Tasks Ready for Assignment — Corporate

Every division. Tasks with an assignment date set but no team assigned and not yet completed.

Generated Sep 29, 2026 · Go to the current version →

This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.

● All 6 divisions, not just yours — the division scoping is removed.
● No 7-day cap. The division view only shows assignments due inside a week; this carries the whole book — the overdue tail reaching back to Jul 16, 2026 and forward assignments out to Nov 24, 2026.
● Delayed assignments are not excluded. The division view drops tasks flagged Task Assignment Is Delayed; that field is not available to this report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to active jobs, so an unassigned task on a finaled job shows in your division view and not here — the one direction where your view is larger than this report.

Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.

Generated Sep 29, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 13,080 task records pulled, 140 matched the filter · assignment dates Jul 16, 2026 to Nov 24, 2026

140
Ready for assignment
64
Past assignment date
6
Divisions affected
$146,025
Unassigned task pay
75d
Oldest overdue

Ready tasks by division

011223445Ogden4528 odOrem397 odSalt Lake308 odSt. George1712 odCommercial88 odCorporate11 od

past assignment date   due today or upcoming

Pivot — division × assignment age

Click any number to see the tasks behind it. Esc closes.

DivisionOverdue 30+ daysOverdue 8-30 daysOverdue 1-7 daysDue todayNext 7 daysBeyond 7 daysTotal
Ogden·
Orem·
Salt Lake··
St. George··
Commercial···
Corporate·····
All divisions

Pivot — division × task type

Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 22 task types.

Click any number to see the tasks behind it. Esc closes.

DivisionInsl WallsPenetration SealingPorch OSBSet ScaffHousewrapSet Brick ScaffPaper/WireStucco BrownScratch CoatSidingWateringPaintRockBrickSoffit/FasciaBrown & MeshGuttersRemove ScaffStucco ColorMisc. WorkInsl AtticFaux ConcreteTotal
Ogden········
Orem···············
Salt Lake·············
St. George············
Commercial·················
Corporate·····················
All divisions

Is there a crew for it? — the backlog and available crews on one axis

Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 112 of 140 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.

Click any number to see the tasks — or the crews — behind it. Esc closes.

Tasks needing assignment

DivisionScaffoldingStucco ColorPaper/WireGuttersInsulationSidingHousewrapRockPaintStucco BrownSoffitBrickField OpsAny tradeTotal
Ogden····
Orem·······
Salt Lake······
St. George·····
Commercial·········
Corporate·············
All divisions

Crews with a hand up — available to that division

DivisionScaffoldingStucco ColorPaper/WireGuttersInsulationSidingHousewrapRockPaintStucco BrownSoffitBrickField OpsAny tradeTotal
Ogden···············
Orem······
Salt Lake··········
St. George·············
Commercial···············
Corporate···············
All divisions·····

21 crews company-wide have a hand up, counted once per division they cover (25 crew-division slots, of which 4 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.

Detail by division

Click a division to see the underlying tasks, oldest assignment date first.

Ogden — 45 tasks ready for assignment · 28 overdue · $39,952
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
71-Brookfield-Lennar GuttersAug 24, 202636d overdueUnassigned$190
63-Brookfield-Lennar GuttersAug 24, 202636d overdueUnassigned$265
106-Red Hill-Ivory Set Brick ScaffAug 24, 202636d overdueUnassigned$0
102-Meadows at Hyde Park-Visionary BrickSep 11, 202618d overdueUnassigned2026-09-14$736
Bldg L-Sugar Creek Townhomes-Visionary RockSep 22, 20267d overdueUnassigned2026-09-23$530
Pope Residence Remodel-Custom Jobs (Ogden)-Owner Builder Paper/WireSep 23, 20266d overdueUnassigned$938⭕ 2026-09-28: they need to remove the permanent lights before we removed the old wood on the gable - George Est End: 2026-10-05
102-Meadows at Hyde Park-Visionary Stucco ColorSep 24, 20265d overdueUnassigned$978
107-Stagecoach Estates-McArthur GuttersSep 25, 20264d overdueUnassigned$255
126-Red Hill-Ivory PaintSep 25, 20264d overdueUnassigned$928
106-Seasons at Taylor Landing-Richmond Remove ScaffSep 25, 20264d overdueUnassigned$0
716-Ridgeline Park-Visionary Set ScaffSep 25, 20264d overdueUnassigned$399⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30
709-Ridgeline Park-Visionary Set ScaffSep 25, 20264d overdueUnassigned$718⭕ 2026-09-17: they want to do the flat work first - Jose Est End: 2026-09-30
716-Ridgeline Park-Visionary SidingSep 25, 20264d overdueUnassigned2026-09-23$1,893⭕ 2026-09-17: they want to do tha flat work first - Jose Est End: 2026-09-30
Bldg 13-Midtown Village-DR Horton WateringSep 25, 20264d overdueUnassigned$160
Units 1-6-VTG-Sierra Homes BrickSep 26, 20263d overdueUnassigned$7,581
13-Mountainside Estates-DR Horton HousewrapSep 26, 20263d overdueUnassigned$50
134-Legends Crossing-Visionary PaintSep 26, 20263d overdueUnassigned$77
Units 1-6-VTG-Sierra Homes RockSep 26, 20263d overdueUnassigned2026-09-25$6,356
521-Vineyard-Visionary Stucco ColorSep 26, 20263d overdueUnassigned$585
105-Palomino-DR Horton WateringSep 26, 20263d overdueUnassigned$94
237-Westwood Estates-Meritage Homes HousewrapSep 27, 20262d overdueUnassigned$722
216-Sugar Creek-Visionary Stucco ColorSep 27, 20262d overdueUnassigned2026-09-16$1,236
72-Brookfield-Lennar GuttersSep 28, 20261d overdueUnassigned$261
40-Cardamine-Sierra Homes Paper/WireSep 28, 20261d overdueUnassigned$50
101-Legends Crossing-Visionary Paper/WireSep 28, 20261d overdueUnassigned2026-09-25$50
128-Red Hill-Ivory Set ScaffSep 28, 20261d overdueUnassigned$37
217-Sugar Creek-Visionary SidingSep 28, 20261d overdueUnassigned2026-09-23$421
180-Mountain Gate-Sierra Homes SidingSep 28, 20261d overdueUnassigned$302✅ 2026-09-18: 6 Days - Is missing some windows - Jose 2026-09-28
503-Vineyard-Visionary Brown & MeshSep 29, 2026todayUnassigned2026-09-17$1,112
723-Ridgeline Park-Visionary Brown & MeshSep 29, 2026todayUnassigned$878✅ 2026-09-14: 5 Days - the concrete guys was start doing the porch cap and driways also on the east side was working building a wall - Jose 2026-09-21 ✅ 2026-09-02: -1 Days - Can’
241-Westwood Estates-Meritage Homes GuttersSep 29, 2026todayUnassigned$325
108-Stagecoach Estates-McArthur GuttersSep 29, 2026todayUnassigned$417
Bldg AC-North Point Townhomes-Visionary GuttersSep 29, 2026todayUnassigned$557
Bldg Y-North Point Townhomes-Visionary GuttersSep 29, 2026todayUnassigned$674
Bldg 6-Midtown Village-DR Horton GuttersSep 29, 2026todayUnassigned$816✅ 2026-09-08: 6 Days - not ready for lathe is missing the metal cap - George 2026-09-16
128-Red Hill-Ivory HousewrapSep 29, 2026todayUnassigned$730
503-Vineyard-Visionary RockSep 29, 2026todayUnassigned2026-09-23$1,094
503-Vineyard-Visionary Scratch CoatSep 29, 2026todayUnassigned$146
Bldg 13-Midtown Village-DR Horton Stucco ColorSep 29, 2026todayUnassigned$1,677
176-Mountain Gate-Sierra Homes Stucco ColorSep 29, 2026todayUnassigned$1,277
Bldg F-Legends Crossing Townhomes-Visionary PaintSep 30, 2026in 1dUnassigned$212
103-Stagecoach Estates-McArthur Paper/WireSep 30, 2026in 1dUnassigned$1,029
105-Palomino-DR Horton Stucco ColorSep 30, 2026in 1dUnassigned$1,187
Units 1-6-VTG-Sierra Homes Stucco ColorSep 30, 2026in 1dUnassigned$1,121
Units 47-52-Hess Farms-David Weekley Homes Paper/WireOct 1, 2026in 2dUnassigned$888⭕ 2026-09-22: Builders requested us to wait for scaffold until dry wall gets delivered - Alexander Est End: 2026-09-29 ⭕ 2026-09-11: Wait for house wrap inspection - Alexander Es
Orem — 39 tasks ready for assignment · 7 overdue · $35,557
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
2024-Wildflower-Toll Brothers Faux ConcreteSep 8, 202621d overdueUnassigned$1,532⭕ 2026-09-16: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-0
2021-Wildflower-Toll Brothers Faux ConcreteSep 8, 202621d overdueUnassigned$1,669⭕ 2026-09-23: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-09-30 ✅ 2026-09-04: 10 Days - Stone delay - material still not delivered - Jonathan 2026-
110-Canyon Park-Tri Pointe Homes Paper/WireSep 10, 202619d overdueUnassigned2026-09-01$173⭕ 2026-09-10: Missing a few windows and inside porch framing needing to be complete. Housewrap will be delayed until those pending items are completed. - Alex Est End: 2026-09-29
2216 (FP)-Wildflower-Edge Paper/WireSep 21, 20268d overdueUnassigned2026-09-28$50
44-Lakeview Fields-Keystone Construction Paper/WireSep 22, 20267d overdueUnassigned2026-09-02$1,170⭕ 2026-09-22: Cannot start lath. Missing man door to the side of the garage. - Alex Est End: 2026-09-29
16116-Harmony-Meritage Homes Soffit/FasciaSep 23, 20266d overdueUnassigned$622
16117-Harmony-Meritage Homes Soffit/FasciaSep 25, 20264d overdueUnassigned$575
235-Viridian Plus-DR Horton Set ScaffSep 29, 2026todayUnassigned$978
Bldg 59-Harmony Ridge-Edge Set ScaffSep 29, 2026todayUnassigned$1,480
314-Viridian-DR Horton SidingSep 29, 2026todayUnassigned2026-09-24$1,074
519-Ridgeview Cottages-Ivory SidingSep 29, 2026todayUnassigned2026-09-16$2,545✅ 2026-09-11: 2 Days - Need to wait for 4 way. Super told me to set scaff but not 4way - Harrison 2026-09-15
345-Mountain Vista at Sunset Flats-Pulte Homes SidingSep 29, 2026todayUnassigned2026-09-15$976✅ 2026-09-11: 9 Days - We can’t not lath this job to when I pass Housewrap inspections it’s not ready for lath and I have to do at vpo when it’s ready for the Housewrap to comeback
420-Viridian-DR Horton Stucco ColorSep 29, 2026todayUnassigned$883
1005-Harmony Ridge-Edge Set ScaffSep 30, 2026in 1dUnassigned$830
106-Vista at Harmony Place-Woodside Stucco ColorSep 30, 2026in 1dUnassigned$640
234-Viridian Plus-DR Horton Stucco ColorSep 30, 2026in 1dUnassigned$1,008
340-Viridian-DR Horton Stucco ColorSep 30, 2026in 1dUnassigned$880
Units 481-485-Regency at Meadowbrook-Woodside Stucco ColorOct 1, 2026in 2dUnassigned$2,545
Bldg 56-Harmony Ridge-Edge Stucco ColorOct 1, 2026in 2dUnassigned$3,142
602-River Point-Edge Set ScaffOct 2, 2026in 3dUnassigned$653
Bldg 56-Viridian Townhomes-DR Horton Set ScaffOct 2, 2026in 3dUnassigned$1,283
714-Highridge-Edge Set ScaffOct 5, 2026in 6dUnassigned$576
713-Ridgehorne-Edge Set ScaffOct 6, 2026in 7dUnassigned$829
104-Auburn Springs-Edge Set ScaffOct 6, 2026in 7dUnassigned$1,029
521-River Point-Edge Set ScaffOct 6, 2026in 7dUnassigned$766
2210-Wildflower-Edge Set ScaffOct 6, 2026in 7dUnassigned$585
354-Viridian Emerald-DR Horton Set ScaffOct 7, 2026in 8dUnassigned$0
102-Auburn Springs-Edge Set ScaffOct 7, 2026in 8dUnassigned$931
605-River Point-Edge Set ScaffOct 8, 2026in 9dUnassigned$578
110-Auburn Springs-Edge Set ScaffOct 8, 2026in 9dUnassigned$654
Bldg 39-Highridge-Edge Insl AtticOct 9, 2026in 10dUnassigned$80
132-Auburn Springs-Edge Set ScaffOct 9, 2026in 10dUnassigned$797
1022-Harmony Ridge-Edge Set ScaffOct 9, 2026in 10dUnassigned$829
516-River Point-Edge Set ScaffOct 12, 2026in 13dUnassigned$719
2190-Wildflower-Edge Set ScaffOct 12, 2026in 13dUnassigned$772
515-River Point-Edge Set ScaffOct 12, 2026in 13dUnassigned$730
144-Auburn Springs-Edge Set ScaffOct 13, 2026in 14dUnassigned$814
Bldg 37-Highridge-Edge Insl AtticNov 3, 2026in 35dUnassigned$80
Bldg 35-Highridge-Edge Insl AtticNov 13, 2026in 45dUnassigned$80
Salt Lake — 30 tasks ready for assignment · 8 overdue · $26,408
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
2927-Mountain Ridge-Edge HousewrapSep 23, 20266d overdueUnassigned$814⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
2927-Mountain Ridge-Edge Paper/WireSep 23, 20266d overdueUnassigned$63⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05
Bldg 21-Solari-Edge Stucco ColorSep 24, 20265d overdueUnassigned$2,876
154-Pierson Farms-McArthur Stucco ColorSep 27, 20262d overdueUnassigned$937
440-Daybreak Cottage Courts-Destination Homes HousewrapSep 28, 20261d overdueUnassigned$389
440-Daybreak Cottage Courts-Destination Homes Paper/WireSep 28, 20261d overdueUnassigned$681
39-Sky Ranch Cascade-Woodside Stucco ColorSep 28, 20261d overdueUnassigned$827
Bldg 22-Solari-Edge Stucco ColorSep 28, 20261d overdueUnassigned$2,502
2907-Mountain Ridge-Edge HousewrapSep 29, 2026todayUnassigned$818
2907-Mountain Ridge-Edge Paper/WireSep 29, 2026todayUnassigned$50
1028-Northstar Ranch-Destination Homes SidingSep 29, 2026todayUnassigned2026-09-14$1,440✅ 2026-09-15: 6 Days - Siding back patio cap. Lathe not completed - Dustin 2026-09-23
1028-Northstar Ranch-Destination Homes Soffit/FasciaSep 29, 2026todayUnassigned$633✅ 2026-09-15: 6 Days - Siding back patio cap. Lathe not completed - Dustin 2026-09-23
1028-Northstar Ranch-Destination Homes Stucco BrownSep 29, 2026todayUnassigned$1,022✅ 2026-09-15: 6 Days - Siding back patio cap. Lathe not completed - Dustin 2026-09-23
254-Boulder at Sky Ranch-Woodside Stucco ColorSep 29, 2026todayUnassigned$996
2904-Mountain Ridge-Edge Set ScaffOct 1, 2026in 2dUnassigned$747
441-Daybreak Cottage Courts-Destination Homes Stucco ColorOct 1, 2026in 2dUnassigned$805✅ 2026-09-10: 11 Days - City inspection is on delay until drywall window is installed so we can finish lath around it. - Arturo 2026-09-25
Units 541-543-Daybreak Lexington Townhomes-Destination Homes Stucco ColorOct 1, 2026in 2dUnassigned$1,192✅ 2026-09-01: 11 Days - Do not start Housewrap until framing issue is fixed - Arturo 2026-09-16
Bldg 17-Solari-Edge Set ScaffOct 5, 2026in 6dUnassigned$1,355
Bldg 206-Mountain Ridge-Edge Insl WallsOct 6, 2026in 7dUnassigned$1,315
2918-Mountain Ridge-Edge Set ScaffOct 7, 2026in 8dUnassigned$742
Bldg 206-Mountain Ridge-Edge Set ScaffOct 9, 2026in 10dUnassigned$1,706
Bldg 23-Solari-Edge Set ScaffOct 12, 2026in 13dUnassigned$1,778
2906-Mountain Ridge-Edge Set ScaffOct 12, 2026in 13dUnassigned$781
205-Capitol Reef-Edge Set ScaffOct 13, 2026in 14dUnassigned$459
Bldg 208-Mountain Ridge-Edge Insl AtticOct 14, 2026in 15dUnassigned$144
Bldg 22-Solari-Edge Insl AtticOct 26, 2026in 27dUnassigned$160
Bldg 19-Solari-Edge Insl AtticNov 3, 2026in 35dUnassigned$192
201-Capitol Reef-Edge Set ScaffNov 6, 2026in 38dUnassigned$663
Bldg 205-Mountain Ridge-Edge Insl AtticNov 18, 2026in 50dUnassigned$143
Bldg 206-Mountain Ridge-Edge Insl AtticNov 24, 2026in 56dUnassigned$179
St. George — 17 tasks ready for assignment · 12 overdue · $35,599
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
52-Zion Shores-Split Rock RockSep 10, 202619d overdueUnassigned2026-09-21$7,478
33-Black Desert North Village-H2 Homes Stucco ColorSep 22, 20267d overdueUnassigned2026-08-17$4,708
7-Chelsey-DR Horton Remove ScaffSep 25, 20264d overdueUnassigned$306
4293-Long Valley-DR Horton PaintSep 26, 20263d overdueUnassigned$347
4158-Long Valley Rambler-DR Horton RockSep 26, 20263d overdueUnassigned$497✅ 2026-09-21: 4 Days - Cannot finish lath at back patio since slider door will be missing - Daniel 2026-09-25
4158-Long Valley Rambler-DR Horton Scratch CoatSep 26, 20263d overdueUnassigned$59✅ 2026-09-21: 4 Days - Cannot finish lath at back patio since slider door will be missing - Daniel 2026-09-25
24-Legacy at Sand Hollow-Visionary SidingSep 26, 20263d overdueUnassigned2026-09-08$55
4158-Long Valley Rambler-DR Horton Stucco BrownSep 26, 20263d overdueUnassigned$1,569✅ 2026-09-21: 4 Days - Cannot finish lath at back patio since slider door will be missing - Daniel 2026-09-25
4160-Long Valley Rambler-DR Horton HousewrapSep 28, 20261d overdueUnassigned$50
4295-Long Valley-DR Horton PaintSep 28, 20261d overdueUnassigned$180
4160-Long Valley Rambler-DR Horton Paper/WireSep 28, 20261d overdueUnassigned$1,418
4160-Long Valley Rambler-DR Horton Porch OSBSep 28, 20261d overdueUnassigned$85
114-Desert Color-Split Rock Stucco ColorSep 29, 2026todayUnassigned$8,107
4269-Long Valley-DR Horton Stucco ColorSep 30, 2026in 1dUnassigned$1,883
4295-Long Valley-DR Horton Stucco ColorOct 1, 2026in 2dUnassigned$2,239
52-Zion Shores-Split Rock Stucco ColorOct 3, 2026in 4dUnassigned$4,818
33-Legacy at Sand Hollow-Visionary Stucco ColorOct 3, 2026in 4dUnassigned$1,799
Commercial — 8 tasks ready for assignment · 8 overdue · $8,510
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Bldg C-Residence at Millcreek-Rimrock Scratch CoatJul 16, 202675d overdueUnassigned$1,811
Bldg RU-1-ARA Southwest-Campbell Construction Penetration SealingAug 15, 202645d overdueUnassigned$0
White Dome Chapel-St George-Grass Creek Set ScaffAug 27, 202633d overdueUnassigned$57
Bldg RU-1-ARA Southwest-Campbell Construction Set ScaffSep 16, 202613d overdueUnassigned$2,000West Walls Setup
Garage 4-Residence at Millcreek-Rimrock RockSep 18, 202611d overdueUnassigned2026-09-02$1,190
Garage 3-Residence at Millcreek-Rimrock RockSep 25, 20264d overdueUnassigned$1,148
Garage 3-Residence at Millcreek-Rimrock Scratch CoatSep 25, 20264d overdueUnassigned$127
Garage 3-Residence at Millcreek-Rimrock Stucco BrownSep 25, 20264d overdueUnassigned$2,178
Corporate — 1 task ready for assignment · 1 overdue · $0
JobTaskAssignedAgeStatusMaterials duePayDelay / notes
Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown Misc. WorkAug 17, 202643d overdueUnassigned$0Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP

How this was filtered

Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):

Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 301 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: