Every division. Tasks with an assignment date set but no team assigned and not yet completed.
Generated Oct 5, 2026 · Go to the current version →
This will not tie to your division view — it is wider on three axes and narrower on one. Most tasks in a division's Tasks Ready For Assignment - My Division view appear here, but neither list contains the other.
● All 6 divisions, not just yours — the
division scoping is removed.
● No 7-day cap. The division view only shows assignments due
inside a week; this carries the whole book — the overdue tail reaching back to
Jul 16, 2026 and forward assignments out to Dec 2, 2026.
● Delayed assignments are not excluded. The division view drops
tasks flagged Task Assignment Is Delayed; that field is not available to this
report, so those tasks are still counted here.
● Finaled jobs are excluded here. The source view is scoped to
active jobs, so an unassigned task on a finaled job shows in your division view and
not here — the one direction where your view is larger than this
report.
Treat these numbers as the company-wide assignment backlog, not as a division worklist. See How this was filtered at the bottom for the exact conditions.
Generated Oct 5, 2026 · source: TrackVia MCP Task Data For Pipeline Matrix Report (view 2818) · 12,564 task records pulled, 150 matched the filter · assignment dates Jul 16, 2026 to Dec 2, 2026
past assignment date due today or upcoming
Click any number to see the tasks behind it. Esc closes.
| Division | Overdue 30+ days | Overdue 8-30 days | Overdue 1-7 days | Due today | Next 7 days | Beyond 7 days | Total |
|---|---|---|---|---|---|---|---|
| Orem | · | ||||||
| Ogden | · | · | · | ||||
| Salt Lake | · | ||||||
| St. George | · | · | |||||
| Commercial | · | · | · | ||||
| Corporate | · | · | · | · | · | ||
| All divisions |
Which trades the backlog is sitting in, in construction sequence. Scroll sideways for all 23 task types.
Click any number to see the tasks behind it. Esc closes.
| Division | Insl Foam 1 | Insl Walls | Penetration Sealing | Porch OSB | Set Scaff | Housewrap | Set Brick Scaff | Paper/Wire | Stucco Brown | Scratch Coat | Siding | Paint | Rock | Brick | Soffit/Fascia | Gutters | Remove Scaff | Shutters | Stucco Color | Misc. Work | Insl Attic | Foundation Plaster | Faux Concrete | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | · | · | · | · | |||||||||||||||||
| Ogden | · | · | · | · | · | · | · | · | · | · | · | |||||||||||||
| Salt Lake | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | |||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | |||||||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | |||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions |
Tasks are typed by task type, crews by trade, so trade is the axis both sides share. The two tables below carry identical rows and columns — read straight down a column: work waiting on top, crews with a hand up underneath. 100 of 150 tasks sit in a division-and-trade with nobody available — those cells are amber. Red still means past its assignment date, as everywhere else in this report.
Click any number to see the tasks — or the crews — behind it. Esc closes.
Tasks needing assignment
| Division | Scaffolding | Stucco Color | Rock | Insulation | Paper/Wire | Siding | Paint | Housewrap | Brick | Stucco Brown | Soffit | Gutters | Field Ops | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | ||||||||||||
| Ogden | · | · | · | ||||||||||||
| Salt Lake | · | · | · | · | · | · | · | · | |||||||
| St. George | · | · | · | · | · | · | · | · | · | ||||||
| Commercial | · | · | · | · | · | · | · | · | |||||||
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| All divisions |
Crews with a hand up — available to that division
| Division | Scaffolding | Stucco Color | Rock | Insulation | Paper/Wire | Siding | Paint | Housewrap | Brick | Stucco Brown | Soffit | Gutters | Field Ops | Any trade | Total |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Orem | · | · | · | · | · | ||||||||||
| Ogden | · | · | · | · | · | · | · | · | · | · | · | · | |||
| Salt Lake | · | · | · | · | · | · | |||||||||
| St. George | · | · | · | · | · | · | · | · | · | · | · | · | · | ||
| Commercial | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| Corporate | · | · | · | · | · | · | · | · | · | · | · | · | · | · | · |
| All divisions | · | · | · | · | · |
38 crews company-wide have a hand up, counted once per division they cover (51 crew-division slots, of which 13 are crews working outside their home division). A crew is available to every division in its coverage list, which is how the real queue behaves.
Click a division to see the underlying tasks, oldest assignment date first.
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 2024-Wildflower-Toll Brothers | Faux Concrete | Sep 8, 2026 | 27d overdue | Unassigned | $1,532 | ⭕ 2026-09-16: Plaster delay - concrete needs to be poured first - Jonathan Est End: 2026-10-02 ✅ 2026-08-26: 3 Days - Siding delay - still missing a few windows - Jonathan 2026-0 | |
| 2021-Wildflower-Toll Brothers | Faux Concrete | Sep 8, 2026 | 27d overdue | Unassigned | $1,669 | ⭕ 2026-09-28: Stone delay - stone guy needed more material to complete job - waiting on material to arrive - Jonathan Est End: 2026-10-02 ⭕ 2026-09-23: Plaster delay - concrete ne | |
| 44-Lakeview Fields-Keystone Construction | Paper/Wire | Sep 22, 2026 | 13d overdue | Unassigned | 2026-09-02 | $1,170 | ⭕ 2026-09-22: Cannot start lath. Missing man door to the side of the garage. - Alex Est End: 2026-10-02 |
| 518-Ridgeview Cottages-Ivory | Brick | Sep 29, 2026 | 6d overdue | Unassigned | 2026-09-14 | $2,970 | ✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11 |
| 335-Mountain Vista at Sunset Flats-Pulte Homes | Paper/Wire | Sep 30, 2026 | 5d overdue | Unassigned | 2026-09-28 | $1,361 | ⭕ 2026-09-30: We can’t lath we need to pass Housewrap inspection before we lath please don’t send any lath crew thanks - Victor Est End: 2026-10-05 |
| 344-Mountain Vista at Sunset Flats-Pulte Homes | Paper/Wire | Sep 30, 2026 | 5d overdue | Unassigned | 2026-09-23 | $1,379 | ⭕ 2026-09-30: We need to pass the Housewrap before we can lath please don’t send lath crew thanks - Victor Est End: 2026-10-05 |
| 721-Ridgehorne-Edge | Rock | Sep 30, 2026 | 5d overdue | Unassigned | 2026-09-25 | $281 | ✅ 2026-09-22: 2 Days - Lath delay - good to proceed on lath for stone - missing windows - Jonathan 2026-09-24 |
| Units 476-480-Legacy at Meadowbrook-Woodside | Set Scaff | Sep 30, 2026 | 5d overdue | Unassigned | $1,451 | ⭕ 2026-09-30: Scaff Delay - Woodside cm requested that we hold off on scaff - Harrison Est End: 2026-09-08 | |
| 41-Lakeview Fields-Keystone Construction | Rock | Oct 1, 2026 | 4d overdue | Unassigned | 2026-09-08 | $143 | ⭕ 2026-10-01: The window was replaced after we had already installed the lath and completed the work. We are delaying the stucco brown application until the lath is repaired. - Ale |
| 119-Canyon Park-Tri Pointe Homes | Set Brick Scaff | Oct 1, 2026 | 4d overdue | Unassigned | $133 | ⭕ 2026-10-01: Scaff Delay - Shear passed. Waiting on Ty to confirm when it start scaffold. - Alex Est End: 2026-10-07 | |
| 107-Canyon Park-Tri Pointe Homes | Set Scaff | Oct 1, 2026 | 4d overdue | Unassigned | $1,250 | ⭕ 2026-10-01: Scaff Delay - Shear passed. Scaffold is on standby until I get confirmation to resume. - Alex Est End: 2026-10-05 | |
| 119-Canyon Park-Tri Pointe Homes | Set Scaff | Oct 1, 2026 | 4d overdue | Unassigned | $500 | ⭕ 2026-10-01: Scaff Delay - Shear passed. Waiting on Ty to confirm when it start scaffold. - Alex Est End: 2026-10-07 | |
| Bldg 56-Harmony Ridge-Edge | Stucco Color | Oct 1, 2026 | 4d overdue | Unassigned | $3,142 | ||
| 835-Broadview Shores-Ivory | Brick | Oct 2, 2026 | 3d overdue | Unassigned | 2026-09-22 | $5,489 | |
| 2021-Wildflower-Toll Brothers | Foundation Plaster | Oct 2, 2026 | 3d overdue | Unassigned | $450 | ⭕ 2026-09-28: Stone delay - stone guy needed more material to complete job - waiting on material to arrive - Jonathan Est End: 2026-10-02 ⭕ 2026-09-23: Plaster delay - concrete ne | |
| 732-Ridgehorne-Edge | Rock | Oct 2, 2026 | 3d overdue | Unassigned | 2026-10-02 | $359 | ⭕ 2026-09-30: Brown delay - framer has to come to install a pc of framing on a section by the beam so we can install the lath properly - Jonathan Est End: 2026-10-02 ✅ 2026-09-29: |
| Bldg 36-Highridge-Edge | Rock | Oct 2, 2026 | 3d overdue | Unassigned | 2026-09-25 | $702 | ⭕ 2026-09-29: Brown delay and siding delay - missing window , ok to proceed on scratch - Jonathan Est End: 2026-10-02 |
| 732-Ridgehorne-Edge | Scratch Coat | Oct 2, 2026 | 3d overdue | Unassigned | $52 | ⭕ 2026-09-30: Brown delay - framer has to come to install a pc of framing on a section by the beam so we can install the lath properly - Jonathan Est End: 2026-10-02 ✅ 2026-09-29: | |
| Bldg 36-Highridge-Edge | Scratch Coat | Oct 2, 2026 | 3d overdue | Unassigned | $106 | ⭕ 2026-09-29: Brown delay and siding delay - missing window , ok to proceed on scratch - Jonathan Est End: 2026-10-02 | |
| Bldg 36-Highridge-Edge | Siding | Oct 2, 2026 | 3d overdue | Unassigned | 2026-09-28 | $3,280 | ⭕ 2026-09-29: Brown delay and siding delay - missing window , ok to proceed on scratch - Jonathan Est End: 2026-10-02 |
| 835-Broadview Shores-Ivory | Siding | Oct 2, 2026 | 3d overdue | Unassigned | 2026-09-28 | $1,437 | |
| 732-Ridgehorne-Edge | Stucco Brown | Oct 2, 2026 | 3d overdue | Unassigned | $1,275 | ⭕ 2026-09-30: Brown delay - framer has to come to install a pc of framing on a section by the beam so we can install the lath properly - Jonathan Est End: 2026-10-02 ✅ 2026-09-29: | |
| Bldg 36-Highridge-Edge | Stucco Brown | Oct 2, 2026 | 3d overdue | Unassigned | $1,522 | ⭕ 2026-09-29: Brown delay and siding delay - missing window , ok to proceed on scratch - Jonathan Est End: 2026-10-02 | |
| 835-Broadview Shores-Ivory | Stucco Brown | Oct 2, 2026 | 3d overdue | Unassigned | $775 | ||
| 108-Canyon Park-Tri Pointe Homes | Paper/Wire | Oct 4, 2026 | 1d overdue | Unassigned | 2026-09-29 | $367 | |
| 106-Canyon Park-Tri Pointe Homes | Rock | Oct 4, 2026 | 1d overdue | Unassigned | 2026-10-01 | $1,231 | ✅ 2026-09-03: 15 Days - Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex 2026-09-24 ✅ 2026-08-20: |
| 106-Canyon Park-Tri Pointe Homes | Scratch Coat | Oct 4, 2026 | 1d overdue | Unassigned | $145 | ✅ 2026-09-03: 15 Days - Delay on lath install. Possible plan change for the porch headers. May want to change to stucco popouts instead of precast. - Alex 2026-09-24 ✅ 2026-08-20: | |
| 109-Canyon Park-Tri Pointe Homes | Soffit/Fascia | Oct 4, 2026 | 1d overdue | Unassigned | $820 | ✅ 2026-09-11: 8 Days - Possible change of plans on the front porch. Might swap pre cast stone to stucco pop out. - Alex 2026-09-23 | |
| 518-Ridgeview Cottages-Ivory | Paint | Oct 5, 2026 | today | Unassigned | $305 | ✅ 2026-09-10: Scaff Delay - They have to replace a window - Harrison 2026-09-11 | |
| 713-Ridgehorne-Edge | Set Scaff | Oct 6, 2026 | in 1d | Unassigned | $829 | ||
| 104-Auburn Springs-Edge | Set Scaff | Oct 6, 2026 | in 1d | Unassigned | $1,029 | ||
| 521-River Point-Edge | Set Scaff | Oct 6, 2026 | in 1d | Unassigned | $766 | ||
| 2210-Wildflower-Edge | Set Scaff | Oct 6, 2026 | in 1d | Unassigned | $585 | ||
| 1030-Harmony Ridge-Edge | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $1,258 | ||
| 721-Ridgehorne-Edge | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $795 | ✅ 2026-09-22: 2 Days - Lath delay - good to proceed on lath for stone - missing windows - Jonathan 2026-09-24 | |
| Bldg 38-Highridge-Edge | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $1,302 | ||
| 354-Viridian Emerald-DR Horton | Set Scaff | Oct 7, 2026 | in 2d | Unassigned | $0 | ||
| 102-Auburn Springs-Edge | Set Scaff | Oct 7, 2026 | in 2d | Unassigned | $931 | ||
| 405-Viridian-DR Horton | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $1,238 | ||
| 339-Viridian-DR Horton | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $825 | ||
| 41-Lakeview Fields-Keystone Construction | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $1,181 | ⭕ 2026-10-01: The window was replaced after we had already installed the lath and completed the work. We are delaying the stucco brown application until the lath is repaired. - Ale | |
| 605-River Point-Edge | Set Scaff | Oct 8, 2026 | in 3d | Unassigned | $578 | ||
| 110-Auburn Springs-Edge | Set Scaff | Oct 8, 2026 | in 3d | Unassigned | $650 | ||
| 238-Canton Ridge-Richmond | Stucco Color | Oct 8, 2026 | in 3d | Unassigned | $1,133 | ||
| Bldg 39-Highridge-Edge | Insl Attic | Oct 9, 2026 | in 4d | Unassigned | $80 | ||
| 132-Auburn Springs-Edge | Set Scaff | Oct 9, 2026 | in 4d | Unassigned | $800 | ||
| 1022-Harmony Ridge-Edge | Set Scaff | Oct 9, 2026 | in 4d | Unassigned | $829 | ||
| Bldg 51-Highridge-Edge | Insl Foam 1 | Oct 12, 2026 | in 7d | Unassigned | $0 | ||
| Bldg 51-Highridge-Edge | Insl Walls | Oct 12, 2026 | in 7d | Unassigned | $50 | ||
| 2190-Wildflower-Edge | Set Scaff | Oct 12, 2026 | in 7d | Unassigned | $781 | ||
| 516-River Point-Edge | Set Scaff | Oct 13, 2026 | in 8d | Unassigned | $720 | ||
| 515-River Point-Edge | Set Scaff | Oct 13, 2026 | in 8d | Unassigned | $730 | ||
| 372-Viridian Plus-DR Horton | Set Scaff | Oct 14, 2026 | in 9d | Unassigned | $742 | ||
| 737-Ridgehorne-Edge | Set Scaff | Oct 14, 2026 | in 9d | Unassigned | $482 | ||
| Bldg 55-Harmony Ridge-Edge | Set Scaff | Oct 14, 2026 | in 9d | Unassigned | $1,682 | ||
| 2223-Wildflower-Edge | Set Scaff | Oct 14, 2026 | in 9d | Unassigned | $587 | ||
| 143-Auburn Springs-Edge | Set Scaff | Oct 14, 2026 | in 9d | Unassigned | $844 | ||
| 144-Auburn Springs-Edge | Set Scaff | Oct 15, 2026 | in 10d | Unassigned | $814 | ||
| 703-The Ridge at Mt Saratoga SF-Edge | Set Scaff | Oct 15, 2026 | in 10d | Unassigned | $876 | ||
| Bldg 51-Highridge-Edge | Set Scaff | Oct 15, 2026 | in 10d | Unassigned | $1,015 | ||
| 2211-Wildflower-Edge | Set Scaff | Oct 16, 2026 | in 11d | Unassigned | $682 | ||
| 742-Ridgehorne-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $768 | ||
| 704-The Ridge at Mt Saratoga SF-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $673 | ||
| Bldg 37-Highridge-Edge | Insl Attic | Nov 3, 2026 | in 29d | Unassigned | $80 | ||
| Bldg 35-Highridge-Edge | Insl Attic | Nov 13, 2026 | in 39d | Unassigned | $80 | ⭕ 2026-10-01: Siding and brown delay - missing windows - Jonathan Est End: 2026-10-02 | |
| Bldg 51-Highridge-Edge | Insl Attic | Dec 2, 2026 | in 58d | Unassigned | $50 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 180-Mountain Gate-Sierra Homes | Siding | Sep 28, 2026 | 7d overdue | Unassigned | $302 | ✅ 2026-09-18: 6 Days - Is missing some windows - Jose 2026-09-28 | |
| 72-Brookfield-Lennar | Shutters | Sep 29, 2026 | 6d overdue | Unassigned | 2026-09-23 | $50 | |
| 58-Harvest Acres-Sierra Homes | Paper/Wire | Sep 30, 2026 | 5d overdue | Unassigned | $50 | ⭕ 2026-09-30: Material Delay - We still don’t has any order on the job - Jose Est End: 2026-10-09 | |
| 127-Red Hill-Ivory | Set Brick Scaff | Sep 30, 2026 | 5d overdue | Unassigned | $21 | ⭕ 2026-10-01: missing a couple of windows - George Est End: 2026-10-07 | |
| 209-Stagecoach Estates-McArthur | Rock | Oct 1, 2026 | 4d overdue | Unassigned | 2026-09-24 | $465 | |
| 115-Stagecoach Estates-McArthur | Set Scaff | Oct 1, 2026 | 4d overdue | Unassigned | $579 | ||
| 115-Stagecoach Estates-McArthur | Housewrap | Oct 2, 2026 | 3d overdue | Unassigned | $583 | ||
| 217-Sugar Creek-Visionary | Paint | Oct 2, 2026 | 3d overdue | Unassigned | $231 | ||
| 716-Ridgeline Park-Visionary | Paint | Oct 2, 2026 | 3d overdue | Unassigned | $927 | ✅ 2026-09-17: 9 Days - they want to do tha flat work first - Jose 2026-09-30 | |
| 607-Vineyard-Visionary | Paint | Oct 2, 2026 | 3d overdue | Unassigned | $1,941 | ||
| 180-Mountain Gate-Sierra Homes | Rock | Oct 2, 2026 | 3d overdue | Unassigned | $1,801 | ✅ 2026-09-18: 6 Days - Is missing some windows - Jose 2026-09-28 | |
| 107-Village at Fox Meadows-Visionary | Rock | Oct 2, 2026 | 3d overdue | Unassigned | 2026-09-29 | $435 | ✅ 2026-09-15: 7 Days - We can start this job on this date because they stills has the porch cap missing - Jose 2026-09-24 |
| 103-Meadows at Hyde Park-Visionary | Set Scaff | Oct 2, 2026 | 3d overdue | Unassigned | $609 | ⭕ 2026-10-02: we still don't has any material order - Jose Est End: 2026-10-09 | |
| 103-Meadows at Hyde Park-Visionary | Siding | Oct 2, 2026 | 3d overdue | Unassigned | $1,517 | ⭕ 2026-10-02: we still don't has any material order - Jose Est End: 2026-10-09 | |
| Bldg 1-Railrunner-DAI Construction | Siding | Oct 2, 2026 | 3d overdue | Unassigned | $782 | ✅ 2026-09-21: 14 Days - HVAC. still doing some work around the building inspection hasn't pass yet - George 2026-10-09 | |
| 112-Meadows at Hyde Park-Visionary | Brick | Oct 3, 2026 | 2d overdue | Unassigned | $773 | ||
| 112-Meadows at Hyde Park-Visionary | Paint | Oct 3, 2026 | 2d overdue | Unassigned | $662 | ||
| 101-Legends Crossing-Visionary | Rock | Oct 3, 2026 | 2d overdue | Unassigned | 2026-09-25 | $260 | |
| Units 47-52-Hess Farms-David Weekley Homes | Rock | Oct 3, 2026 | 2d overdue | Unassigned | $9,686 | ✅ 2026-09-22: 5 Days - Builders requested us to wait for scaffold until dry wall gets delivered - Alexander 2026-09-29 ✅ 2026-09-11: 10 Days - Wait for house wrap inspection - Al | |
| 101-Legends Crossing-Visionary | Scratch Coat | Oct 3, 2026 | 2d overdue | Unassigned | $50 | ||
| 607-Village at Fox Meadows-Visionary | Siding | Oct 3, 2026 | 2d overdue | Unassigned | $4,166 | ||
| 113-Three Farms Jenkins Fields-Ivory | Brick | Oct 4, 2026 | 1d overdue | Unassigned | 2026-10-03 | $2,008 | |
| 26-Hylands Ranch-Dixon Homes | Brick | Oct 5, 2026 | today | Unassigned | $840 | ✅ 2026-09-18: hadn't pass 4way yet - George 2026-09-18 | |
| 237-Westwood Estates-Meritage Homes | Gutters | Oct 5, 2026 | today | Unassigned | $498 | ||
| 176-Mountain Gate-Sierra Homes | Gutters | Oct 5, 2026 | today | Unassigned | $464 | ||
| 109-Stagecoach Estates-McArthur | Paper/Wire | Oct 5, 2026 | today | Unassigned | 2026-10-04 | $1,004 | |
| 503-Vineyard-Visionary | Stucco Color | Oct 5, 2026 | today | Unassigned | 2026-09-30 | $783 | |
| 1710-Cranefield Estates-Ivory | Stucco Color | Oct 5, 2026 | today | Unassigned | $1,006 | ||
| 26-Hylands Ranch-Dixon Homes | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $1,020 | ✅ 2026-09-18: hadn't pass 4way yet - George 2026-09-18 | |
| 52-Mountainside Estates-DR Horton | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $928 | ||
| 19-Hylands Ranch-Dixon Homes | Brick | Oct 7, 2026 | in 2d | Unassigned | $983 | ✅ 2026-09-28: 3 Days - the house hasn't pass 4way yet - George 2026-09-28 | |
| Bldg F-Legends Crossing Townhomes-Visionary | Paint | Oct 7, 2026 | in 2d | Unassigned | 2026-10-03 | $212 | |
| 19-Hylands Ranch-Dixon Homes | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $1,075 | ✅ 2026-09-28: 3 Days - the house hasn't pass 4way yet - George 2026-09-28 | |
| 214-Bristol Farms-Regal Homes | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $1,178 | ||
| 209-Stagecoach Estates-McArthur | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $932 | ||
| 1712-Cranefield Estates-Ivory | Stucco Color | Oct 9, 2026 | in 4d | Unassigned | $1,085 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 2927-Mountain Ridge-Edge | Housewrap | Sep 23, 2026 | 12d overdue | Unassigned | $814 | ⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05 | |
| 2927-Mountain Ridge-Edge | Paper/Wire | Sep 23, 2026 | 12d overdue | Unassigned | $63 | ⭕ 2026-09-23: Windows won’t be installed until October, delay exteriors only set scaff. - Arturo Est End: 2026-10-05 | |
| 2931-Mountain Ridge-Edge | Soffit/Fascia | Oct 2, 2026 | 3d overdue | Unassigned | $576 | ⭕ 2026-10-02: Don’t send soffit and fascia crews until framers fix the front entryway. It doesn’t match plans. - Arturo Est End: 2026-10-05 | |
| Bldg 203-Mountain Ridge-Edge | Stucco Color | Oct 4, 2026 | 1d overdue | Unassigned | $1,553 | ||
| Bldg 17-Solari-Edge | Set Scaff | Oct 5, 2026 | today | Unassigned | $1,355 | ||
| 1027-Northstar Ranch-Destination Homes | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $1,180 | ||
| 1028-Northstar Ranch-Destination Homes | Stucco Color | Oct 6, 2026 | in 1d | Unassigned | $882 | ✅ 2026-09-15: 6 Days - Siding back patio cap. Lathe not completed - Dustin 2026-09-23 | |
| 2918-Mountain Ridge-Edge | Set Scaff | Oct 7, 2026 | in 2d | Unassigned | $743 | ||
| Bldg 19-Solari-Edge | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $2,578 | ||
| Bldg 204-Mountain Ridge-Edge | Stucco Color | Oct 8, 2026 | in 3d | Unassigned | $1,580 | ||
| Bldg 206-Mountain Ridge-Edge | Set Scaff | Oct 9, 2026 | in 4d | Unassigned | $1,706 | ||
| Bldg 18-Solari-Edge | Stucco Color | Oct 9, 2026 | in 4d | Unassigned | $2,578 | ||
| Bldg 23-Solari-Edge | Set Scaff | Oct 12, 2026 | in 7d | Unassigned | $1,778 | ||
| 2906-Mountain Ridge-Edge | Set Scaff | Oct 12, 2026 | in 7d | Unassigned | $781 | ||
| 205-Capitol Reef-Edge | Set Scaff | Oct 13, 2026 | in 8d | Unassigned | $459 | ||
| 2905-Mountain Ridge-Edge | Set Scaff | Oct 16, 2026 | in 11d | Unassigned | $734 | ||
| Bldg 207-Mountain Ridge-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $1,501 | ||
| Bldg 12-Solari-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $1,570 | ||
| 209-Capitol Reef-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $772 | ||
| 207-Capitol Reef-Edge | Set Scaff | Oct 19, 2026 | in 14d | Unassigned | $728 | ||
| Bldg 19-Solari-Edge | Insl Attic | Nov 3, 2026 | in 29d | Unassigned | $192 | ||
| 201-Capitol Reef-Edge | Set Scaff | Nov 6, 2026 | in 32d | Unassigned | $663 | ||
| 203-Capitol Reef-Edge | Set Scaff | Nov 9, 2026 | in 35d | Unassigned | $577 | ||
| Bldg 205-Mountain Ridge-Edge | Insl Attic | Nov 18, 2026 | in 44d | Unassigned | $143 | ||
| Bldg 206-Mountain Ridge-Edge | Insl Attic | Nov 24, 2026 | in 50d | Unassigned | $179 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| 52-Zion Shores-Split Rock | Rock | Sep 10, 2026 | 25d overdue | Unassigned | 2026-09-21 | $7,478 | |
| 33-Black Desert North Village-H2 Homes | Stucco Color | Sep 22, 2026 | 13d overdue | Unassigned | 2026-08-17 | $4,708 | |
| 7-Chelsey-DR Horton | Remove Scaff | Sep 25, 2026 | 10d overdue | Unassigned | $306 | ||
| 4160-Long Valley Rambler-DR Horton | Housewrap | Sep 28, 2026 | 7d overdue | Unassigned | $50 | ||
| 4160-Long Valley Rambler-DR Horton | Paper/Wire | Sep 28, 2026 | 7d overdue | Unassigned | 2026-09-29 | $1,418 | |
| 4160-Long Valley Rambler-DR Horton | Porch OSB | Sep 28, 2026 | 7d overdue | Unassigned | $85 | ||
| 4296-Long Valley-DR Horton | Housewrap | Oct 3, 2026 | 2d overdue | Unassigned | $153 | ||
| 4173-Long Valley-DR Horton | Housewrap | Oct 3, 2026 | 2d overdue | Unassigned | $68 | ||
| 4266-Long Valley-DR Horton | Rock | Oct 3, 2026 | 2d overdue | Unassigned | 2026-09-29 | $773 | |
| 52-Zion Shores-Split Rock | Stucco Color | Oct 3, 2026 | 2d overdue | Unassigned | $4,818 | ||
| 33-Legacy at Sand Hollow-Visionary | Stucco Color | Oct 3, 2026 | 2d overdue | Unassigned | $1,799 | ||
| 4158-Long Valley Rambler-DR Horton | Stucco Color | Oct 5, 2026 | today | Unassigned | $1,656 | ✅ 2026-09-21: 4 Days - Cannot finish lath at back patio since slider door will be missing - Daniel 2026-09-25 | |
| 4163-Long Valley Rambler-DR Horton | Stucco Color | Oct 7, 2026 | in 2d | Unassigned | $1,303 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Bldg C-Residence at Millcreek-Rimrock | Scratch Coat | Jul 16, 2026 | 81d overdue | Unassigned | $1,811 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Penetration Sealing | Aug 15, 2026 | 51d overdue | Unassigned | $0 | ||
| White Dome Chapel-St George-Grass Creek | Set Scaff | Aug 27, 2026 | 39d overdue | Unassigned | $57 | ||
| Bldg RU-1-ARA Southwest-Campbell Construction | Set Scaff | Sep 16, 2026 | 19d overdue | Unassigned | $2,000 | West Walls Setup | |
| Garage 4-Residence at Millcreek-Rimrock | Rock | Sep 18, 2026 | 17d overdue | Unassigned | 2026-09-02 | $1,190 | |
| Garage 3-Residence at Millcreek-Rimrock | Rock | Sep 25, 2026 | 10d overdue | Unassigned | $1,148 | ||
| Garage 3-Residence at Millcreek-Rimrock | Scratch Coat | Sep 25, 2026 | 10d overdue | Unassigned | $127 | ||
| Garage 3-Residence at Millcreek-Rimrock | Stucco Brown | Sep 25, 2026 | 10d overdue | Unassigned | $2,178 | ||
| Bldg A-Residence at Millcreek-Rimrock | Housewrap | Sep 30, 2026 | 5d overdue | Unassigned | $1,088 |
| Job | Task | Assigned | Age | Status | Materials due | Pay | Delay / notes |
|---|---|---|---|---|---|---|---|
| Cascade West Haven Warehouse-Overhead Projects (Ogden)-Unknown | Misc. Work | Aug 17, 2026 | 49d overdue | Unassigned | $0 | Por favor de pintar el parte exterior enfrente de el edeficio. Solomante el parte blanco. Por favor de marcar me si tiene preguntas. FP |
Filter applied (corporate equivalent of the TrackVia view Tasks Ready For Assignment - My Division, view 2607 / filter 3955, with the division scoping removed):
Assigned Task Date is not blankTeam (Task Team) is blankCompleted Date/Time is blankTeam and Team Name agree on every record
(0 disagreements), so "no team assigned" is unambiguous.Crew availability (the trade-axis tables) comes from MCP Task Team Info (view 2835), 304 crews, filtered to the hand-raise checkbox ¿Listo para otro trabajo?: