026in 1dUnassigned$107
24-Legacy at Sand Hollow-Visionary Scratch CoatSep 26, 2026in 1dUnassigned$54
24-Legacy at Sand Hollow-Visionary SidingSep 26, 2026in 1dUnassigned2026-09-08$55
4158-Long Valley Rambler-DR Horton Stucco BrownSep 26, 2026in 1dUnassigned$1,569⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25
24-Legacy at Sand Hollow-Visionary Stucco BrownSep 26, 2026in 1dUnassigned$1,469
4294-Long Valley-DR Horton Stucco ColorSep 26, 2026in 1dUnassigned$2,259
114-Desert Color-Split Rock Stucco ColorSep 29, 2026in 4dUnassigned$8,107
Commercial — 9 tasks ready for assignment · 5 overdue · $17,395
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-Rimrock Scratch CoatJul 16, 202671d overdueUnassigned$1,811
Bldg RU-1-ARA Southwest-Campbell Construction Penetration SealingAug 15, 202641d overdueUnassigned$0
White Dome Chapel-St George-Grass Creek Set ScaffAug 27, 202629d overdueUnassigned$57
Bldg RU-1-ARA Southwest-Campbell Construction Set ScaffSep 16, 20269d overdueUnassigned$2,000West Walls Setup
Garage 4-Residence at Millcreek-Rimrock RockSep 18, 20267d overdueUnassigned2026-09-02$1,190
Garage 3-Residence at Millcreek-Rimrock RockSep 25, 2026todayUnassigned$1,148
Garage 3-Residence at Millcreek-Rimrock Scratch CoatSep 25, 2026todayUnassigned$127
Garage 3-Residence at Millcreek-Rimrock Stucco BrownSep 25, 2026todayUnassigned$2,178
Bldg D-Residence at Millcreek-Rimrock Stucco ColorSep 27, 2026in 2dUnassigned$8,885
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown Misc. WorkAug 17, 202639d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 299 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: