Every division. Tasks with an assignment date set but no team assigned and not yet completed.
Generated Sep 28, 2026 · Go to the current version →
This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.
● All 6 divisions, not just yours — the
division scoping is removed.
● No 7-day cap. The division view only shows assignments due
inside a week; this carries the whole book — the overdue tail reaching back to
Jul 16, 2026 and forward assignments out to Nov 24, 2026.
● Delayed assignments are not excluded. The division view drops
tasks flagged Task Assignment Is Delayed; that field is not available to this
report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to
active jobs, so an unassigned task on a finaled job shows in your division view and
not here — the one direction where your view is larger than this
report.
Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.
Generated Sep 28, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,821 task records pulled, 158 matched the filter · assignment dates Jul 16, 2026 to Nov 24, 2026
past assignment date due today or upcoming
Click any number to see the tasks behind it. Esc closes.
| Division | Overdue 30+ days | Overdue 8-30 days | Overdue 1-7 days | Due today | Next 7 days | Beyond 7 days | Total |
|---|---|---|---|---|---|---|---|
| Orem | · | ||||||
| Ogden | · | ||||||
| Salt Lake | · | · | |||||
| St. George | · | · | · | ||||
| Commercial | · | · | · | ||||
| Corporate | · | · | · | · | · | ||
| All divisions |
Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 21 task types.
Click any number to see the tasks behind it. Esc closes.
| Division | Insl Walls | Penetration Sealing | Porch OSB | Set Scaff | Housewrap | Set Brick Scaff | Paper/Wire | Stucco Brown | Scratch Coat | Siding | Watering | Paint | Rock | Brick | Soffit/Fascia | Gutters | Remove Scaff | Stucco Color | Misc. Work | Insl Attic | Faux Concrete | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | · | · | · | · | · | · | · | ||||||||||||
| Ogden | · | · | · | · | · | · | · | |||||||||||||||
| Salt Lake | · | · | · | · | · | · | · | · | · | · | · | · | ||||||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | |||||||||||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions |
Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 109 of 158 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.
Click any number to see the tasks — or the crews — behind it. Esc closes.
Tasks needing assignment
| Division | Scaffolding | Stucco Color | Paper/Wire | Gutters | Insulation | Paint | Rock | Siding | Housewrap | Soffit | Stucco Brown | Brick | Field Ops | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | · | |||||||||||
| Ogden | · | · | · | ||||||||||||
| Salt Lake | · | · | · | · | · | · | |||||||||
| St. George | · | · | · | · | · | ||||||||||
| Commercial | · | · | · | · | · | · | · | · | · | ||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions |
Crews with a hand up — available to that division
| Division | Scaffolding | Stucco Color | Paper/Wire | Gutters | Insulation | Paint | Rock | Siding | Housewrap | Soffit | Stucco Brown | Brick | Field Ops | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | · | · | ||||||||||
| Ogden | · | · | · | · | · | · | · | · | · | · | · | ||||
| Salt Lake | · | · | · | · | · | · | · | ||||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| All divisions | · | · | · | · | · |
31 crews company-wide have a hand up, counted once per division they cover (46 crew-division slots, of which 15 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.
Click a division to see the underlying tasks, oldest assignment date first.
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 2024-Wildflower-Toll Brothers | Faux Concrete | Sep 8, 2026 | 20d overdue | Unassigned | $1,532 | ⭕ 2026-09-16: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-0 | |
| 2021-Wildflower-Toll Brothers | Faux Concrete | Sep 8, 2026 | 20d overdue | Unassigned | $1,669 | ⭕ 2026-09-23: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026- | |
| 110-Canyon Park-Tri Pointe Homes | Paper/Wire | Sep 10, 2026 | 18d overdue | Unassigned | 2026-09-01 | $173 | ⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-25 |
| 345-Mountain Vista at Sunset Flats-Pulte Homes | Paper/Wire | Sep 10, 2026 | 18d overdue | In Progress | 2026-09-09 | $1,414 | ✅ 2026-09-11: 9 Days - We can’t not lath this job to when I pass Housewrap inspections it’s not ready for lath and I have to do at vpo when it’s ready for the Housewrap to comeback |
| 26-Lakeview Fields-Keystone Construction | Stucco Color | Sep 17, 2026 | 11d overdue | Unassigned | $1,341 | ✅ 2026-09-21: 2 Days - Waiting on color selection for grout. - Alex 2026-09-23 ✅ 2026-09-15: 2 Days - Windows are getting moved around the home. We will not start stucco today unti | |
| 718-Highridge-Edge | Paper/Wire | Sep 21, 2026 | 7d overdue | Unassigned | 2026-09-18 | $59 | |
| 2216 (FP)-Wildflower-Edge | Paper/Wire | Sep 21, 2026 | 7d overdue | Unassigned | $50 | ||
| 44-Lakeview Fields-Keystone Construction | Paper/Wire | Sep 22, 2026 | 6d overdue | Unassigned | 2026-09-02 | $1,170 | ⭕ 2026-09-22: Cannot start lath. Missing man door to the side of the garage. - Alex Est End: 2026-09-29 |
| 16116-Harmony-Meritage Homes | Soffit/Fascia | Sep 23, 2026 | 5d overdue | Unassigned | $622 | ||
| 1008-Harmony Ridge-Edge | Set Scaff | Sep 24, 2026 | 4d overdue | Unassigned | $764 | ||
| 519-Ridgeview Cottages-Ivory | Siding | Sep 24, 2026 | 4d overdue | Unassigned | 2026-09-16 | $2,545 | ✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15 |
| 16117-Harmony-Meritage Homes | Stucco Brown | Sep 24, 2026 | 4d overdue | Unassigned | $153 | ||
| 335-Mountain Vista at Sunset Flats-Pulte Homes | Housewrap | Sep 25, 2026 | 3d overdue | Unassigned | $1,035 | ||
| 313-Viridian-DR Horton | Remove Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $351 | ||
| 710-Highridge-Edge | Set Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $671 | ||
| 16117-Harmony-Meritage Homes | Soffit/Fascia | Sep 25, 2026 | 3d overdue | Unassigned | $575 | ||
| 518-Ridgeview Cottages-Ivory | Brick | Sep 26, 2026 | 2d overdue | Unassigned | 2026-09-14 | $2,970 | ✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11 |
| 2228-Wildflower-Edge | Remove Scaff | Sep 26, 2026 | 2d overdue | Unassigned | $444 | ||
| 107-Auburn Springs-Edge | Remove Scaff | Sep 26, 2026 | 2d overdue | Unassigned | $462 | ||
| 914-Broadview Shores-Ivory | Remove Scaff | Sep 27, 2026 | 1d overdue | Unassigned | $485 | ⭕ 2026-09-23: Material Delay - Waiting on stone trimmers and light boxes to arrive - Alex Est End: 2026-09-28 | |
| 719-Highridge-Edge | Set Scaff | Sep 28, 2026 | today | Unassigned | $614 | ||
| 106-Auburn Springs-Edge | Set Scaff | Sep 28, 2026 | today | Unassigned | $958 | ||
| 16116-Harmony-Meritage Homes | Stucco Color | Sep 28, 2026 | today | Unassigned | $150 | ||
| 233-Viridian Plus-DR Horton | Stucco Color | Sep 28, 2026 | today | Unassigned | $1,183 | ||
| 235-Viridian Plus-DR Horton | Set Scaff | Sep 29, 2026 | in 1d | Unassigned | $978 | ||
| Bldg 59-Harmony Ridge-Edge | Set Scaff | Sep 29, 2026 | in 1d | Unassigned | $1,480 | ||
| 420-Viridian-DR Horton | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $883 | ||
| 518-Ridgeview Cottages-Ivory | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $842 | ✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11 | |
| 1005-Harmony Ridge-Edge | Set Scaff | Sep 30, 2026 | in 2d | Unassigned | $830 | ||
| Bldg 35-Highridge-Edge | Set Scaff | Sep 30, 2026 | in 2d | Unassigned | $1,121 | ||
| 106-Vista at Harmony Place-Woodside | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $640 | ||
| 234-Viridian Plus-DR Horton | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $1,008 | ||
| 340-Viridian-DR Horton | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $880 | ||
| Units 481-485-Regency at Meadowbrook-Woodside | Stucco Color | Oct 1, 2026 | in 3d | Unassigned | $2,545 | ||
| Bldg 56-Harmony Ridge-Edge | Stucco Color | Oct 1, 2026 | in 3d | Unassigned | $3,142 | ||
| 602-River Point-Edge | Set Scaff | Oct 2, 2026 | in 4d | Unassigned | $653 | ||
| Bldg 56-Viridian Townhomes-DR Horton | Set Scaff | Oct 2, 2026 | in 4d | Unassigned | $1,283 | ||
| 714-Highridge-Edge | Set Scaff | Oct 5, 2026 | in 7d | Unassigned | $576 | ||
| 713-Ridgehorne-Edge | Set Scaff | Oct 6, 2026 | in 8d | Unassigned | $829 | ||
| 104-Auburn Springs-Edge | Set Scaff | Oct 6, 2026 | in 8d | Unassigned | $1,029 | ||
| 521-River Point-Edge | Set Scaff | Oct 6, 2026 | in 8d | Unassigned | $766 | ||
| 2210-Wildflower-Edge | Set Scaff | Oct 6, 2026 | in 8d | Unassigned | $585 | ||
| 354-Viridian Emerald-DR Horton | Set Scaff | Oct 7, 2026 | in 9d | Unassigned | $0 | ||
| 102-Auburn Springs-Edge | Set Scaff | Oct 7, 2026 | in 9d | Unassigned | $931 | ||
| 605-River Point-Edge | Set Scaff | Oct 8, 2026 | in 10d | Unassigned | $578 | ||
| 110-Auburn Springs-Edge | Set Scaff | Oct 8, 2026 | in 10d | Unassigned | $654 | ||
| Bldg 39-Highridge-Edge | Insl Attic | Oct 9, 2026 | in 11d | Unassigned | $80 | ||
| 132-Auburn Springs-Edge | Set Scaff | Oct 9, 2026 | in 11d | Unassigned | $797 | ||
| 516-River Point-Edge | Set Scaff | Oct 12, 2026 | in 14d | Unassigned | $719 | ||
| 2190-Wildflower-Edge | Set Scaff | Oct 12, 2026 | in 14d | Unassigned | $772 | ||
| 515-River Point-Edge | Set Scaff | Oct 12, 2026 | in 14d | Unassigned | $730 | ||
| Bldg 37-Highridge-Edge | Insl Attic | Nov 3, 2026 | in 36d | Unassigned | $80 | ||
| Bldg 35-Highridge-Edge | Insl Attic | Nov 13, 2026 | in 46d | Unassigned | $80 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 71-Brookfield-Lennar | Gutters | Aug 24, 2026 | 35d overdue | Unassigned | $190 | ||
| 63-Brookfield-Lennar | Gutters | Aug 24, 2026 | 35d overdue | Unassigned | $265 | ||
| 106-Red Hill-Ivory | Set Brick Scaff | Aug 24, 2026 | 35d overdue | Unassigned | $0 | ||
| 1523-Cranefield Estates-Ivory | Set Brick Scaff | Aug 26, 2026 | 33d overdue | Unassigned | $134 | ||
| 102-Meadows at Hyde Park-Visionary | Brick | Sep 11, 2026 | 17d overdue | Unassigned | 2026-09-14 | $736 | |
| Units 47-52-Hess Farms-David Weekley Homes | Set Scaff | Sep 11, 2026 | 17d overdue | Unassigned | $1,966 | ⭕ 2026-09-22: Builders requested us to wait for scaffold until dry wall gets delivered - Alexander Est End: 2026-09-29 ⭕ 2026-09-11: Wait for house wrap inspection - Alexander Es | |
| 176-Mountain Gate-Sierra Homes | Scratch Coat | Sep 19, 2026 | 9d overdue | Unassigned | $140 | ||
| 503-Vineyard-Visionary | Paint | Sep 22, 2026 | 6d overdue | Unassigned | $622 | ||
| Bldg L-Sugar Creek Townhomes-Visionary | Rock | Sep 22, 2026 | 6d overdue | Unassigned | 2026-09-23 | $530 | |
| Pope Residence Remodel-Custom Jobs (Ogden)-Owner Builder | Paper/Wire | Sep 23, 2026 | 5d overdue | Unassigned | $938 | ||
| 11-Mountainside Estates-DR Horton | Gutters | Sep 24, 2026 | 4d overdue | Unassigned | $283 | ⭕ 2026-09-19: we are short with thing brick - Jose Est End: 2026-09-30 | |
| 203-Weber View-Ivory | Gutters | Sep 24, 2026 | 4d overdue | Unassigned | $432 | ||
| 102-Meadows at Hyde Park-Visionary | Stucco Color | Sep 24, 2026 | 4d overdue | Unassigned | $978 | ||
| 107-Stagecoach Estates-McArthur | Gutters | Sep 25, 2026 | 3d overdue | Unassigned | $255 | ||
| 126-Red Hill-Ivory | Paint | Sep 25, 2026 | 3d overdue | Unassigned | $928 | ||
| Bldg 13-Midtown Village-DR Horton | Paint | Sep 25, 2026 | 3d overdue | Unassigned | $1,207 | ||
| 1715-Cranefield Estates-Ivory | Paint | Sep 25, 2026 | 3d overdue | Unassigned | $534 | ||
| 106-Seasons at Taylor Landing-Richmond | Remove Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $0 | ||
| 103-Stagecoach Estates-McArthur | Set Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $581 | ||
| 716-Ridgeline Park-Visionary | Set Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $399 | ⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30 | |
| 709-Ridgeline Park-Visionary | Set Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $718 | ⭕ 2026-09-17: they want to do the flat work first - Jose Est End: 2026-09-30 | |
| 107-Village at Fox Meadows-Visionary | Set Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $446 | ✅ 2026-09-15: 7 Days - We can start this job on this date because they stills has the porch cap missing - Jose 2026-09-24 | |
| 716-Ridgeline Park-Visionary | Siding | Sep 25, 2026 | 3d overdue | Unassigned | 2026-09-23 | $1,893 | ⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30 |
| 107-Village at Fox Meadows-Visionary | Siding | Sep 25, 2026 | 3d overdue | Unassigned | 2026-09-16 | $1,217 | ✅ 2026-09-15: 7 Days - We can start this job on this date because they stills has the porch cap missing - Jose 2026-09-24 |
| 102-Meadows at Hyde Park-Visionary | Soffit/Fascia | Sep 25, 2026 | 3d overdue | Unassigned | $880 | ||
| Bldg 13-Midtown Village-DR Horton | Watering | Sep 25, 2026 | 3d overdue | Unassigned | $160 | ||
| Units 1-6-VTG-Sierra Homes | Brick | Sep 26, 2026 | 2d overdue | Unassigned | $7,581 | ||
| 103-Stagecoach Estates-McArthur | Housewrap | Sep 26, 2026 | 2d overdue | Unassigned | $594 | ||
| 13-Mountainside Estates-DR Horton | Housewrap | Sep 26, 2026 | 2d overdue | Unassigned | $50 | ||
| 134-Legends Crossing-Visionary | Paint | Sep 26, 2026 | 2d overdue | Unassigned | $77 | ||
| 1523-Cranefield Estates-Ivory | Remove Scaff | Sep 26, 2026 | 2d overdue | Unassigned | $341 | ||
| Units 1-6-VTG-Sierra Homes | Rock | Sep 26, 2026 | 2d overdue | Unassigned | 2026-09-25 | $6,356 | |
| 515-Vineyard-Visionary | Soffit/Fascia | Sep 26, 2026 | 2d overdue | Unassigned | $563 | ||
| 521-Vineyard-Visionary | Stucco Color | Sep 26, 2026 | 2d overdue | Unassigned | $585 | ||
| 105-Palomino-DR Horton | Watering | Sep 26, 2026 | 2d overdue | Unassigned | $94 | ||
| 237-Westwood Estates-Meritage Homes | Housewrap | Sep 27, 2026 | 1d overdue | Unassigned | $722 | ||
| 216-Sugar Creek-Visionary | Stucco Color | Sep 27, 2026 | 1d overdue | Unassigned | 2026-09-16 | $1,236 | |
| 72-Brookfield-Lennar | Gutters | Sep 28, 2026 | today | Unassigned | $261 | ||
| 241-Westwood Estates-Meritage Homes | Gutters | Sep 28, 2026 | today | Unassigned | $325 | ||
| 108-Stagecoach Estates-McArthur | Gutters | Sep 28, 2026 | today | Unassigned | $417 | ||
| Bldg AC-North Point Townhomes-Visionary | Gutters | Sep 28, 2026 | today | Unassigned | $557 | ||
| Bldg 6-Midtown Village-DR Horton | Gutters | Sep 28, 2026 | today | Unassigned | $816 | ✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16 | |
| 339-Sugar Creek-Visionary | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $924 | ||
| Bldg 13-Midtown Village-DR Horton | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $1,677 | ||
| 176-Mountain Gate-Sierra Homes | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $1,277 | ||
| Bldg F-Legends Crossing Townhomes-Visionary | Paint | Sep 30, 2026 | in 2d | Unassigned | $212 | ||
| 105-Palomino-DR Horton | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $1,187 | ||
| Units 1-6-VTG-Sierra Homes | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $1,121 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 2927-Mountain Ridge-Edge | Housewrap | Sep 23, 2026 | 5d overdue | Unassigned | $814 | ⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05 | |
| 2927-Mountain Ridge-Edge | Paper/Wire | Sep 23, 2026 | 5d overdue | Unassigned | $63 | ⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05 | |
| Bldg 21-Solari-Edge | Stucco Color | Sep 24, 2026 | 4d overdue | Unassigned | $2,876 | ||
| Bldg 203-Mountain Ridge-Edge | Rock | Sep 26, 2026 | 2d overdue | Unassigned | $1,742 | ||
| Bldg 22-Solari-Edge | Soffit/Fascia | Sep 26, 2026 | 2d overdue | Unassigned | $1,717 | ||
| Units 325-330-Enclave at Sky Ranch-Woodside | Stucco Color | Sep 26, 2026 | 2d overdue | Unassigned | $3,498 | ||
| 154-Pierson Farms-McArthur | Stucco Color | Sep 27, 2026 | 1d overdue | Unassigned | $937 | ||
| 328-Sienna Hills-Lennar | Paint | Sep 28, 2026 | today | Unassigned | $1,384 | ||
| 39-Sky Ranch Cascade-Woodside | Stucco Color | Sep 28, 2026 | today | Unassigned | $827 | ||
| Bldg 22-Solari-Edge | Stucco Color | Sep 28, 2026 | today | Unassigned | $2,502 | ||
| 104-Creek Ridge Cove-Richmond | Stucco Color | Sep 28, 2026 | today | Unassigned | 2026-09-23 | $799 | |
| 2907-Mountain Ridge-Edge | Set Scaff | Sep 29, 2026 | in 1d | Unassigned | $653 | ||
| 254-Boulder at Sky Ranch-Woodside | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $996 | ||
| 2904-Mountain Ridge-Edge | Set Scaff | Oct 1, 2026 | in 3d | Unassigned | $747 | ||
| 441-Daybreak Cottage Courts-Destination Homes | Stucco Color | Oct 1, 2026 | in 3d | Unassigned | $805 | ✅ 2026-09-10: 11 Days - City inspection is on delay until drywall window is installed so we can finish lath around it. - Arturo 2026-09-25 | |
| Units 541-543-Daybreak Lexington Townhomes-Destination Homes | Stucco Color | Oct 1, 2026 | in 3d | Unassigned | $1,192 | ✅ 2026-09-01: 11 Days - Do not start Housewrap until framing issue is fixed - Arturo 2026-09-16 | |
| Bldg 17-Solari-Edge | Set Scaff | Oct 5, 2026 | in 7d | Unassigned | $1,355 | ||
| Bldg 205-Mountain Ridge-Edge | Set Scaff | Oct 5, 2026 | in 7d | Unassigned | $1,492 | ||
| Bldg 206-Mountain Ridge-Edge | Insl Walls | Oct 6, 2026 | in 8d | Unassigned | $1,315 | ||
| 2918-Mountain Ridge-Edge | Set Scaff | Oct 7, 2026 | in 9d | Unassigned | $742 | ||
| Bldg 206-Mountain Ridge-Edge | Set Scaff | Oct 9, 2026 | in 11d | Unassigned | $1,706 | ||
| Bldg 23-Solari-Edge | Set Scaff | Oct 12, 2026 | in 14d | Unassigned | $1,778 | ||
| 2906-Mountain Ridge-Edge | Set Scaff | Oct 12, 2026 | in 14d | Unassigned | $781 | ||
| Bldg 208-Mountain Ridge-Edge | Insl Attic | Oct 14, 2026 | in 16d | Unassigned | $144 | ||
| Bldg 22-Solari-Edge | Insl Attic | Oct 26, 2026 | in 28d | Unassigned | $160 | ||
| Bldg 19-Solari-Edge | Insl Attic | Nov 3, 2026 | in 36d | Unassigned | $192 | ||
| Bldg 205-Mountain Ridge-Edge | Insl Attic | Nov 18, 2026 | in 51d | Unassigned | $143 | ||
| Bldg 206-Mountain Ridge-Edge | Insl Attic | Nov 24, 2026 | in 57d | Unassigned | $179 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 52-Zion Shores-Split Rock | Rock | Sep 10, 2026 | 18d overdue | Unassigned | 2026-09-21 | $7,478 | |
| 33-Black Desert North Village-H2 Homes | Stucco Color | Sep 22, 2026 | 6d overdue | Unassigned | 2026-08-17 | $4,708 | |
| 4293-Long Valley-DR Horton | Stucco Color | Sep 23, 2026 | 5d overdue | Unassigned | 2026-09-24 | $2,215 | |
| 7-Chelsey-DR Horton | Porch OSB | Sep 24, 2026 | 4d overdue | Unassigned | $25 | ||
| Bldg 132-Long Valley Townhomes-DR Horton | Paper/Wire | Sep 25, 2026 | 3d overdue | Unassigned | 2026-09-25 | $4,618 | |
| Bldg 132-Long Valley Townhomes-DR Horton | Porch OSB | Sep 25, 2026 | 3d overdue | Unassigned | $174 | ||
| 7-Chelsey-DR Horton | Remove Scaff | Sep 25, 2026 | 3d overdue | Unassigned | $306 | ||
| 37-Legacy at Sand Hollow-Visionary | Brick | Sep 26, 2026 | 2d overdue | Unassigned | 2026-09-17 | $236 | |
| 4293-Long Valley-DR Horton | Paint | Sep 26, 2026 | 2d overdue | Unassigned | $347 | ||
| 4158-Long Valley Rambler-DR Horton | Rock | Sep 26, 2026 | 2d overdue | Unassigned | $497 | ⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25 | |
| 37-Legacy at Sand Hollow-Visionary | Scratch Coat | Sep 26, 2026 | 2d overdue | Unassigned | $50 | ||
| 4158-Long Valley Rambler-DR Horton | Scratch Coat | Sep 26, 2026 | 2d overdue | Unassigned | $59 | ⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25 | |
| 37-Legacy at Sand Hollow-Visionary | Siding | Sep 26, 2026 | 2d overdue | Unassigned | 2026-09-15 | $1,061 | |
| 24-Legacy at Sand Hollow-Visionary | Siding | Sep 26, 2026 | 2d overdue | Unassigned | 2026-09-08 | $55 | |
| 37-Legacy at Sand Hollow-Visionary | Stucco Brown | Sep 26, 2026 | 2d overdue | Unassigned | $1,669 | ||
| 4158-Long Valley Rambler-DR Horton | Stucco Brown | Sep 26, 2026 | 2d overdue | Unassigned | $1,569 | ⭕ 2026-09-21: Cannot finish lath at back patio since slider door will be missing - Daniel Est End: 2026-09-25 | |
| 4294-Long Valley-DR Horton | Stucco Color | Sep 26, 2026 | 2d overdue | Unassigned | $2,259 | ||
| 114-Desert Color-Split Rock | Stucco Color | Sep 29, 2026 | in 1d | Unassigned | $8,107 | ||
| 4269-Long Valley-DR Horton | Stucco Color | Sep 30, 2026 | in 2d | Unassigned | $1,883 | ||
| 4295-Long Valley-DR Horton | Stucco Color | Oct 1, 2026 | in 3d | Unassigned | $2,239 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Bldg C-Residence at Millcreek-Rimrock | Scratch Coat | Jul 16, 2026 | 74d overdue | Unassigned | $1,811 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Penetration Sealing | Aug 15, 2026 | 44d overdue | Unassigned | $0 | ||
| White Dome Chapel-St George-Grass Creek | Set Scaff | Aug 27, 2026 | 32d overdue | Unassigned | $57 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Set Scaff | Sep 16, 2026 | 12d overdue | Unassigned | $2,000 | West Walls Setup | |
| Garage 4-Residence at Millcreek-Rimrock | Rock | Sep 18, 2026 | 10d overdue | Unassigned | 2026-09-02 | $1,190 | |
| Garage 3-Residence at Millcreek-Rimrock | Rock | Sep 25, 2026 | 3d overdue | Unassigned | $1,148 | ||
| Garage 3-Residence at Millcreek-Rimrock | Scratch Coat | Sep 25, 2026 | 3d overdue | Unassigned | $127 | ||
| Garage 3-Residence at Millcreek-Rimrock | Stucco Brown | Sep 25, 2026 | 3d overdue | Unassigned | $2,178 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown | Misc. Work | Aug 17, 2026 | 42d overdue | Unassigned | $0 | Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP |
Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):
Assigned Task Date is not blankTeam (Task Team) is blankCompleted Date/Time is blankTeam and Team Name agree on every record
(0 disagreements), so "no team assigned" is unambiguous.Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 299 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: